Solicitation_Amendment_FA480023B00010005_17Jul23.pdf
PDF 593 KB Posted
- Attached to
- Joint Base Langley-Eustis Painting Indefinite Delivery Indefinite Quantity (IDIQ) Invitation for Bid (IFB) Federal contract opportunity
- Solicitation number
- FA480023B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Atch_4_Bidder_Price_List_1Aug23.xlsx | XLSX spreadsheet | |
| Solicitation_Amendment_FA480023B00010006_1Aug23.pdf | ||
| Revised_Atch_4_Bidder_Price_List_17Jul23.xlsx | XLSX spreadsheet | |
| Atch_9_Gov_Responses_to_Bidders_Questions_17Jul23.pdf | ||
| Revised_Section_M_Eval_Factors_JBLE_Painting_17Jul23.pdf | ||
| Revised_Atch_1_Painting_IDIQ_Specifications_17Jul23.pdf | ||
| Revised_Section_L_Instructions_JBLE_Painting_17Jul23.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of solicitation amendment FA480023B00010005 is to delete the QP-1 Block 14 (Description of Amendment/Modification):
Certification requirement, incorporate a revised Bidder's Price List, provide Government responses to Contractors' questions, and update Sections L and M. This amendment incorporates the following:
A. A revised Attachment 1, Painting IDIQ Specifications, dated 17 July 2023 is hereby incorporated which deletes the QP-1 Certification requirement.
B. A revised Attachment 4, Bidder Price List, dated 17 July 2023 is hereby incorporated. The Price List has been revised to denote separate pricing for Fort Eustis and Langley Air Force Base. The revisions also add additional price list items and narratives.
C. A new Attachment 9, Government Responses to Bidders Questions, dated 17 July 2023 is hereby added.
D. Solicitation Section L, Instruction, Conditions and Notices to Bidders, is revised as follows. Please see "Revised_Section_L_Instructions_JBLE_Painting_17Jul23" PDF document attached (revisions are noted in yellow highlight).
1. Paragraph L-1.1. is changed.
2. Paragraph L-1.6. is changed.
3. Paragraph L-2.1. is changed.
4. Paragraph L-3.3. is changed.
5. Paragraph L-3.5. is changed.
E. Solicitation Section M, Evaluation Factors for Award, is revised as follows. Please see "Revised_Section_M_Eval_Factors_JBLE_Painting_17Jul23" PDF document attached (revisions are noted in yellow highlight).
1. Paragraph M-2.5. is changed.
F. The bid opening date and time remain unchanged as: 3 August 2023 at 2 PM ET.
G. All other terms and conditions remain unchanged.
Section J - List of Attachments
Miscellaneous text in this section has been modified to:
Eight Attachments:
Attachment 1 -- Specifications for Painting IDIQ, 450 Pages, Dated 30 January 2023
Attachment 2 -- Environmental 01 12 00 Special Conditions, 126 Pages, Dated 2 November 2022
Attachment 3 -- Environmental Management Procedure 4.4.6.16, JBLE-Eustis Special Conditions, 60 Pages, Dated 14 June 2021
Attachment 4 -- Bidder Price List
Attachment 5 -- Building Wage Decision VA20230022, Hampton, VA, Dated 13 January 2023
Attachment 6 -- Building Wage Decision VA20230159, Newport News, VA, Dated 13 January 2023
Attachment 7 -- Residential Wage Decision VA20230138, Hampton, VA, Dated 13 January 2023
Attachment 8 -- Residential Wage Decision VA20230140, Newport News, VA, Dated 13 January 2023
Attachment 9 -- Government Responses to Bidder's Questions
FA480023B00010005
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
Section L Instructions, Conditions and Notices to Bidders.
L-1. GENERAL INSTRUCTIONS.
L-1.1. Notice To Offeror(s). Section L of the IFB provides general guidance for preparing bids and content of the required data/information. Bids must include all data/information requested in the IFB. Bidders shall submit one hardbound, tabbed original; two hardbound, tabbed copies; and three CDs containing: (1) Fully completed Standard Form (SF) 1442, Solicitation, Offer, and Award; (2) Fully completed solicitation Attachment 4
- Bidder Price List; and (3) Responsibility Evaluation Factors that fully address the evaluation factors noted in L-3.1. through L-3.7. of this section.
Bidders shall provide the fully completed SF 1442 and the Responsibility Evaluation Factors in searchable Adobe PDF Version XI or later and submit the fully completed solicitation Attachment 4 - Painting IDIQ Bidder Price List in Microsoft Excel format. There are no font size requirements, margin requirements, or page limitation requirements for the bidder's submission.
L-1.1.1. Questions in response to this solicitation are due no later than 4:30 PM EDT on 5 June 2023. All questions shall be submitted via email and submitted only to the points of contact noted below. It is the offeror's responsibility to confirm Government's receipt. Please note the following in the email subject line: "Questions: JBLE Painting IFB Solicitation FA480023B0001"
MSgt Natara Olbricht: natara.olbritch@us.af.mil
SSgt Noah Kemner: noah.kemner@us.af.mil
Mr. Phillip Nease: phillip.nease.1@us.af.mil
L-1.2. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of bids. In the event the Government cancels this solicitation, the Government has no obligation to reimburse a bidder for any proposal preparation costs.
L-1.3. This acquisition is a competitive procurement pursuant to Section 8(a) of the Small Business Administration (SBA) Act (15 U.S.C. 637(a)), in accordance with FAR Part 19.8, Contracting with the SBA (The 8(a) Program) and FAR Part 6.204, Section 8(a) competition. The applicable North American Industry Classification System (NAICS) code 238320 - Painting and Wall Covering Contractors and the Product Service Code (PSC) is Z1JZ, Maintenance of Miscellaneous Buildings.
L-1.4. Award will be made to the responsible bidder whose bid is responsive to the terms of the invitation for bids (IFB) and is most advantageous to the Government, considering only price and the price-related factors included in the invitation.
L-1.5. Bid pricing in response to this solicitation shall be valid for 180 calendar days.
L-1.5.1. All bid pricing shall be fully burdened: all pricing shall include G&A, overhead, and profit. Offerors shall complete Attachment 4, Bidder Price List, for the Base and each Option Year.
L-1.6. Bidders shall note overall bid amount (base year and all option years) in Block 17, Page 2 of the SF 1442. Note: Section B - Supplies or Services and Prices or Costs is shown for informational purposes only. No action is required by the bidders. The Government will complete this section upon award of the contract.
L-1.7. Bidders shall acknowledge awareness of all amendments to the solicitation by signing and dating Block 19, Page 2 of the SF 1442.
L-1.8. Bids will be evaluated without discussions. Therefore, bidders are advised that taking exception to any requirements specified in this solicitation will result in the Government rejecting the bid. Clarification of Government requirements shall be handled by submitting questions /recommendations prior to submission of bids. While bidders may propose exceptions to the solicitation requirements, the Government is not obligated to accept such bids. Any change to the requirement as a result of accepting an exception shall be reflected by amendment to the IFB before bids are due. Note: a few of the unit of issues noted on the price list may be non-standard to some within the construction industry; however, these units will not be revised and are for the express best interest of the government for project definition and construction inspections.
L-1.9. Bidders shall complete the necessary fill-ins and certifications in all provisions/clauses throughout the solicitation. Failure to complete these items may result in the bidder being found non-responsive and/or non-responsible.
L-2. SUBMISSION OF BIDS.
L-2.1. All bids shall be mailed, or hand delivered (no electronic bids will be accepted) to the following issuing office in time to be received by the date and time of the bid opening as specified in Block 13(a) of the SF 1442. If bids are to be hand delivered, bidders shall send an email to phillip.
nease.1@us.af.mil and natara.olbricht@us.af.mil to schedule delivery. Please mark all packages as follows:
DO NOT OPEN IN MAIL ROOM
633 Contracting Squadron/PKB ATTN: Natara Olbricht/Phillip Nease 14 Burrell St, Bldg 67 Langley AFB, VA 23665-2088 Solicitation No. FA4800-23-B-0001
The bid opening will take place in Building 67, Room 135 (633 Contracting Squadron Large Conference Room) on Langley Air Force Base on the date and time specified in Block 13(a) of the SF 1442.
L-3. RESPONSIBILITY EVALUATION FACTORS. To be determined responsible, the bidder must provide/demonstrate their ability to meet the following evaluation requirements noted in Section M, Evaluation Factors for Award.
L-3.1. Adequate Financial Resources. Provide a letter from the bidder's financial institution that addresses the financial health of the company to demonstrate that adequate financial resources are available to perform the contract.
L-3.2. Performance Schedule Compliance: Provide detailed plan as to how multiple simultaneous projects at two geographically separated installations will be managed and kept on schedule.
L-3.3. Satisfactory Past Performance. Provide a minimum of three (3) and a maximum of six (6) applicable painting projects (to include title of each project, complete contract number, and task order number) valued at $60K or higher each. Applicable projects are defined as those involving the application of paint or coatings to surfaces in accordance with industry standards and practices, such as (but not limited to) those established by the American Society for Testing and Materials (ASTM) or the National Association of Corrosion Engineers (NACE). One (1) of the three (3) minimum projects must include static display painting and/or restoration. All projects must have been rated at least as satisfactory performance.
L-3.4. Satisfactory Record of Integrity Business and Business Ethics. The Government will perform queries of required systems (e.g. SAM.gov, Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Performance Assessment Reporting System (CPARS), etc.
in making this responsibility determination. The contractor, although not required, may provide any information on this standard it would like to be considered.
L-3.5. Necessary Organization, Experience, Accounting & Operational Controls, and Technical Skills. Provide a minimum of five (5) years' experience working the minimum number of three (3) applicable painting projects noted in paragraph L-3.3. above. Each project must be valued at $60K or higher, involve industry standards/practices such as those established by ASTM or NACE, and one of the three must include static display painting and/or restoration. Furthermore, provide resumes for the contractor's superintendent or project manager, business development, and project cost estimation staff demonstrating their familiarity with Unified Field Criteria (UFCs), ASTM International standards, Leadership in Energy and Environmental Design (LEED(r)) standards, and Air Force Instructions (AFIs).
L-3.6. Necessary Production, Construction, and Technical Equipment. Provide information as to how the bidder has sufficient resources, equipment, etc., or the ability to obtain it (e.g. equipment yard inventory, financial capability, subcontractors, etc.) to satisfactorily perform work under this IDIQ.
L-3.7. Otherwise Qualified and Eligible to Receive Award. The Government will perform queries of required systems (e.g. SAM.gov, Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Performance Assessment Reporting System (CPARS), etc. in making this responsibility determination and evaluate other criterion as required. The contractor, although not required, may provide any information on this standard it would like to be considered.
Section M - Evaluation Factors for Award
Miscellaneous text in this section has been modified to:
Section M - Evaluation Factors for Award
M-1. BASIS FOR CONTRACT AWARD.
M-1.1. This Invitation for Bids (IFB) will follow the procedures for sealed bidding in Federal Acquisition Regulation (FAR) Part 14, as modified and supplemented by the requirements of FAR subpart 36.213, Special Procedures for Sealed Bidding in Construction Contracting. Price will be evaluated using techniques established in FAR 15.404-1 as a guide to ensure the Government receives a fair, reasonable, and balance price. Award will be made to the responsible bidder whose bid is responsive to the terms of the IFB and is most advantageous to the Government, considering only price and the price-related factors included in the invitation.
M-1.2. The Government contemplates award of one contract resulting from this solicitation. However, the Government reserves the right not to award a contract, depending on the acceptability of bid(s) submitted and the availability of funds.
M-1.3. At bid opening, the Government will announce the total overall bid price of each bidder. The total overall bid price shall be the total price bid for the base year and all four option years. The total evaluated price for award purposes will be determined by adding the total price of the base year, all four option years, and 50 percent of the price for the last option year to represent the price for the optional extension of services in accordance with FAR Clause 52.217-8, Option to Extend Services. For prices that appear unrealistically low or unbalanced, the government may review the prices using price analysis techniques listed in FAR 15.404-1 as a guideline. Failure to provide realistic prices may result in a bid being rejected on the basis that unrealistically low prices are an indication that the bidder does not understand the requirements. Failure to provide balanced pricing may result in a bid being rejected due to the increased performance risk and the government having to pay unreasonably high prices.
M-1.4. The Government intends to initially rank the bidders' proposals by total overall bid price and if the lowest bidder is determined to be responsive and responsible, that bidder will be determined the winning bid and awarded the contract. If the low bidder is not found both responsive and responsible, the next lowest bidder will be evaluated and so forth until a winning bidder is determined. Should no winning bidder be determined, the requirement may be re-solicited or cancelled at the Government's discretion.
M-1.5. Bids will be evaluated without discussions.
M-1.6. The responsible bidder whose bid is responsive to the terms of the IFB and is most advantageous to the Government, considering only price and price-related factors, will be awarded the contract.
M-2. RESPONSIBILITY EVALUATION FACTORS. To be determined responsible, the bidder must demonstrate:
M-2.1. Adequate Financial Resources. This factor is met when the bidder provides a letter from its financial institution that addresses the financial health of the company to demonstrate that adequate financial resources are available to perform the contract.
M-2.2. Performance Schedule Compliance: This factor is met when the bidder provides sufficient information to show that it has a viable plan to properly manage multiple simultaneous projects at two geographically separated installations and keep them on schedule.
M-2.3. Satisfactory Past Performance. This factor is met when the bidder provides at least three (3) applicable painting projects (to include title of each project, complete contract number, and task order number) valued at $60K or higher. Applicable projects are defined as those involving the application of paint or coatings to surfaces in accordance with industry standards and practices, such as (but not limited to) those established by the American Society for Testing and Materials (ASTM) or the National Association of Corrosion Engineers (NACE). One (1) of the three (3) projects must include static display painting and/or restoration. All projects must have been rated at least as satisfactory performance.
M-2.4. Satisfactory Record of Integrity Business and Business Ethics. The Government will perform queries of required systems (e.g. SAM.gov, Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Performance Assessment Reporting System (CPARS), etc.) in making this responsibility determination. The contractor, although not required, may provide any information on this standard it would like to be considered. Any information provided by the bidder will be taken into consideration by the Government when making its responsibility determination.
M-2.5. Necessary Organization, Experience, Accounting & Operational Controls, and Technical Skills. This requirement is met when the bidder's proposal contains all requirements noted here within. Documentation that it has a minimum of five (5) years' experience working with the minimum number of three (3) applicable painting projects noted in paragraph M-2.3. above. Experience must have been with projects valued at $60K or higher, involved industry standards/practices such as those established by ASTM or NACE, and experience with one of the three projects having included static display painting and/or restoration. All projects must have been rated at least as satisfactory performance. Furthermore, the bidder's proposal contains resumes that document the experience of their construction superintendent, business development, and project cost estimation staff's use and compliance with Unified Field Criteria (UFCs), American Society for Testing Materials (ASTM) International standards, Leadership in Energy and Environmental Design (LEED(r)) standards, and Air Force Instructions (AFIs). Documentation showing how their staff members will complete any additional required standards training within 180-days of contract award is also acceptable.
M-2.6. Necessary Production, Construction, and Technical Equipment. This factor is met when the bidder provides information as to how it has sufficient resources, equipment, etc., or the ability to obtain it (e.g. financial capability, subcontractors, etc.) to satisfactorily perform work under this
IDIQ.
M-2.7. Otherwise Qualified and Eligible to Receive Award. The Government will perform queries of required systems (e.g. SAM.gov, Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Performance Assessment Reporting System (CPARS), etc. in making this responsibility determination and evaluate other criterion as required. The bidder, although not required, may provide any information on this standard it would like to be considered. Any information provided by the bidder will be taken into consideration by the Government when making its responsibility determination.
| IDCode: |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0005 |
| EffDate: 17 Jul 2023 |
| ReqNo: |
| ProjNo: JBLE Painting IDIQ |
| IssCode: FA4800 |
| AdmCode: |
| IssuedBy: FA4800 633 CONS LGCP |
14 BURRELL ST BLDG 67, CP 757 225-1669
LANGLEY AFB, VA 23665
UNITED STATES
Noah Kemner, Email: noah.kemner@us.af.mil Telephone: (757) 764-3060
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA480023B0001 |
| SolDate: 20 May 2023 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Phillip J Nease |
| ContDate: |
| CODate: 17 Jul 2023 |
File details come from the government source that posted it. Updated .