Att_4_Price_List.doc
DOC document 5 MB Posted
- Attached to
- Packing and Crating Shaw AFB, SC Federal contract opportunity
- Solicitation number
- FA4803-14-R-0001
About this file
Att 4 Price List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4803-14-R-0001-0001_Amendment.pdf | ||
| Att_G7.doc | DOC document | |
| FA4803-14-R-0001_Solicitation.doc | DOC document | |
| Att_G5.pdf | ||
| Att_1_PWS.doc | DOC document | |
| Att_G4.pdf | ||
| Att_G1.pdf | ||
| Att_G2.pdf | ||
| Att_G3.pdf | ||
| Att_6_Past_Performance.doc | DOC document | |
| Att_5_Basic_Insur_Comp.doc | DOC document | |
| Att_2_QASP.doc | DOC document | |
| Att_G6.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4803-14-R-0001
ESTIMATED QUANTITIES
BASE YEAR AREA 38
CLINS 0001 – 0003
1 JAN 2014– 31 DEC 2014
The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to bid on all items will render the bid non responsive.
Government’s Estimated
Maximum Daily Requirement
Government’s Minimum Acceptable Daily Capability
Bidder’s Guaranteed
Daily
Capability OUTBOUND (Schedule I) Area 38 INBOUND (Schedule II)
Area 38 INTRA-CITY AREA (Schedule III) Area 38
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
SCHEDULE I OUTBOUND SERVICES
CLIN 0001
Item 0001 Complete Service - Outbound (HHG) Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA At member/employee residence:
Container, Commercial Spec ASTM-D4169-01, or SDDC Pamphlet 55-12
| 350 |
| NCWT |
AB At contractor’s facility:
Container, Commercial Spec
ASTM-D4169-01, or SDDC Pamphlet 55-12
| 10 |
| NCWT |
Item 0002 Outbound HHG From Nontemporary Storage Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) pre-move survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item 0003.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Pickup by contractor: Container, Commercial Spec ASTM-D4169-01, or SDDC Pamphlet 55-12 |
| 600 |
| NCWT |
AB Delivered to contractor:
ASTM-D4169-01, or
SDDC Pamphlet 55-12
| 5 |
| NCWT |
Item 0003 Complete Service-Outbound-HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pamphlet 55-12 Service must be the same as Item 0001 or Item 0002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec
ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Government-Furnished Containers: Overseas Pack Overflow Articles |
| 10 |
| NCWT |
AB Government-Furnished Containers:
Overseas Pack Oversize Articles
NCWT
AC Government-Furnished Containers:
Overseas Pack Other Shipments
NCWT
AD Government-Furnished Containers:
Domestic Pack: Overflow Articles
NCWT
AE Government-Furnished Containers:
Domestic Pack: Oversize Articles
NCWT
AF Government-Furnished Containers:
Domestic Pack: Other Shipments
NCWT
AG Contractor-Furnished Containers:
Overseas Pack: Overflow Articles
NCWT
AH Contractor-Furnished Containers:
Overseas Pack: Oversize Articles
NCWT
AJ Contractor-Furnished Containers:
Overseas Pack: Other Shipments
NCWT
| AK Domestic Pack: Overflow Articles |
| 10 |
| NCWT |
| AL Domestic Pack: Oversize Articles |
| 10 |
NCWT
| AM Domestic Pack: Other Shipments |
| 10 |
NCWT
Item 0004 Complete Service-Outbound Unaccompanied Baggage Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering Officer.)
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Government-Furnished Containers:
Drayage Included
| 100 |
| NCWT |
AB Government-Furnished Containers:
Drayage Not Included
NCWT
AC Contractor-Furnished Containers:
Drayage Included
NCWT
AD Contractor-Furnished Containers:
NCWT
Item 0005 Complete Service-Outbound -Unaccompanied Baggage from Nontemporary Storage Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Government-Furnished Containers:
Drayage Included
| 5 |
| NCWT |
AB Government-Furnished Containers:
| 5 |
| NCWT |
AC Contractor-Furnished Containers:
| 5 |
| NCWT |
AD Contractor-Furnished Containers:
| 5 |
| NCWT |
Item 0006 Outbound Service-Unaccompanied Baggage Packed by Member/Employee Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include containerization in outer shipping containers as ordered by the contracting officer.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Containerization Not Required:
Drayage Included
| 5 |
| GCWT |
AB Containerization Not Required:
| 5 |
| GCWT |
AC Containerization Required:
| 5 |
| NCWT |
AD Containerization Required:
| 5 |
| NCWT |
Item 0007 Outbound Service-Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility Service must be the same as Item 0006 above except that service must include two or more shipments picked up from a Government office, warehouse, or facility.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Containerization Not Required:
Drayage Included
| 5 |
| GCWT |
AB Containerization Required:
| 5 |
| NCWT |
Item 0008 Expensive and Valuable Items Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Drayage Included |
| 5 |
| NCWT |
| AB Drayage Not Included |
| 5 |
| NCWT |
Item 0009 Storage Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each
30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| 5 |
| NCWT |
| 5 |
| NCWT |
Item 0010 Containers Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Container (ASTM-D4169-01) |
| 5 |
| each |
| AB Container (SDDC Pamphlet 55-12) |
| 5 |
each
| AC Crate (ASTM-D6039/D6039M-02) |
| 500 |
| cu ft or fraction thereof |
Item 0011 Remarking, Coopering and Assembly/Disassembly Service AA Remarking of Shipments for Reconsignment Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment, and loading on the hauling carrier’s vehicle.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 5 |
| each |
AB Coopering Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands must be accomplished at no expense to the Government.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 5 |
| each |
AC/AD Assembly/Disassembly of Government-Owned Containers Contractor will assemble Government- owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AC Assembly |
| 5 |
| each |
| AD Disassembly |
| 5 |
| each |
Item 0012 Drayage Beyond the Contract Area of Performance Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 100 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Household goods loaded mile |
| 100 |
| Per |
| AB Unaccompanied baggage |
| 100 |
| per |
Loaded mile
Item 0013 Attempted Pickup When the initial attempt to pick up a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Household goods |
| 10 |
| each shpmt |
| ______ |
| AB Unaccompanied baggage |
| 10 |
| Each shpmt |
| _______ |
NOTE: All Above Items are included in the evaluation of bids
Item 0014 Additional Services The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
RECAPITULATION SCHEDULE I
Schedule Total – Area 38 $......... …..
SCHEDULE II INBOUND SERVICES
CLIN 0002
Item 0015 Complete Service-Inbound HHG Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.
AA
Area 38
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| 175 |
| NCWT |
AB Complete Service – Inbound HHG Service must be same as Item 0015 above except that drayage of shipment to residence is not required.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 50 |
| NCWT |
AC Complete Service- Inbound HHG Service must be the same as Item 0015 above except removal of items from outer container will be at the contractor’s facility and articles will be drayed to member’s/employee’s residence.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 5 |
| NCWT |
Item 0016 Inbound Service-Contractor Facility HHG Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 5 |
| NCWT |
Item 0017 Complete Service-Expensive and Valuable Items Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Drayage Included |
| 5 |
| NCWT |
| AB Drayage Not Included |
| 5 |
| NCWT |
Item 0018AA Complete Service-Inbound -Unaccompanied Baggage Service must include drayage from contractor’s facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to member’s/employee’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 125 |
| NCWT |
Item 0018AB Complete Service-Inbound -Unaccompanied Baggage Service must be same as Item 0018AA except that drayage to residence is not required.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 50 |
| NCWT |
Item 0018AC Inbound Service - Contractor Facility Unaccompanied Baggage Service must be the same as Item 0018AA except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor’s facility.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 5 |
| NCWT |
Item 0019 Storage Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth workday following date of contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 900 |
| NCWT |
Item 0020 Remarking, Coopering, and Assembly/Disassembly Service AA Remarking of Shipments for Reconsignment Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 5 |
| Each piece |
AB Coopering Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or costs of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 5 |
| Each piece |
AC Assembly/Disassembly of Government-Owned Containers Contractor will assemble Government- owned containers. The Government will furnish component parts. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AC Assembly |
| 2 |
| each |
| AD Disassembly |
| 2 |
| each |
Item 0021 Attempted Delivery When the initial attempt to deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Household Goods |
| 5 |
| ea shpmt |
| AB Unaccompanied Baggage |
| 5 |
| ea shpmt |
Item 0022 Reweighing Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Household Goods |
| 6 |
| ea shpmt |
| AB Unaccompanied Baggage |
| 6 |
| ea shpmt |
Item 0023 Drayage Beyond the Contract Area of Performance Service must consist of drayage of computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Household Goods loaded mile |
| 100 |
| per |
| AB Unaccompanied baggage loaded mile |
| 100 |
| per |
Item 0024 Partial Withdrawal Service must be the same as Items 0015, 0016, 0017, or 0018, except a partial removal of the items from the outer container will be performed at the contractor’s facility. Articles not removed from the shipment will remain at the contractor’s facility.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
AA Household Goods Drayage included
| 5 |
| NCWT |
AB Household Goods Drayage not included
| 5 |
| NCWT |
AC Unaccompanied Baggage Drayage included
| 5 |
| NCWT |
AD Unaccompanied Baggage
| 5 |
| NCWT |
Item 0029-0030. Reserved (See additional services Item 14).
Note: All above Items are included in the evaluation of bids
RECAPITULATION SCHEDULE II
Schedule Total Area 38 $
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES
CLIN 0003
Item 0025 Complete Service for Intra-City and Intra-Area Moves Service must include a pre-move survey, servicing of appliances, packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials from residence.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Unit
| 9000 |
| NCWT |
Item 0026 Attempted Pickup or Delivery When the initial attempt to pick up or deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Unit Total
| AA Attempted Pickup |
| 4 |
each shpmt
AB Attempted Delivery 4 each shpmt
Item 0027 Drayage Beyond the Contract Area of Performance Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 100 miles. Mileage must be computed on the shortest highway distance commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Unit
| 100 |
| Per loaded mile |
Note: All above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule Total-Area 38 $
ESTIMATED QUANTITIES
BASE YEAR AREA 39
CLINS 0004 – 0006
1 JAN 2014– 31 DEC 2014
The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to bid on all items will render the bid non responsive.
Government’s Estimated
Capability OUTBOUND (Schedule I) Area 39 INBOUND (Schedule II)
Area 39
Area 39
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
CLIN 0004
Item 0001 Complete Service - Outbound (HHG) Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA At member/employee residence:
Container, Commercial Spec ASTM-D4169-01, or SDDC Pamphlet 55-12
| 200 |
| NCWT |
AB At contractor’s facility:
ASTM-D4169-01, or SDDC Pamphlet 55-12
| 5 |
| NCWT |
Item 0002 Outbound HHG From Nontemporary Storage Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) pre-move survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item 0003.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Pickup by contractor: Container, Commercial Spec ASTM-D4169-01, or SDDC Pamphlet 55-12 |
| 10 |
| NCWT |
AB Delivered to contractor:
ASTM-D4169-01, or
SDDC Pamphlet 55-12
| 5 |
| NCWT |
Item 0003 Complete Service-Outbound-HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pamphlet 55-12 Service must be the same as Item 0001 or Item 0002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments
ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Government-Furnished Containers: Overseas Pack Overflow Articles |
| 2 |
| NCWT |
AB Government-Furnished Containers:
NCWT
AC Government-Furnished Containers:
NCWT
AD Government-Furnished Containers:
NCWT
AE Government-Furnished Containers:
NCWT
AF Government-Furnished Containers:
NCWT
AG Contractor-Furnished Containers:
NCWT
AH Contractor-Furnished Containers:
NCWT
AI Contractor-Furnished Containers:
NCWT
| AK Domestic Pack: Overflow Articles |
| 2 |
| NCWT |
| AL Domestic Pack: Oversize Articles |
| 2 |
NCWT
| AM Domestic Pack: Other Shipments |
| 2 |
NCWT
Item 0004 Complete Service-Outbound Unaccompanied Baggage Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering Officer.)
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Government-Furnished Containers:
Drayage Included
| 10 |
| NCWT |
AB Government-Furnished Containers:
NCWT
AC Contractor-Furnished Containers:
NCWT
AD Contractor-Furnished Containers:
NCWT
Item 0005 Complete Service-Outbound -Unaccompanied Baggage from Nontemporary Storage Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Government-Furnished Containers:
Drayage Included
| 2 |
| NCWT |
AB Government-Furnished Containers:
| 2 |
| NCWT |
AC Contractor-Furnished Containers:
| 2 |
| NCWT |
AD Contractor-Furnished Containers:
| 5 |
| NCWT |
Item 0006 Outbound Service-Unaccompanied Baggage Packed by Member/Employee Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include containerization in outer shipping containers as ordered by the contracting officer.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Containerization Not Required:
Drayage Included
| 2 |
| GCWT |
AB Containerization Not Required:
| 2 |
| GCWT |
AC Containerization Required:
| 2 |
| NCWT |
AD Containerization Required:
| 2 |
| NCWT |
Item 0007 Outbound Service-Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility Service must be the same as Item 0006 above except that service must include two or more shipments picked up from a Government office, warehouse, or facility.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Containerization Not Required:
Drayage Included
| 2 |
| GCWT |
AB Containerization Required:
| 2 |
| NCWT |
Item 0008 Expensive and Valuable Items Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Drayage Included |
| 2 |
| NCWT |
| AB Drayage Not Included |
| 2 |
| NCWT |
Item 0009 Storage Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each
30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 5 |
| NCWT |
Item 0010 Containers Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Container (ASTM-D4169-01) |
| 5 |
| each |
| AB Container (SDDC Pamphlet 55-12) |
| 5 |
each
| AC Crate (ASTM-D6039/D6039M-02) |
| 500 |
| cu ft or fraction thereof |
AA Remarking of Shipments for Reconsignment Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment, and loading on the hauling carrier’s vehicle.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 2 |
| each |
AB Coopering Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands must be accomplished at no expense to the Government.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 2 |
| each |
AC Assembly/Disassembly of Government-Owned Containers Contractor will assemble Government- owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AD Assembly |
| 2 |
| each |
| AE Disassembly |
| 2 |
| each |
computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Household goods loaded mile |
| 50 |
| Per |
| AB Unaccompanied baggage |
| 50 |
| per |
Item 0013 Attempted Pickup When the initial attempt to pick up a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Household goods |
| 5 |
| each shpmt |
| ______ |
| AB Unaccompanied baggage |
| 5 |
| Each shpmt |
| _______ |
Item 0014 Additional Services The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
RECAPITULATION SCHEDULE I
Schedule Total – Area 39
SCHEDULE II INBOUND SERVICES
CLIN 0005
Item 0015 Complete Service-Inbound HHG Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 120 |
| NCWT |
Item 0016 Complete Service – Inbound HHG Service must be same as Item 0015 above except that drayage of shipment to residence is not required.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 20 |
| NCWT |
Item 0017 Complete Service- Inbound HHG Service must be the same as Item 0015 above except removal of items from outer container will be at the contractor’s facility and articles will be drayed to member’s/employee’s residence.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 2 |
| NCWT |
Item 0018 Inbound Service-Contractor Facility HHG Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 2 |
| NCWT |
Item 0019 Complete Service-Expensive and Valuable Items Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Drayage Included |
| 2 |
| NCWT |
| AB Drayage Not Included |
| 2 |
| NCWT |
Item 0020 Complete Service-Inbound -Unaccompanied Baggage Service must include drayage from contractor’s facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to member’s/employee’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 100 |
| NCWT |
Item 0021 Complete Service-Inbound -Unaccompanied Baggage Service must be same as Item 0020 except that drayage to residence is not required.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 2 |
| NCWT |
Item 0022 Inbound Service - Contractor Facility Unaccompanied Baggage Service must be the same as Item 0020 except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor’s facility.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 2 |
| NCWT |
Item 0023 Storage Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth workday following date of contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 70 |
| NCWT |
Item 0024 Remarking, Coopering, and Assembly/Disassembly Service AA Remarking of Shipments for Reconsignment Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 2 |
| Each piece |
AB Coopering Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or costs of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
| 2 |
| Each piece |
AC Assembly/Disassembly of Government-Owned Containers Contractor will assemble Government- owned containers. The Government will furnish component parts. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AD Assembly |
| 2 |
| each |
| AE Disassembly |
| 2 |
| each |
Item 0025 Attempted Delivery When the initial attempt to deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Household Goods |
| 2 |
| ea shpmt |
| AB Unaccompanied Baggage |
| 2 |
| ea shpmt |
Item 0026 Reweighing Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Household Goods |
| 2 |
| ea shpmt |
| AB Unaccompanied Baggage |
| 2 |
| ea shpmt |
Item 0027 Drayage Beyond the Contract Area of Performance Service must consist of drayage of computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
| AA Household Goods loaded mile |
| 50 |
| per |
| AB Unaccompanied baggage loaded mile |
| 50 |
| per |
Item 0028 Partial Withdrawal Service must be the same as Items 0015, 0016, 0020, or 0021, except a partial removal of the items from the outer container will be performed at the contractor’s facility. Articles not removed from the shipment will remain at the contractor’s facility.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Price |
| Unit |
Total
AA Household Goods Drayage included
| 2 |
| NCWT |
AB Household Goods
| 2 |
| NCWT |
AC Unaccompanied Baggage
| 2 |
| NCWT |
AD Unaccompanied Baggage
| 2 |
| NCWT |
RECAPITULATION SCHEDULE II
Schedule Total Area 39
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES
CLIN 0006
Item 0031 Complete Service for Intra-City and Intra-Area Moves Service must include a pre-move survey, servicing of appliances, packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials from residence.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Unit
| 200 |
| NCWT |
Item 0032 Attempted Pickup or Delivery When the initial attempt to pick up or deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Unit Total
| AA Attempted Pickup |
| 1 |
| each shpmt |
AB Attempted Delivery 1 each shpmt
Item 0033 Drayage Beyond the Contract Area of Performance Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 100 miles. Mileage must be computed on the shortest highway distance commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.
| Area 39 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Unit
| 10 |
| Per loaded mile |
Schedule Total-Area 39 $
ESTIMATED QUANTITIES
OPTION YEAR ONE AREA 38
CLINS 1001 – 1003
1 JAN 2015– 31 DEC 2015
The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to bid on all items will render the bid non responsive.
Government’s Estimated
Capability OUTBOUND (Schedule I) Area 38
INBOUND (Schedule II)
Area 38
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
CLIN 1001
Item 0001 Complete Service - Outbound (HHG) Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA At member/employee residence:
Container, Commercial Spec ASTM-D4169-01, or SDDC Pamphlet 55-12
| 350 |
| NCWT |
AB At contractor’s facility:
ASTM-D4169-01, or SDDC Pamphlet 55-12
| 10 |
| NCWT |
Item 0002 Outbound HHG From Nontemporary Storage Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) pre-move survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item 0003.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Pickup by contractor: Container, Commercial Spec ASTM-D4169-01, or SDDC Pamphlet 55-12 |
| 600 |
| NCWT |
AB Delivered to contractor:
ASTM-D4169-01, or
SDDC Pamphlet 55-12
| 5 |
| NCWT |
Item 0003 Complete Service-Outbound-HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pamphlet 55-12 Service must be the same as Item 0001 or Item 0002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments
ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Government-Furnished Containers: Overseas Pack Overflow Articles |
| 10 |
| NCWT |
AB Government-Furnished Containers:
NCWT
AC Government-Furnished Containers:
NCWT
AD Government-Furnished Containers:
NCWT
AE Government-Furnished Containers:
NCWT
AF Government-Furnished Containers:
NCWT
AG Contractor-Furnished Containers:
NCWT
AH Contractor-Furnished Containers:
NCWT
AI Contractor-Furnished Containers:
NCWT
| AK Domestic Pack: Overflow Articles |
| 10 |
| NCWT |
| AL Domestic Pack: Oversize Articles |
| 10 |
NCWT
| AM Domestic Pack: Other Shipments |
| 10 |
NCWT
Item 0004 Complete Service-Outbound Unaccompanied Baggage Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering Officer.)
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Government-Furnished Containers:
Drayage Included
| 100 |
| NCWT |
AB Government-Furnished Containers:
NCWT
AC Contractor-Furnished Containers:
NCWT
AD Contractor-Furnished Containers:
NCWT
Item 0005 Complete Service-Outbound -Unaccompanied Baggage from Nontemporary Storage Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Government-Furnished Containers:
Drayage Included
| 5 |
| NCWT |
AB Government-Furnished Containers:
| 5 |
| NCWT |
AC Contractor-Furnished Containers:
| 5 |
| NCWT |
AD Contractor-Furnished Containers:
| 5 |
| NCWT |
Item 0006 Outbound Service-Unaccompanied Baggage Packed by Member/Employee Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include containerization in outer shipping containers as ordered by the contracting officer.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Containerization Not Required:
Drayage Included
| 5 |
| GCWT |
AB Containerization Not Required:
| 5 |
| GCWT |
AC Containerization Required:
| 5 |
| NCWT |
AD Containerization Required:
| 5 |
| NCWT |
Item 0007 Outbound Service-Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility Service must be the same as Item 0006 above except that service must include two or more shipments picked up from a Government office, warehouse, or facility.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
AA Containerization Not Required:
Drayage Included
| 5 |
| GCWT |
AB Containerization Required:
| 5 |
| NCWT |
Item 0008 Expensive and Valuable Items Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Drayage Included |
| 5 |
| NCWT |
| AB Drayage Not Included |
| 5 |
| NCWT |
Item 0009 Storage Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each
30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 5 |
| NCWT |
| 5 |
| NCWT |
Item 0010 Containers Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AA Container (ASTM-D4169-01) |
| 5 |
| each |
| AB Container (SDDC Pamphlet 55-12) |
| 5 |
each
| AC Crate (ASTM-D6039/D6039M-02) |
| 500 |
| cu ft or fraction thereof |
AA Remarking of Shipments for Reconsignment Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment, and loading on the hauling carrier’s vehicle.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 5 |
| each |
AB Coopering Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands must be accomplished at no expense to the Government.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Total
| 5 |
| each |
AC Assembly/Disassembly of Government-Owned Containers Contractor will assemble Government- owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
| Area 38 |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
| AD Assembly |
| 5 |
| each |
| AE Disassembly |
| 5 |
| each |
computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .