Attach_14_MUHJ_03-4247_Final_Submittal_Form_AF_Form_66.pdf

PDF 177 KB Posted

Attached to
Repair East Apron Federal contract opportunity
Solicitation number
FA4800-17-B-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 14 - Submittal Forms

View the file

Other files for this federal contract opportunity

Other files attached to Repair East Apron, newest first.
File Type Posted
Amendment_27_Q&A_16_May_2017.docx DOCX document
Amendment_22__Bid_Schedule_Revision_2_-_10May17.docx DOCX document
FA4800-17-B-0001-0003.pdf PDF
FA4800-17-B-0001-0002.pdf PDF
Attachment_25_Q&A.docx DOCX document
Attachment_26_Storm_Pipe_and_Manhole_Drawing.pdf PDF
Attachment_18_Phasing_schedule_timeline_Revision_1.docx DOCX document
Attachment_22_Bid_Schedule_Revision_1.docx DOCX document
Attachment_22_MUHJ_03-4247_Final_Bid_Schedule_Corrected..docx DOCX document
FA4800-17-B-0001_East_Apron_Site_Visit_Meeting_Roster.pdf PDF
FA4800-17-B-0001-P0001_Amendment_Signed.pdf PDF
Attachment_18_Phasing_Schedule.docx DOCX document
FA4800-17-B-0001-P00001_Amendment_to_Solicitation.pdf PDF
Attachment_20_Langley_East_Apron_MUHJ_03-4247_90_Haul_Route_and_Plant_Site.pdf PDF
Attachment_22_MUHJ_03-4247_Final_Bid_Schedule.docx DOCX document
attachment_23_Pavement_Markings_20Arp17.pptx PPTX presentation
Attachment_19_Langley_AFB_QA_10_Apr_2017.docx DOCX document
Attachment_21_Langley_East_Apron_MUHJ_03-4247_Airfield_Slabs_Phasing.pdf PDF
Attachment_24_Revised_SOW_MUHJ_03-4247.docx DOCX document
Attach_6_Airfield_Slabs4.pdf PDF
Attach_4_Airfield_Slabs2.pdf PDF
Attach_15_MUHJ_03-4247_Final_Survey.pdf PDF
Attach_5_Airfield_Slabs3.pdf PDF
Attach_11_MUHJ_03-4247_Final_Drawings_-_13Mar17.pdf PDF
Attach_8__Work_Areas.pdf PDF
Attach_13_MUHJ_03-4247_Final_Geotech_Report.pdf PDF
Attach_10_MUHJ_03-4247_Final_Buy_American.pdf PDF
Attach_7_Airfield_Slabs5.pdf PDF
Attach_12_MUHJ_03-4247_Final_Envir_Report.pdf PDF
FA4800-17-B-0001.pdf PDF
Attach_3_Airfield_Slabs1.pdf PDF
Attach_1_MUHJ_03-4247_Final_Specs.pdf PDF
Attach_16_MUHJ_03-4247_Final_Warranty_Schedule.pdf PDF
Attach_2_Airfield_Slabs_Total.pdf PDF
Attach_9_MUHJ_03-4247_Final_Basis_of_Design.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-03 Product Data

Material Safety Data Sheet (MSDS)

Spec: 01 11 00.00 10, Para: 1.12.3

SD-03 All Employee Names and Social

Security Numbers

Spec: 01 11 00.00 10, Para: 1.13.1

SD-03 Work Clearance Requests Spec:

01 11 00.00 10, Para 1.16.1

SD-03 Quality Control (QC) Report, Spec: 01 11 00.00 10, Para: 1.24.2

SD-11 Closeout Submittals Survey

Report, Spec: 01 11 00.00 10, Para:

1.24.3

SD-11Metadata; Spec: 01 11 00.00 10, Para: 1.24.2

SD-11 Deliverables and Final As-Builts, Spec 01 11 00.00 10, Para: 1.24

SD-11 Computer-Aided Drafting and

Design (CADD) digital final as-built drawings, Spec: 01 11 00.00 10, Para:

SD-11 As-Built (Redline) Drawings, Spec:

01 11 00.00 10, Para: 1.23.1

SD-11 Warranty of Construction, Spec:

01 11 00.00 10, Para: 1.25

SD-01 Preconstruction Susmittals View

Location Map, Spec: 01 30 00, Para: 1.3

G

SD-01 Progress and Completion

Pictures, Spec: 01 30 00, Para: 1.4 G

AF FORM 66 (Computer Generated) PAGE 1 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-01 Preconstruction Submittals

Construction Schedule: Spec: 01 32

16.00 20, Para: 1.2 G

SD-07 Certificates Monthly Updates, Spec: 01 32 16.00 20, Para: 1.4

SD-01 Preconstruction Submittals

Submittal Register, Spec: 01 33 00, Para:

1.9 G

SD-01 Preconstruction Submittals

Accident Prevention Plan (APP), Spec:

01 35 26, Para: 1.7 G

SD-06 Test Reports, Monthly Exposure

Reports, Spec: 01 35 26, Para: 1.4

SD-06 Test Reports, Notifications and

Reports, Spec: 01 35 26, Para: 1.11

SD-06 Test Reports, Accident Reports, Spec: 01 35 26, Para: 1.11.1 G

SD-01 Test Reports, LHE Inspection

Reports, Spec: 01 35 26, Para 1.11.2

SD-07 Certificates, Crane

Operators/Riggers, Spec: 01 35 26, Para:

1.6.1.5

SD-07 Certificates, Standard Lift Plan, Spec: 01 35 26, Para: 1.7.2.2 G

SD-07 Certificates, Critical Lift Plan, Spec: 01 35 26, Para: 1.7.2.3 G

SD-07 Certificates, Confined Space Entry

Permit, Spec: 01 35 26, Para: 1.8.1

AF FORM 66 (Computer Generated) PAGE 2 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-07 Certificates, Hot Work Permit, Spec: 01 35 26, Para: 1.8.1

SD-07 Certificates, Certificate of

Compliance, Spec: 01 35 26, Para:

1.11.3

SD-07 Certificates, Machinery &

Mechanized Equipment Cerfitication

Form, Spec: 01 35 26, Para: 3.4.3

SD-07 Certificates, Equipment

Certification Form, Spec: 01 35 26, Para:

SD-01 Preconstruction Submittals, Contractor Quality Control (CQC) Plan, Spec: 01 45 00.00 10, Para: 3.2 G

SD-06 Test Reports, Verification

Statement, Spec: 01 45 00.00 10, Para:

3.9

SD-01 Preconstruction Submittals, Construction Site Plan, Spec: 01 50 00, Para: 1.3 G

SD-01 Preconstruction Submittals, Traffic

Control Plan, Spec: 01 50 00, Para: 3.4.1

G

SD-03 Product Date, Backflow

Preventers, Spec: 01 50 00, Para: 1.4 G

SD-06 Test Reports, Backflow Preventer

Tests, Spec: 01 50 00, Para: 2.2.5

SD-07 Certificates, Backflow Tester, Spec 01 50 00, Para: 1.4.1

SD-07 Certificates, Backflow Preventers, Spec: 01 50 00, Para: 1.4

AF FORM 66 (Computer Generated) PAGE 3 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-01 Preconstruction Submittals, Waste

Management Plan, Spec: 01 74 19, Para:

1.5 G

SD-11 Closeout Submittals, Records, Spec: 01 74 19, Para: 1.6

SD-03 Product Data, Warranty

Management Plan, Spec: 01 78 00, Para:

1.5.1

SD-11 Closeout Submittals, As-Built

Drawings, Spec: 01 78 00, Para: 3.1 G

SD-11 Closeout Submittals, Record

Drawings, Spec: 01 78 00, Para: 3.3 G

SD-11 Closeout Submittals, Final

Approved Shop Drawings, Spec: 01 78

00, Para: 3.4

SD-11 Closeout Submittals, Construction

Contract Specifications, Spec: 01 78 00, Para: 3.5

SD-01 Preconstruction Submittals, Demolition Plan, Spec: 02 41 00, Para:

1.2.1 G

SD-01 Preconstruction Submittals, Existing Conditions, Spec: 02 41 00, Para: 1.11

SD-07 Certificates, Notification, Spec: 02

41 00, Para: 1.7 G

SD-03 Product Data, Preformed

Expansion Joint Filler, Spec: 03 15 00.00

10, Para: 2.2

SD-03 Product Data, Sealant, Spec: 03

15 00.00 10, Para: 2.3

AF FORM 66 (Computer Generated) PAGE 4 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-04 Samples, Lubricant for Preformed

Compression Seals, Spec: 03 15 00.00

10, Para: 2.3.2

SD-04 Samples, Field-Molded Type, Spec: 03 15 00.00 10, Para: 2.3.3

SD-07 Certificates, Preformed Expansion

Joint Filler, Spec: 03 15 00.00 10, Para:

2.2

SD-07 Certificates, Sealant, Spec: 03 15

00.00 10, Para: 2.3

SD-02 Shop Drawings, Reinforcement, Spec: 03 20 00.00 10, Para: 3.1 G

SD-03 Product Data, Reinforcing Steel, Spec: 03 20 00.00 10, Para: 2.3 G

SD-04 Samples, Epoxy-Coated Bars, Spec: 03 20 00.00 10, Para: 2.3.1

SD-06 Test Reports, Tests, Inspections, and Verifications, Spec: 03 20 00.00.10, Para: 2.7 G

SD-07 Certificates, Reinforcing Steel, Spec: 03 20 00.00 10, Para: 2.3

SD-03 Shop Drawings, Installation

Drawings, Spec: 03 30 53, Para: 1.4 G

SD-03 Product Data, Air-Entraining

Admixture, Spec: 03 30 53, Para: 2.2.3.1

SD-03 Product Data, Water-Reducing or

Retarding Admixture, Spec: 03 30 53, Para: 2.2.3.2

AF FORM 66 (Computer Generated) PAGE 5 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-03 Product Data, Curing Materials, Spec: 03 30 53, Para: 2.2.7

SD-03 Product Data, Batching and Mixing

Equipment, Spec: 03 30 53, Para: 3.1.3.3

SD-03 Product Data, Conveying and

Placing Concrete, Spec: 03 30 53, Para:

3.2

SD-03 Product Data, Formwork, Spec: 03

30 53, Para: 2.2.5

SD-03 Product Data, Mix Design Data, Spec: 03 30 53, Para: 2.3 G

SD-03 Product Data, Ready-Mix

Concrete, Spec: 03 30 53, Para: 2.3

SD-03 Product Data, Curing Compound, Spec: 03 30 53, Para: 2.4.1

SD-06 Test Reports, Aggregates, Spec:

03 30 53, Para: 2.2.2

SD-06 Test Reports, Concrete Mixture

Proportions, Spec: 03 30 53, Para: 2.1.3

G

SD-06 Test Reports, Compressive

Strength Testing, Spec: 03 30 53, Para:

3.8.3 G

SD-06 Test Reports, Slump, Spec: 03 30

53, Para: 3.8.3 G

SD-06 Test Reports, Air Control, Spec:

03 30 53, Para: 3.8.3

AF FORM 66 (Computer Generated) PAGE 6 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-06 Test Reports, Water, Spec: 03 30

53, Para: 2.2.4

SD-07 Certificates, Cementitous

Materials, Spec: 03 30 53, Para: 2.2.1

SD-07 Certificates, Pozzolan, Spec: 03

30 53, Para: 2.2.1.1

SD-07 Certificates, Aggregates, Spec: 03

30 53, Para: 2.2.2

SD-07 Certificates, Delivery Tickets, Spec: 03 30 53, Para: 2.3

SD-08 Manufacturer's Instructions, Curing Compound, Spec: 03 30 53, Para:

2.4.1

SD-01 Preconstruction Submittals, Qualitiy Control Procedures, Spec: 03 40

00.00 10 , Para: 1.3.2.2

SD-02 Shop Drawings, Standard Precast

Units, Spec: 03 40 00.00 10, Para: 2.1.1

G

SD-02 Shop Drawings, Custom-Made

Precast Units, Spec: 03 40 00.00 10, Para: 2.1.2 G

SD-03 Product Data, Standard Precast

Units, Spec: 03 40 00.00 10, Para: 2.1.1

SD-03 Product Data, Proprietary Precast

Units, Spec: 03 40 00.00 10, Para: 2.1.3

SD-03 Product Data, Embedded Items, Spec: 03 40 00.00 10, Para: 3.1.3

AF FORM 66 (Computer Generated) PAGE 7 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-03 Product Data, Accessories, Spec:

03 40 00.00 10, Para: 2.2.9

SD-05 Design Data, Design Calculations, Spec: 03 40 00.00 10, Para: 2.1.2

SD-05 Design Data, Concrete Mix

Proportions, Spec: 03 40 00.00 10, Para:

2.1.5.1

SD-06 Test Reports, Test Reports, Spec:

03 40 00.00 10, Para: 1.3.2.4

SD-07 Certificates, Quality Control

Procedures, Spec: 03 40 00.00 10, Para:

1.3.2.2

SD-06 Test Reports, Testing, Spec: 31

00 00, Para: 3.5

SD-06 Test Reports, Borrow Site Testing, Spec: 31 00 00, Para: 2.1

SD-07 Certificates, Testing, Spec: 31 00

00, Para: 3.5

SD-03 Product Data, Thread, Spec: 31

05 19, Para: 2.1.2

SD-03 Product Data, Manufacturing

Quality Control Sampling and Testing, Spec: 31 05 19, Para: 2.2

SD-04 Samples, Quality Assurance

Samples and Tests, Spec: 31 05 19, Para: 3.1

SD-07 Certificate, Geotextile, Spec: 31

05 19, Para: 2.1.1

AF FORM 66 (Computer Generated) PAGE 8 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-06 Test Reports, Fill and Backfill, Spec: 31 23 00.00 20, Para: 3.11.2.1

SD-06 Test Reports, Select Material, Spec: 31 23 00.00 20, Para: 3.11.2.2

SD-06 Test Reports, Pourous fill, Spec:

31 23 00.00 20, Para: 3.11.2.3

SD-06 Test Reports, Density tests, Spec:

31 23 00.00 20, Para: 3.11.2.4

SD-06 Test Reports, Moisture Content

Tests, Spec: 31 23 00.00 20, Para:

3.11.2.5

SD-04 Samples, Paint removal, Spec: 32

01 11.51, Para: 1.7.1

SD-07 Certificates, Schedule of work, Spec: 32 01 11.51, Para: 1.5.1

SD-07 Certificates, High-pressure rubber and paint removal equipment, Spec: 32

01 11.51, Para: 1.6.1

SD-03 Product Data, Equipment, Spec:

32 01 19, Para: 3.1

SD-04 Samples, Materials, Spec: 31 01

19, Para: 1.3.1 G

SD-06 Test reports, Certified copies of the test reports, Spec: 32 01 19, Para:

1.3.1 G

SD-03 Product Data, Equipment, Spec:

32 11 16, Para: 1.3

AF FORM 66 (Computer Generated) PAGE 9 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-06 Test Reports, Sampling and testing, Spec: 32 11 16, Para: 1.5

SD-06 Test Reports, Field Density Tests, Spec: 32 11 16, Para: 1.5.2.4

SD-04 Samples, Subbase aggregate, Spec: 32 11 33, Para: 2.2.1

SD-05 Design Data, Mix design, Spec: 32

11 33, Para: 2.5

SD-05 Design Data, Job-mix formula, Spec: 32 11 33, Para: 2.5

SD-06 Test Reports, Placticity index, Spec: 32 11 33, Para: 3.7.2.1

SD-06 Test Reports, Sieve analysis, Spec: 32 11 33, Para: 2.2.1

SD-06 Test Reports, Compressive strength, Spec: 32 11 33, Para: 2.4.1

SD-06 Test Reports, Weight loss, Spec:

32 11 33, Para: 2.4.3

SD-06 Test Reports, moisture density, Spec: 32 11 33, Para: 2.5

SD-06 Test Reports, Liquid Limit, Spec:

32 11 33, Para: 3.7.2.1

SD-06 Test Reports, Sieve analysis of combined material, Spec: 32 11 33, Para:

3.7.2.1

AF FORM 66 (Computer Generated) PAGE 10 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-06 Test Reports, Optimum moisute content and maximum density, Spec: 32

11 33, Para: 3.7.2.6

SD-07 Certificates, cement, Spec: 32 11

33, Para: 2.1

SD-07 Certificates, Location of aggregate, Spec: 32 11 33, Para: 1.5.1

SD-07 Certificates, Method, Spec: 32 11

33, Para: 1.5.1

SD-07 Certificates, Construction equipment list, Spec: 32 11 33, Para:

1.5.1

SD-03 Product Data, Diamond Grinding

Plan, Spec: 32 13 11, Para: 2.1.6 G

SD-03 Product Data, Dowels, Spec: 32

11 33, Para: 2.9.1 G

SD-03 Product Data, Dowel Bar

Assemblies, Spec: 32 13 11, Para: 2.9.2

G

SD-03 Product Data, Equipment, Spec:

32 13 11, Para: 2.11

SD-03 Product Data, Proposed techniques, Spec: 32 13 11, Para: 3.1.2

G

SD-05 Design Data, Preliminary proposed, Spec: 32 13 11, Para: 2.13.2 G

DO

SD-05 Design Data, Proportioning

Studies, Spec: 32 13 11, Para: 2.13.2 G

DO

AF FORM 66 (Computer Generated) PAGE 11 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-06 Test Reports, Batch plant manufacturer's inspection report, Spec:

32 13 11, Para: 1.4.1 G

SD-06 Test Reports, Slipform paver manufacturer's inspection report, Spec:

32 13 11, Para: 1.4.1.G

SD-06 Test Reports, Sampling and testing, Spec: 32 13 11, Para: 2.1.4.1 G

SD-06 Test Reports, Diamond Grinding of PCC surfaces, Spec: 32 13 11, Para:

2.1.6 G

SD-06 Testing Reports, Mixer performance (uniformity) testing, Spec:

32 13 11, Para: 2.11.2.3 G

SD-06 Test Reports, Repair recommendations plan, Spec: 32 13 11, Para: 3.9.1 G

SD-07 Certificates, Contractor quality control staff, Spec: 32 13 11, Para: 1.4.1

G

SD-07 Certificates, Laboratory accreditation and validation, Spec: 32 13

11, Para: 1.4.3

SD-07 Certificates, Commercial

Laboratory, Spec: 32 13 11, Para: 1.4.3.3

G

SD-07 Certificates, NRMCA Cerficate of

Conformance, Spec: 32 13 11, Para: 2.11

SD-03 Product Data, Equipment, Spec:

32 13 73, Para: 2.1

SD-03 Product Data, Manufacturer's instructions, Spec: 32 13 73, Para: 3.1.1

AF FORM 66 (Computer Generated) PAGE 12 of 13

SCHEDULE OF MATERIAL SUBMITTALS Repair East Apron LAFB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

SD-04 Samples, Compression Seals, Spec: 32 13 73, Para: 2.2G

SD-06 Test Reports, Test Requirements, Spec: 32 13 73, Para: 2.1.3

SD-03 Product Data, Equipment, Spec:

32 17 24.00 10, Spec: 1.2 G

SD-03 Product Data, Qualifications, Spec: 32 17 24.00 10, Para: 1.4.1

SD-06 Test Reports, Sampling and testing, Spec: 32 17 24.00 10, Para: 2.3

SD-03 Product Data, Placing Pipe, Spec:

33 40 00, Para: 3.3

SD-04 Samples, Pipe for Culverts and

Storm drains, Spec: 33 40 00, Para: 2.1

SD-07 Certificates, Pipeline testing, Spec: 33 40 00, Para: 3.8

SD-07 Certificates, Determination of density, Spec: 33 40 00, Para: 3.7.5

SD-07 Certificates, Frame and cover for gratings, Spec: 33 40 00, Para: 2.3.6

AF FORM 66 (Computer Generated) PAGE 13 of 13

File details come from the government source that posted it. Updated .