Att_G7.doc

DOC document 53 KB Posted

Attached to
Packing and Crating Shaw AFB, SC Federal contract opportunity
Solicitation number
FA4803-14-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Att G7

View the file

Other files for this federal contract opportunity

Other files attached to Packing and Crating Shaw AFB, SC, newest first.
File Type Posted
FA4803-14-R-0001-0001_Amendment.pdf PDF
FA4803-14-R-0001_Solicitation.doc DOC document
Att_4_Price_List.doc DOC document
Att_G2.pdf PDF
Att_G3.pdf PDF
Att_6_Past_Performance.doc DOC document
Att_5_Basic_Insur_Comp.doc DOC document
Att_2_QASP.doc DOC document
Att_G6.pdf PDF
Att_G5.pdf PDF
Att_1_PWS.doc DOC document
Att_G4.pdf PDF
Att_G1.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICES SUMMARY (SS)

Performance Objective

PWS

Reference Performance Threshold

(Monthly unless otherwise specified)

SS1- Preparation, Packing, Loading, and Containerization of Personal Property for onward movement
Part 1, paragraphs A.4 and A.7
No more than 3% of shipments are incorrectly packed, loaded and containerized per month. The COR’s goal will be to evaluate 80% of the Contractor’s performance by utilizing the DD Form 2773.
SS2- Pick-up/Delivery of Personal Property
Part 1, paragraph A3
No more than 5% per month of the total number of shipments, or validated Customer Complaints, for untimely pick-up/delivery. The COR’s goal will be to evaluate 80% of the Contractor’s performance by utilizing the DD Form 2773.
SS3- Preparation and Return of Documentation
Part 1, paragraph A 2b, d, e, i, 4e, 5, and 8
98% on-time submission of completed, accurate, legible documentation to Joint Personal Property Shipping Office (JPPSO) per month. COR will ensure monthly to validate that Performance Threshold is met
SS4- Maintain Adequate Facilities and Serviceable Equipment
Part 1, paragraph A7.4, and 10
Less than three violations per quarter.
SS5- Protection and Accountability of Government Owned Containers
Appendix G, Part 1 paragraphs A7a, 7a(1), 7e and 7g
No more than 2% of total number of GOCs improperly protected/constructed during the quarter. No more than one failure per month to re-cooper GOCs within specified time.
SS6- Quality Assurance Surveillance Plan (QASP)
QASP
No more than once a quarter; QASP will be reviewed by the COR to ensure Contractor is adhering to plan outlined in document.

CORs will:

a. Spot-check when the Contractor picks-up/delivers HHGS shipments.

b. Check quarterly at the Contractor’s warehouse.

c.

CORs will randomly check to ensure re-coopering of GOCs is performed by the Contractor, only when authorized by JPPSO. All repairs will be done prior to delivery to residence.

d. COR will ensure the Contractor, on an as needed basis, delivers GOCs to the site identified by JPPSO,

e. The CORs will validate that the inspection and disposition schedule of serviceable/unserviceable containers is complied with; serviceable or unserviceable containers have not been co-mingled; and that these two categories of containers are kept segregated.

f. The COR will validate that Contractors have provided JPPSO with a Government Owned Container Report (AF Form 384) fifteen (15) days after the contract start date and thereafter by the 5th of the month and that the Contractor maintains an accurate, up to date count of all Government Owned Containers.

g. The COR as a onetime check will ensure the new outbound DPM Contractor picked up the serviceable empty GOCs from the previous Contractor(s) not later than thirty (30) calendar days after commencement of the contract.

1.1. Inspection of Services.

The Government has the right to inspect all services identified within by the contract (SS and Non-SS items), to the extent practicable at all times and places during the term of the contract.

1.2. Non-Compliance

1.2.1. Memorandum For Record (MFR)

If the COR finds that the Contractor has deviated from established standards, but the deviation has little bearing on the service provided, the COR will document the finding in a memorandum for record (MFR). However, if the COR repeatedly identifies the same minor finding, it may be an indication that a major finding is occurring because the Contractor has not taken proper steps to prevent recurrence.

1.2.2 Contract Discrepancy Report (CDR)

When the Contractor fails to meet contract performance requirements, the Government COR, CA, or CO may prepare a CDR. This report is forwarded to the CO for review, and subsequently processed through the Contractor for action/explanation before being returned to the CO. Upon receipt, the CO will review the response and determine whether to accept the Contractor's position, determine corrective action (reduction in the monthly payment due to unacceptable performance, cure notice, show cause, etc.), or take other appropriate contractual action. The Government reserves the right to make a partial payment for services performed prior to receipt and evaluation of the Contractor's response to a CDR.