FA4800-17-B-0001-P00001_Amendment_to_Solicitation.pdf
PDF 157 KB Posted
- Attached to
- Repair East Apron Federal contract opportunity
- Solicitation number
- FA4800-17-B-0001
About this file
SF 30 Amendment
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MUHJ 03-4247
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add attachments and extend the bid due date:
a. Attachment 18 is added and includes a phasing schedule timeline.
b. Attachment 19 is added and includes Q&A.
c. Attachment 20 is added and includes the Haul Route.
d. Attachment 21 is added and includes a draw ing of the Phasing Schedule.
e. Attachment 22 is added and includes the Final bid Schedule.
f. Attachment 23 is added and includesPaving Markings.
g.Attachment 24 is added and includes a revised SOW.
h. The bid due date is hereby changed from 27 April 2017 @ 2:00 PM EST to 11 May 2017 @2:00 PM EST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4800-17-B-0001
X 9B. DATED (SEE ITEM 11)
27-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Apr-2017
CODE
633 CONS/LGCB
14 BURRELL STREET,
BLDG 67
LANGLEY AFB VA 23665-1924
FA4800 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4800-17-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Apr-2017 02:00 PM to 11-May-2017 02:00 PM.
The required performance has changed from The contractor shall provide all plant, labor, equipment, tools, materials, transportation, management, supervision, and other services necessary to repair by replacement, the transient aircraft parking area and East Apron transient parking area in accordance with the drawings and specifications of this contract.NAICS: 237310 Highway, Street, and Bridge ConstructionSize Standard:
$36,500,000.00Notice to Offerors: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. to The contractor shall provide all plant, labor, equipment, tools, materials, transportation, management, supervision, and other services necessary to repair by replacement, the transient aircraft parking area and East Apron transient parking area in accordance with the drawings and specifications of this contract.NAICS: 237310 Highway, Street, and Bridge ConstructionSize Standard: $36,500,000.00Notice to Offerors: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.Public bid opening will be held at 14 Burrell St. (Bldg. 67) Langley AFB, VA 23665, May 11 2017 at 1400
EST.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ADDENDUM
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 16-SEP-2016 Attachment 2 Airfield Slabs Total 16-SEP-2016 Attachment 3 Airfield Slabs 1 16-SEP-2016 Attachment 4 Airfield Slabs 2 18-MAR-2016 Attachment 5 Airfield Slabs 3 18-MAR-2016 Attachment 6 Airfield Slabs 4 18-MAR-2016 Attachment 7 Airfield Slabs 5 18-MAR-2016 Attachment 8 Work Areas 16-SEP-2016 Attachment 9 Basis of Design Attachment 10 Buy American Provisions 16-SEP-2016 Attachment 11 Drawings 16-SEP-2016 Attachment 12 Environmental Report 16-SEP-2016 Attachment 13 Geotech Results 16-SEP-2016 Attachment 14 Submittal Form 16-SEP-2016 Attachment 15 Survey 16-SEP-2016 Attachment 16 Warranty Schedule 16-SEP-2016 Attachment 17 AF Form 3052 27-Mar-17 Attachment 18 Phasing Schedule Time 3- Apr- 17 Attachement 19 Q&A 3- Apr -17 Attachment 20 Haul Route 21- Apr -17 Attachment 21 Phasing Schedule .Pdf 21- Apr -17
FA4800-17-B-0001
Attachment 22 Final bid Schedule 21- Apr -17 Attachment 23 Paving Markings 21- Apr -17 Attachment 24 Revised SOW 21- Apr -17
(End of Summary of Changes)
File details come from the government source that posted it. Updated .