Atch 1 SOW dated 22 Apr 2024.pdf

PDF 455 KB Posted

Attached to
Joint Task Force North Unit - Privacy Fence Slats Install
Solicitation number
FA4801-24-Q-0438
Issued by

About this file

This document is a Statement of Work (SOW) for the installation of privacy fence slats around the perimeter of the Joint Task Force North (JTFN) facility located at Fort Bliss, TX.

The SOW requires a turnkey installation of HDPE privacy slats into the existing 6-foot 6-inch tall chain-link fence surrounding JTFN. The fence is approximately 4,000 feet long, and the slats shall be 6 feet in height with a 6-inch gap at the bottom. The slats must be a beige/sand color and include a bottom slat lock for stability. The contractor is responsible for providing all labor, equipment, materials, and cleanup. The performance period is 60 days, with work hours from Monday to Friday, 8:00 am to 4:00 pm. The related federal contract opportunity has the solicitation number FA4801-24-Q-0438 and is being issued by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Questions.docx DOCX document
Combo for Privacy Slats - 15 Apr.docx DOCX document
Combo for Fence Slats.docx DOCX document
Atch 2 RFQ - 52_212-1 Addendum.docx DOCX document
Atch 1 SOW dated 28 Feb 2024.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROJECT NAME: JOINT TASK FORCE NORTH PRIVACY FENCE

FORT BLISS, TX

22 April 2024

1. PROJECT SPECIFIC INFORMATION

a. Location: Joint Task Force North 11603 Old Ironsides Dr El Paso TX 79918

b. User Contact: TSgt Denise Hinojosa

c. Performance Period of Construction: 60 Days

d. Working Hours: Monday-Friday (8:00 am to 4:00 pm)

e. Restricted Area: Yes

2. SCOPE OF WORK

General Requirements:

1. The Contractor shall furnish all labor, equipment, materials, tools, and transportation necessary to accomplish the work.

2. The work area shall be kept reasonably clean at all times. The Contractor shall perform a complete cleanup of the work area at the end of the contract.

3. All debris shall be disposed of off base by the Contractor.

Specific Requirements:

1. Turnkey installation of Privacy Slats around the perimeter of the Joint Task Force North (JTFN). Vendor shall provide the material and installation of the privacy slats into the existing chain-link fence surrounding the JTFN.

2. The privacy slats shall be installed in a vertical direction.

3. The color of the privacy slats shall be Beige / Sand color.

4. Single-wall, flat-angular, extrusion-formulated using HDPE with additives for longevity of color and function.

5. Adds approximately 85% privacy to regular 2in diamond, 11-gauge chain link.

6. The fence is approximately 4,000ft long and 6ft 6in tall. The privacy slats shall be 6ft in height with a 6in gap at the bottom as shown in the examples on the next page.

7. The slats shall include bottom slat lock (as shown in example photos) for added stability during windy conditions.

8. The existing chain-link fence is in good condition with no breaks or tears in the chain-link or the barbwire surrounding the JTFN. The ground-wires that are spread around the perimeter, shall not be hindered, removed, or tampered with in any manner. Vendor may have to skip this ground-wire area for installation of the privacy slat.

END OF STATEMENT OF WORK