Attach_4 Q and A.docx
DOCX document 16 KB Posted
- Attached to
- CherryLOCK G689 Rivet Kit
- Solicitation number
- FA469026Q0044
About this file
This is a Questions and Answers document accompanying a federal contract solicitation for CherryLOCK G689 Rivet Kit components. The document clarifies three key points for potential vendors responding to solicitation FA469026Q0044. First, when delivery timeline discrepancies exist between SAM.gov and the SF1449 form, the 180-day delivery window after contract award takes precedence over the September 29, 2026 date previously listed. Second, for CLIN 0002 (Pulling Heads and Adapters Kit), vendors may submit either a single lump-sum price for the complete kit or provide individual unit pricing as an informational breakdown within their technical quote. Third, to demonstrate technical acceptability, vendors need only provide exact Cherry Aerospace model numbers that confirm brand-name compliance; a separate technical description document is not required if model number matching is clearly demonstrated in the quote.
The quote submission deadline remains 18 September 2026 at 09:00 AM MDT, and all other solicitation terms and conditions remain unchanged. This Q&A document is directly related to the government's procurement requirements for two G689 pneumatic-hydraulic riveter guns, two 680B46 straight adapters, and two units each of Cherry pulling heads (models H9055-3, H9055-4, H9055-5, and H9055-6) for the 28 Maintenance Squadron at Ellsworth Air Force Base, South Dakota. The contract will be awarded on a firm-fixed-price basis to the responsible offeror whose quote represents the best value based on technical acceptability and price evaluation factors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity CherryLOCK G689 Rivet Kit 14 September 2026
Notice ID
FA469026Q0044
Related Notice
FA469026RIVET01
Questions & Answers
1Q: There is a conflict between the 180-day delivery timeline on SAM.gov and the "On Or Before 29 Sep 2026" date in the SF1449. Which takes precedence?
1A: The 180 days after contract award (ARO) timeline takes precedence.
2Q: For CLIN 0002 (Pulling Heads and Adapters Kit), should we provide a lump-sum price or break down the individual unit prices? 2A: A single lump-sum price for the kit (CLIN 0002) is acceptable. However, vendors are encouraged to provide an informational breakdown of individual item prices within their technical quote if available.
3Q: To satisfy Technical Acceptability, is providing Cherry Aerospace model numbers sufficient, or is a separate technical description document required?
3A: Providing the exact Cherry Aerospace model numbers confirming brand-name compliance is sufficient. A separate technical description document is not required if exact brand-name matching is clearly demonstrated in the quote.
Proposal Submission Date: All other terms, conditions, and the quote submission deadline of 18 SEPT 26 at 09:00 AM MDT remain unchanged.
File details come from the government source that posted it. Updated .