FA4803-16-T-0002-0001.pdf

PDF 35 KB Posted

Attached to
Shaw AFB Aircraft Fire Training Facility Inspection/Maintenance/Repair
Solicitation number
FA4803-16-T-0002
Issued by

About this file

FA4803-16-T-0002-0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3U3CE5328A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. To amend the description for CLIN 0002, 1002, 2002, 3002 and 4002.

2. Amend the Statement of Work to reflect changes for repairs.

SEE SUMMARY OF CHANGES

**All other terms and condition remains unchanged.**

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Mar-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4803-16-T-0002

X 9B. DATED (SEE ITEM 11)

19-Feb-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Mar-2016

CODE

20TH CONTRACTING SQUADRON/LGCA (FA4803)

321 CULLEN STREET

SHAW AFB SC 29152

FA4803 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4803-16-T-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 29-Feb-2016 02:00 PM to 18-Mar-2016 02:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The CLIN type priced has been deleted.

The CLIN extended description has changed from REPAIR IAW Statement of Work. POP 01-APR-2016 TO 31-MAR-2017 to Provide all management, labor, material, equipment, tools, transportation and other items necessary to replace 3 defective igniters with splice kits, repair 3 coax valve and 2 air line leaks IAW .O. 35E1-2-13- 1, 25 June 2013 edition. The contractor shall submit a quote with a cost break down to the contracting officer for approval IAW the Statement of Work. POP 01-APR-2016 TO 31-MAR-2017.

CLIN 1001

The option status has changed from No Status to Option.

CLIN 1002

The CLIN extended description has changed from REPAIR IAW Statement of Work. POP 01-APR-2017 TO 31-MAR-2018 to The Contractor shall provide parts, tools, and labor to remove, replace, and repair items IAW T.O. 35E1-2-13-1, 25 June 2013 edition, manufacturer’s instructions, industry practices, and local, state, and Federal procedures. The quoted priced for this CLIN shall reflect the estimated costs of repairs for the full Option Year. The Contractor will be reimbursed for costs incurred for repairs (to include labor). The Contractor shall submit a cost estimate to the Contracting Officer for written approval prior to work performance. The Government reserves the right to determine which repairs are to be performed in order to maintain compliance with the T.O. and control costs. The cost estimate shall include a description of the repairs required, the T.O. reference that supports the repair, and the estimated cost of the repair (to include labor). If the actual cost of the repairs for this CLIN exceed the proposed amount for this CLIN (to include labor), then the Contractor shall provide the Contracting Officer with three cost estimates for the remaining Option Year repairs (to include labor) and receive approval from the Contracting Officer before proceeding further. NOTE: The Contractor shall base all labor costs upon the labor rates incorporated at the time this Option Year was exercised. All labor rates shall comply with the Service Contract Act/Service Contract Labor Standards and the Wage Determination incorporated at the time this Option Year was exercised.POP 01-APR-2017 TO 31-MAR-2018.

CLIN 2001

CLIN 2002

The CLIN extended description has changed from REPAIR IAW Statement of Work. 01-APR-2018 TO 31-MAR-2019 to The Contractor shall provide parts, tools, and labor to remove, replace, and repair items IAW T.O.

35E1-2-13-1, 25 June 2013 edition, manufacturer’s instructions, industry practices, and local, state, and Federal procedures. The quoted priced for this CLIN shall reflect the estimated costs of repairs for the full Option Year. The Contractor will be reimbursed for costs incurred for repairs (to include labor). The Contractor shall submit a cost estimate to the Contracting Officer for written approval prior to work performance. The Government reserves the right to determine which repairs are to be performed in order to maintain compliance with the T.O. and control costs. The cost estimate shall include a description of the repairs required, the T.O. reference that supports the repair, and the estimated cost of the repair (to include labor). If the actual cost of the repairs for this CLIN exceed the proposed amount for this CLIN (to include labor), then the Contractor shall provide the Contracting Officer with three cost estimates for the remaining Option Year repairs (to include labor) and receive approval from the Contracting Officer before proceeding further. NOTE: The Contractor shall base all labor costs upon the labor rates incorporated at the time this Option Year was exercised. All labor rates shall comply with the Service Contract Act/Service Contract Labor Standards and the Wage Determination incorporated at the time this Option Year was exercised.POP 01-APR-2018 TO 31-MAR-2019.

CLIN 3001

CLIN 3002

The CLIN extended description has changed from REPAIR IAW Statement of Work. 01-APR-2019 TO 31-MAR-2020 to The Contractor shall provide parts, tools, and labor to remove, replace, and repair items IAW T.O.

35E1-2-13-1, 25 June 2013 edition, manufacturer’s instructions, industry practices, and local, state, and Federal procedures. The quoted priced for this CLIN shall reflect the estimated costs of repairs for the full Option Year. The Contractor will be reimbursed for costs incurred for repairs (to include labor). The Contractor shall submit a cost estimate to the Contracting Officer for written approval prior to work performance. The Government reserves the right to determine which repairs are to be performed in order to maintain compliance with the T.O. and control costs. The cost estimate shall include a description of the repairs required, the T.O. reference that supports the repair, and the estimated cost of the repair (to include labor). If the actual cost of the repairs for this CLIN exceed the proposed amount for this CLIN (to include labor), then the Contractor shall provide the Contracting Officer with three cost estimates for the remaining Option Year repairs (to include labor) and receive approval from the Contracting Officer before proceeding further. NOTE: The Contractor shall base all labor costs upon the labor rates incorporated at the time this Option Year was exercised. All labor rates shall comply with the Service Contract Act/Service Contract Labor Standards and the Wage Determination incorporated at the time this Option Year was exercised. POP: 01-APR-2019 TO 31-MAR-2020.

CLIN 4001

CLIN 4002

The CLIN extended description has changed from REPAIR IAW Statement of Work. 01-APR-2020 TO 31-MAR-2021 to The Contractor shall provide parts, tools, and labor to remove, replace, and repair items IAW T.O.

35E1-2-13-1, 25 June 2013 edition, manufacturer’s instructions, industry practices, and local, state, and Federal procedures. The quoted priced for this CLIN shall reflect the estimated costs of repairs for the full Option Year. The Contractor will be reimbursed for costs incurred for repairs (to include labor). The Contractor shall submit a cost estimate to the Contracting Officer for written approval prior to work performance. The Government reserves the right to determine which repairs are to be performed in order to maintain compliance with the T.O. and control costs. The cost estimate shall include a description of the repairs required, the T.O. reference that supports the repair, and the estimated cost of the repair (to include labor). If the actual cost of the repairs for this CLIN exceed the proposed amount for this CLIN (to include labor), then the Contractor shall provide the Contracting Officer with three cost estimates for the remaining Option Year repairs (to include labor) and receive approval from the Contracting Officer before proceeding further. NOTE: The Contractor shall base all labor costs upon the labor rates incorporated at the time this Option Year was exercised. All labor rates shall comply with the Service Contract Act/Service Contract Labor Standards and the Wage Determination incorporated at the time this Option Year was exercised.POP: 01-APR-2020 TO 31-MAR-2021.

The option status has changed from No Status to Option.

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work 8 26-JAN-2016 Attachment 2 Wage Determination 10 29-DEC-2015 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Wage Determination 10 29-DEC-2015 Attachment 2 Statement of Work Rev 1 8 11-MAR-2016 Attachment 3 TO 35E1-2-13-1 256 25-JUN-2013

(End of Summary of Changes)

File details come from the government source that posted it. Updated .