Heavy Equipment BBQ - Questions and Answers

20 February 2018

1. In the PWS under section 1.3.2 The Government is identifying that the contractor shall complete tire and/or track repairs and replacement within 24 hours of notification and shall be at no cost to the Government. Is the Government expecting the contractor to pay tire repairs caused by the Government or just for repairs caused by tires that may be worn, previously damaged etc.

a. Machine status, to include tire and track status, is assessed prior to usage, at the middle turnover point, and upon completion of the Period of Performance. Damages caused by the Government will be assessed and settled through damage claims. Another normal wear and tear damage will be accessed based on the tire/track condition at the time of each JLTI process. The Government will only be charged a prorated cost of the tire. All tire/track repairs must be completed IAW PWS guidelines.

2. On the Exhibits, there is a Generator identified requiring an electrician to wire. What will the generator be hooked up to? It states see above, however the Environmental Control units listed above state they should have a Generator and hook up included in the rate.

a. The PWS requirement is a Mobile Mini type office trailer. 20' long with lighting, heat, and

A/C units with a 20KW generator. One Mobile Mini and one 20 KW generator to be hooked up and disconnected by the contractor.

3. Please clarify the exact size of the excavator.

a. The Excavator in the PWS Appendix lists a JD 380G or equivalent type excavator each with buckets and rock hammers.

4. Please describe the "environmental control unit". Are there more complete details on what needs to accomplish?

a. This is a mobile mini office typical of construction site work. It must provide 110 power for computer and miscellaneous office equipment.

b. The PWS requirement is a Mobile Mini type office trailer. 20' long with lighting, heat, and A/C units with a 20KW generator.

5. What size generator is being requested? (The generator below “environmental control unit”)

a. 20KW Generator.

6. Please confirm the total amount of portable toilets and hand washing stations. It appears it's six sets of four toilets (24 total) and six sets of two hand washing stations (12 total)

a. The PWS portable toilet requirement is 4 each portable toilets and 2 each wand washing stations. A total of 6 individual pieces.

7. Will both gasoline and diesel fuel tanks be required?

a. Only diesel tanks are required, per PWS details.

8. In Appendix 1, there is overlap in the missions. Will multiple pieces of the equipment be required during this overlap or will the same equipment stay on rent?

a. The same equipment set will remain, there is no need for additional pieces. This overlap time is used to assess machine operability via JTLI to prepare for the start of the next working phase.

b. The mission changeover is dedicated to close out one mission and prepare for the second mission (JLTI's process and invoicing). The first mission equipment list will remain for the second mission, unless any end items need to be replaced based on operational status.