SOW - Eaglewood Roller 3.5.25.docx

DOCX document 109 KB Posted

Attached to
Langley Golf Course Greens Roller Federal contract opportunity
Solicitation number
FA480025QA047
Issued by
Department of the Air Force Air Combat Command

About this file

This Statement of Work (SOW) details the procurement of a Salsco HP11-III greens roller for Eaglewood Golf Course at Building 1301. The required equipment specifications include a 73" wide swath with a Honda engine, electric start, 6-gallon fuel tank, independently articulating roller housing, rotary brush system, LED light kit, seat with arm rests, topdressing brush kit, and a tilt trailer. Additional requirements include a 5-year warranty, on-site training, and installation during normal workdays (Monday through Friday, 8:00 a.m. to 3:00 p.m.).

The procurement is associated with the Department of the Air Force Air Combat Command, with Chris Davis serving as the point of contact (telephone: 318-348-2255, email: Christopher.davis.115@us.af.mil). The contractor is expected to comply with all federal, state, and local safety and environmental regulations, and to minimize disruption during equipment installation and setup. The solicitation number is FA480025QA047, and the project aims to enhance golf course maintenance equipment at the facility.

View the file

Other files for this federal contract opportunity

Other files attached to Langley Golf Course Greens Roller, newest first.
File Type Posted
Greens Roller Combo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 03 March 2025

SUBJECT: Eaglewood Golf Course Greens Roller

Title: Purchase Greens Roller and Transport trailer Service Request Number: N/AClick here to enter text.

Location: Eaglewood Golf Course Building 1301

1. Scope of Work:

Purchase one (1) Salsco HP11-III or equal greens roller with following options:

5 year warranty 73” wide swath Honda Engine with electric start and 6 gallon fuel tank Cooling fan not air cooled Roller housing that articulate and float independently Rotary Brush system LED light kit Seat upgrade with Arm Rests to help with holding in the seat and operator safety Topdressing brush kit Tilt trailer for safer loading and unloading of machine Purchase training on how to use the new equipment

2. Installation will be during normal workdays-Monday thru Friday from 8:00 a.m. to 3:00 p.m. The contractor will make every effort in as quick and timely manner as possible. The contractor will phase work such that occupants have as little disruption as possible.

3. Contractor will comply with all federal, state and local safety and environmental regulations.

4. Chris Davis is the Point of Contact for this action. Please relate all questions to him at telephone number 318-348-2255 or email at Christopher.davis.115@us.af.mil image1.jpeg

File details come from the government source that posted it. Updated .