Attach 3 - RFIs.pdf

PDF 65 KB Posted

Attached to
Carpet and Flooring Replacement - Ellsworth AFB (Re-Solicitation) Federal contract opportunity
Solicitation number
FA469024Q0074
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a Request for Information (RFI) related to Solicitation FA469024Q0074 for Carpet and Flooring Replacement at Ellsworth Air Force Base.

The RFI addresses changes to the Statement of Work from the previous solicitation, including the removal of some paragraphs and the addition of furniture relocation requirements. It provides details on the amount of furniture to be moved and confirms there is no requirement for asbestos testing. The work is expected to be phased, with areas being unoccupied during construction. The RFI also notes there are no specific types or brands required for the replacement carpet and vinyl tile, and no site visit is scheduled. There are no additional special requirements or restrictions for this procurement. The solicitation is a 100% Small Business set-aside under NAICS code 238330, with a response deadline of September 23, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Carpet and Flooring Replacement - Ellsworth AFB (Re-Solicitation), newest first.
File Type Posted
Solicitation Amendment FA469024Q00740002.pdf PDF
Attach 4 - Furniture Photos.pdf PDF
Solicitation Amendment FA469024Q00740001.pdf PDF
Attach 1 - Statement of Work (SOW).pdf PDF
Solicitation - FA469024Q0074.pdf PDF
Attach 2 - Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA469024Q0074 RFIs

1. What are the changes from the Statement of Work attached to solicitation no.

FA469024Q0066?

a. The changes included removing several paragraphs that were deemed not applicable and adding the relocation of furniture to para 1.3.

2. How much furniture needs moved? Can you share photos of the furniture needing to be relocated?

a. Please see “Attach 4 – Furniture Photos”.

3. Is there a requirement for asbestos testing before removing the adhesive or has testing been completed?

a. There is no requirement for asbestos testing. The building has already been 100% abated.

4. Will the building be occupied during construction?

a. Areas being replaced will not be occupied. People will be moving to other parts of the building while work is completed.

5. Is the work expected to be phased?

a. The work does not have to be phased, but furniture will likely need to be moved to other areas where carpet replacement is being done so there will likely be an organized timeline of replacing each area.

6. There’s no mention of specific types or brands for the replacement carpet or vinyl tile. Can you provide specifications for the materials they expect us to use?

a. There is no specific type or brand that must be used. You must submit a data sheet of the proposed materials that meet the specifications in “Section 5” of the Statement of Work.

7. Is there a scheduled or preferred date for a site visit to finalize the job scope?

a. There will be no site visit for this requirement.

8. Are there any additional requirements or restrictions that we should be aware of (e.g., working hours, security clearances, access limitations, etc.)?

a. There are no special requirements.