Attach_16_MUHJ_03-4247_Final_Warranty_Schedule.pdf

PDF 288 KB Posted

Attached to
Repair East Apron Federal contract opportunity
Solicitation number
FA4800-17-B-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 16 - Warranty Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair East Apron, newest first.
File Type Posted
Amendment_27_Q&A_16_May_2017.docx DOCX document
Amendment_22__Bid_Schedule_Revision_2_-_10May17.docx DOCX document
FA4800-17-B-0001-0003.pdf PDF
FA4800-17-B-0001-0002.pdf PDF
Attachment_25_Q&A.docx DOCX document
Attachment_26_Storm_Pipe_and_Manhole_Drawing.pdf PDF
Attachment_18_Phasing_schedule_timeline_Revision_1.docx DOCX document
Attachment_22_Bid_Schedule_Revision_1.docx DOCX document
Attachment_22_MUHJ_03-4247_Final_Bid_Schedule_Corrected..docx DOCX document
FA4800-17-B-0001_East_Apron_Site_Visit_Meeting_Roster.pdf PDF
FA4800-17-B-0001-P0001_Amendment_Signed.pdf PDF
Attachment_22_MUHJ_03-4247_Final_Bid_Schedule.docx DOCX document
attachment_23_Pavement_Markings_20Arp17.pptx PPTX presentation
Attachment_18_Phasing_Schedule.docx DOCX document
FA4800-17-B-0001-P00001_Amendment_to_Solicitation.pdf PDF
Attachment_20_Langley_East_Apron_MUHJ_03-4247_90_Haul_Route_and_Plant_Site.pdf PDF
Attachment_19_Langley_AFB_QA_10_Apr_2017.docx DOCX document
Attachment_21_Langley_East_Apron_MUHJ_03-4247_Airfield_Slabs_Phasing.pdf PDF
Attachment_24_Revised_SOW_MUHJ_03-4247.docx DOCX document
Attach_8__Work_Areas.pdf PDF
Attach_6_Airfield_Slabs4.pdf PDF
Attach_4_Airfield_Slabs2.pdf PDF
Attach_15_MUHJ_03-4247_Final_Survey.pdf PDF
Attach_5_Airfield_Slabs3.pdf PDF
Attach_11_MUHJ_03-4247_Final_Drawings_-_13Mar17.pdf PDF
Attach_13_MUHJ_03-4247_Final_Geotech_Report.pdf PDF
Attach_10_MUHJ_03-4247_Final_Buy_American.pdf PDF
Attach_7_Airfield_Slabs5.pdf PDF
Attach_12_MUHJ_03-4247_Final_Envir_Report.pdf PDF
FA4800-17-B-0001.pdf PDF
Attach_3_Airfield_Slabs1.pdf PDF
Attach_1_MUHJ_03-4247_Final_Specs.pdf PDF
Attach_2_Airfield_Slabs_Total.pdf PDF
Attach_9_MUHJ_03-4247_Final_Basis_of_Design.pdf PDF
Attach_14_MUHJ_03-4247_Final_Submittal_Form_AF_Form_66.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MUHJ 03-4247—Repair East Apron, Phase 9, F.6020

Joint Base Langley-Eustis, Langley AFB, Hampton, VA

Warranty Schedule

100% Submission September 16, 2016

MUHJ 03-4247—Repair East Apron, Phase 9, F.6020

Joint Base Langley-Eustis, Langley AFB, Hampton, VA

WARRANTY SCHEDULE

REPAIR EAST APRON, PHASE 9

Project MUHJ 03-4247

Due to the nature of the project there are no components with separate and individual warranties beyond the normal one-year construction warranty per Specification 01 11 00.00 10 Paragraph 1.25.

File details come from the government source that posted it. Updated .