2016 Base Year
| BASE YEAR: 2016-2021 ROOF IDIQ CONTRACT | ||||||
| 4-Apr-16 | ||||||
| CLIN | DESCRIPTION | UNIT OF ISSUE | UNIT COST | ESTIMATED QUANTITY | EXTENDED COST | |
| ASPHALT SHINGLES | ||||||
| 0001 | AA | Remove and replace individual shingles; match existing | SF | 100 | ||
| 0001 | AB | Remove shingles, edge metal and underlayment for reroof | SF | 3,000 | ||
| 0001 | AC | Install edge metal for reshingling | LF | 300 | ||
| 0001 | AD | Install laminated architectural shingles | SF | 3,000 | ||
| WOOD | ||||||
| 0001 | AE | Remove and replace deteriorated wood decking | BF | 160 | ||
| 0001 | AF | Install 1/2" CDX plywood sheathing | SF | 1,000 | ||
| 0001 | AG | Install 1/2" CDX backing for roof flashings and membranes | SF | 1,000 | ||
| 0001 | AH | Remove existing wood framing, curbing, blocking, nailers, trim & fascia | BF | 1,000 | ||
| 0001 | AJ | Install treated wood cants, curbing, blocking and nailers | BF | 2,000 | ||
| 0001 | AK | Install wood framing | BF | 200 | ||
| 0001 | AL | Install wood trim and fascia board | BF | 200 | ||
| ROOF INSULATION | ||||||
| 0001 | AM | Remove existing insulation | BF | 6,000 | ||
| 0001 | AN | Install tapered polyisocyanurate insulation | BF | 2,000 | ||
| 0001 | AP | Install coverboard for PVC or EPDM recover | SF | 10,000 | ||
| 0001 | AQ | Install 4" polyisocyanurate insulation | SF | 4,000 | ||
| 0001 | AR | Install 5" polyisocyanurate insulation | SF | 8,000 | ||
| 0001 | AS | Install R19 fiberglass batt insulation, unfaced | SF | 400 | ||
| 0001 | AT | Install R38 fiberglass batt insulation, unfaced | SF | 400 | ||
| 0001 | AU | Install 6 mil polyethelene vapor barrier | SF | 2,000 | ||
| METAL ROOFING SYSTEMS | ||||||
| 0001 | AV | Remove existing metal roof or wall panels and flashings | SF | 400 | ||
| 0001 | AW | Reattach existing loose metal roof or wall panels and flashings | SF | 800 | ||
| 0001 | AX | Install corrugated steel roof or wall panels, field painted | SF | 100 | ||
| 0001 | AY | Install SSMR system: 20 yr warr. | SF | 5,000 | ||
| 0001 | AZ | Install light-gage steel supports for SSMR system | LB | 1,000 | ||
| 0001 | BA | Install SSMR system flashing for rake, eave, sidewall or headwall | LF | 300 | ||
| 0001 | BB | Install SSMR system flashing for ridge, hip or valley | LF | 300 | ||
| 0001 | BC | Install SSMR system snow retention system | LF | 100 | ||
| BUILT-UP ROOFING SYSTEM (BURS) | ||||||
| 0001 | BD | Sweep and spud gravel for repair, store on roof | SF | 300 | ||
| 0001 | BE | Remove BUR for roof replacement | SF | 8,000 | ||
| 0001 | BF | Repair blisters and splits in BUR membrane | SF | 100 | ||
| 0001 | BG | Repair wind scours | SF | 100 | ||
| 0001 | BH | Install 2-ply mopped roof | SF | 400 | ||
| SINGLE-PLY ROOFING SYSTEMS | ||||||
| 0001 | BJ | Install .060" fully-adhered EPDM membrane roof system | SF | 4,000 | ||
| 0001 | BK | Install EPDM flashing system on .060" EPDM | LF | 400 | ||
| 0001 | BL | Install EPDM roof membrane patch | SF | 5 | ||
| 0001 | BM | Install .060" fully-adhered PVC membrane roof system | SF | 2,000 | ||
| 0001 | BN | Install PVC flashing system on .060" PVC | LF | 300 | ||
| 0001 | BP | Install PVC roof membrane patch | SF | 2 | ||
| 0001 | BQ | Install water-based, liquid acrylic roofing membrane | SF | 1,000 | ||
| 0001 | BR | Install synthetic rubber waterproofing elastomeric sealant | SF | 1,000 | ||
| 0001 | BS | Install non-woven, spunbound polyester seam reinforcing fabric | SF | 500 | ||
| FLASHINGS AND METALS | ||||||
| 0001 | BT | Remove and replace BUR base flashing for repair | LF | 20 | ||
| 0001 | BU | Remove, clean, straighten and reinstall sheet metal flashing | LF | 300 | ||
| 0001 | BV | Sawcut for reglet in masonry or concrete | LF | 30 | ||
| 0001 | BW | Install Kynar-finished steel counter flashing | LF | 200 | ||
| 0001 | BX | Remove existing sheet metal fascia, coping and flashing | SF | 800 | ||
| 0001 | BY | Install 24 ga. Kynar-finished fascia, coping and flashing | SF | 800 | ||
| 0001 | BZ | Install 24 ga. Kynar-finished soffit panel, plain or vented | SF | 100 | ||
| 0001 | CA | Increased cost for vented ridge flashing vs non-vented | LF | 100 | ||
| 0001 | CB | Install 24 ga. galvanized steel continous cleat | LF | 300 | ||
| 0001 | CC | Install pipe penetration flashing: 0 to 6" dia. | EA | 20 | ||
| 0001 | CD | Install pipe penetration flashing: 6"+ to 12" dia. | EA | 2 | ||
| GUTTERS AND DOWNSPOUTS | ||||||
| 0001 | CE | Clean out gutters and downspouts | LF | 100 | ||
| 0001 | CF | Remove existing gutters and downspouts | LF | 100 | ||
| 0001 | CG | Install Kynar pre-finished sheet metal gutters | LF | 50 | ||
| 0001 | CH | Install Kynar pre-finished sheet metal downspouts | LF | 50 | ||
| 0001 | CJ | Install Kynar pre-finishedsheet metal roof scupper box | EA | 2 | ||
| 0001 | CK | Install precast concrete splash blocks | EA | 5 | ||
| SEALANTS | ||||||
| 0001 | CL | Remove existing backer rod and sealant, clean joint for reseal | LF | 100 | ||
| 0001 | CM | Install backer rod and polyurethane sealant: 0 to 5/8" wide | LF | 75 | ||
| 0001 | CN | Install backer rod and polyurethane sealant: >5/8" wide | LF | 25 | ||
| 0001 | CP | Install polyurethane sealant, misc. joints and seams | LB | 100 | ||
| 0001 | CQ | Install butyl sealant, misc. joints and seams | LB | 50 | ||
| ROOF DRAINS | ||||||
| 0001 | CR | Clean in and around roof drains | EA | 10 | ||
| 0001 | CS | Install new clamp ring and bolts | EA | 5 | ||
| 0001 | CT | Install new strainer basket | EA | 5 | ||
| 0001 | CU | Re-flash existing drain in single ply roof | EA | 10 | ||
| MISCELLANEOUS TASKS | ||||||
| 0001 | CV | Install new EPDM or PVC walkway pad | SF | 100 | ||
| 0001 | CW | Install new concrete paver walkway | SF | 100 | ||
| 0001 | CX | Fabricate & install plumbers vent extension 2-4" diam | LF | 10 | ||
| 0001 | CY | Remove and re-install existing ventilator | EA | 25 | ||
| 0001 | CZ | Remove and re-install rooftop mounted equipment | LB | 1,000 | ||
| 0001 | DA | Fill pitch pans | EA | 10 | ||
| 0001 | DB | Install water & ice shield | SF | 2,000 | ||
| 0001 | DC | Install #15 felt underlayment, no mopping | SF | 4,000 | ||
| 0001 | DD | Remove existing, deteriorated steel roof decking | SF | 100 | ||
| 0001 | DE | Install new steel roof decking to match existing | SF | 100 | ||
| 0001 | DF | Field paint wood or metal surface | SF | 500 | ||
| 0001 | DG | Apply Siloxane Masonry Water Repellant | 5 Gal | 1 | ||
| MOBILIZATION AND SERVICE CALLS | ||||||
| 0001 | DH | Leak service call | EA | 15 | ||
| 0001 | DJ | After hours leak service call | EA | 1 | ||
| 0001 | DK | Extended time on site for service call crew | HR | 32 | ||
| 0001 | DL | Mobilization of roofing crew | EA | 10 | ||
| 0001 | DM | Mobilization and prep. of asphalt kettle | EA | 1 | ||
| TOTAL FOR YEAR | $0.00 |
&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB
&C&P OF &N
2017 1ST OPTION
| 1ST OPTION YEAR GOVT EST: 2016-2021 ROOF IDIQ CONTRACT | ||||||
| 4-Apr-16 | ||||||
| CLIN | DESCRIPTION | UNIT OF ISSUE | UNIT COST | ESTIMATED QUANTITY | EXTENDED COST | |
| ASPHALT SHINGLES | ||||||
| 1001 | AA | Remove and replace individual shingles; match existing | SF | 100 | ||
| 1001 | AB | Remove shingles, edge metal and underlayment for reroof | SF | 3,000 | ||
| 1001 | AC | Install edge metal for reshingling | LF | 300 | ||
| 1001 | AD | Install laminated architectural shingles | SF | 3,000 | ||
| WOOD | ||||||
| 1001 | AE | Remove and replace deteriorated wood decking | BF | 160 | ||
| 1001 | AF | Install 1/2" CDX plywood sheathing | SF | 1,000 | ||
| 1001 | AG | Install 1/2" CDX backing for roof flashings and membranes | SF | 1,000 | ||
| 1001 | AH | Remove existing wood framing, curbing, blocking, nailers, trim & fascia | BF | 1,000 | ||
| 1001 | AJ | Install treated wood cants, curbing, blocking and nailers | BF | 2,000 | ||
| 1001 | AK | Install wood framing | BF | 200 | ||
| 1001 | AL | Install wood trim and fascia board | BF | 200 | ||
| ROOF INSULATION | ||||||
| 1001 | AM | Remove existing insulation | BF | 6,000 | ||
| 1001 | AN | Install tapered polyisocyanurate insulation | BF | 2,000 | ||
| 1001 | AP | Install coverboard for PVC or EPDM recover | SF | 10,000 | ||
| 1001 | AQ | Install 4" polyisocyanurate insulation | SF | 4,000 | ||
| 1001 | AR | Install 5" polyisocyanurate insulation | SF | 8,000 | ||
| 1001 | AS | Install R19 fiberglass batt insulation, unfaced | SF | 400 | ||
| 1001 | AT | Install R38 fiberglass batt insulation, unfaced | SF | 400 | ||
| 1001 | AU | Install 6 mil polyethelene vapor barrier | SF | 2,000 | ||
| METAL ROOFING SYSTEMS | ||||||
| 1001 | AV | Remove existing metal roof or wall panels and flashings | SF | 400 | ||
| 1001 | AW | Reattach existing loose metal roof or wall panels and flashings | SF | 800 | ||
| 1001 | AX | Install corrugated steel roof or wall panels, field painted | SF | 100 | ||
| 1001 | AY | Install SSMR system: 20 yr warr. | SF | 5,000 | ||
| 1001 | AZ | Install light-gage steel supports for SSMR system | LB | 1,000 | ||
| 1001 | BA | Install SSMR system flashing for rake, eave, sidewall or headwall | LF | 300 | ||
| 1001 | BB | Install SSMR system flashing for ridge, hip or valley | LF | 300 | ||
| 1001 | BC | Install SSMR system snow retention system | LF | 100 | ||
| BUILT-UP ROOFING SYSTEM (BURS) | ||||||
| 1001 | BD | Sweep and spud gravel for repair, store on roof | SF | 300 | ||
| 1001 | BE | Remove BUR for roof replacement | SF | 8,000 | ||
| 1001 | BF | Repair blisters and splits in BUR membrane | SF | 100 | ||
| 1001 | BG | Repair wind scours | SF | 100 | ||
| 1001 | BH | Install 2-ply mopped roof | SF | 400 | ||
| SINGLE-PLY ROOFING SYSTEMS | ||||||
| 1001 | BJ | Install .060" fully-adhered EPDM membrane roof system | SF | 4,000 | ||
| 1001 | BK | Install EPDM flashing system on .060" EPDM | LF | 400 | ||
| 1001 | BL | Install EPDM roof membrane patch | SF | 5 | ||
| 1001 | BM | Install .060" fully-adhered PVC membrane roof system | SF | 2,000 | ||
| 1001 | BN | Install PVC flashing system on .060" PVC | LF | 300 | ||
| 1001 | BP | Install PVC roof membrane patch | SF | 2 | ||
| 1001 | BQ | Install water-based, liquid acrylic roofing membrane | SF | 1,000 | ||
| 1001 | BR | Install synthetic rubber waterproofing elastomeric sealant | SF | 1,000 | ||
| 1001 | BS | Install non-woven, spunbound polyester seam reinforcing fabric | SF | 500 | ||
| FLASHINGS AND METALS | ||||||
| 1001 | BT | Remove and replace BUR base flashing for repair | LF | 20 | ||
| 1001 | BU | Remove, clean, straighten and reinstall sheet metal flashing | LF | 300 | ||
| 1001 | BV | Sawcut for reglet in masonry or concrete | LF | 30 | ||
| 1001 | BW | Install Kynar-finished steel counter flashing | LF | 200 | ||
| 1001 | BX | Remove existing sheet metal fascia, coping and flashing | SF | 800 | ||
| 1001 | BY | Install 24 ga. Kynar-finished fascia, coping and flashing | SF | 800 | ||
| 1001 | BZ | Install 24 ga. Kynar-finished soffit panel, plain or vented | SF | 100 | ||
| 1001 | CA | Increased cost for vented ridge flashing vs non-vented | LF | 100 | ||
| 1001 | CB | Install 24 ga. galvanized steel continous cleat | LF | 300 | ||
| 1001 | CC | Install pipe penetration flashing: 0 to 6" dia. | EA | 20 | ||
| 1001 | CD | Install pipe penetration flashing: 6"+ to 12" dia. | EA | 2 | ||
| GUTTERS AND DOWNSPOUTS | ||||||
| 1001 | CE | Clean out gutters and downspouts | LF | 100 | ||
| 1001 | CF | Remove existing gutters and downspouts | LF | 100 | ||
| 1001 | CG | Install Kynar pre-finished sheet metal gutters | LF | 50 | ||
| 1001 | CH | Install Kynar pre-finished sheet metal downspouts | LF | 50 | ||
| 1001 | CJ | Install Kynar pre-finishedsheet metal roof scupper box | EA | 2 | ||
| 1001 | CK | Install precast concrete splash blocks | EA | 5 | ||
| SEALANTS | ||||||
| 1001 | CL | Remove existing backer rod and sealant, clean joint for reseal | LF | 100 | ||
| 1001 | CM | Install backer rod and polyurethane sealant: 0 to 5/8" wide | LF | 75 | ||
| 1001 | CN | Install backer rod and polyurethane sealant: >5/8" wide | LF | 25 | ||
| 1001 | CP | Install polyurethane sealant, misc. joints and seams | LB | 100 | ||
| 1001 | CQ | Install butyl sealant, misc. joints and seams | LB | 50 | ||
| ROOF DRAINS | ||||||
| 1001 | CR | Clean in and around roof drains | EA | 10 | ||
| 1001 | CS | Install new clamp ring and bolts | EA | 5 | ||
| 1001 | CT | Install new strainer basket | EA | 5 | ||
| 1001 | CU | Re-flash existing drain in single ply roof | EA | 10 | ||
| MISCELLANEOUS TASKS | ||||||
| 1001 | CV | Install new EPDM or PVC walkway pad | SF | 100 | ||
| 1001 | CW | Install new concrete paver walkway | SF | 100 | ||
| 1001 | CX | Fabricate & install plumbers vent extension 2-4" diam | LF | 10 | ||
| 1001 | CY | Remove and re-install existing ventilator | EA | 25 | ||
| 1001 | CZ | Remove and re-install rooftop mounted equipment | LB | 1,000 | ||
| 1001 | DA | Fill pitch pans | EA | 10 | ||
| 1001 | DB | Install water & ice shield | SF | 2,000 | ||
| 1001 | DC | Install #15 felt underlayment, no mopping | SF | 4,000 | ||
| 1001 | DD | Remove existing, deteriorated steel roof decking | SF | 100 | ||
| 1001 | DE | Install new steel roof decking to match existing | SF | 100 | ||
| 1001 | DF | Field paint wood or metal surface | SF | 500 | ||
| 1001 | DG | Apply Siloxane Masonry Water Repellant | 5 Gal | 1 | ||
| MOBILIZATION AND SERVICE CALLS | ||||||
| 1001 | DH | Leak service call | EA | 15 | ||
| 1001 | DJ | After hours leak service call | EA | 1 | ||
| 1001 | DK | Extended time on site for service call crew | HR | 32 | ||
| 1001 | DL | Mobilization of roofing crew | EA | 10 | ||
| 1001 | DM | Mobilization and prep. of asphalt kettle | EA | 1 | ||
| TOTAL FOR YEAR | $0.00 |
&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB
&C&P OF &N
2018 2ND OPTION
| 2ND OPTION YEAR GOVT EST: 2016-2021 ROOF IDIQ CONTRACT | ||||||
| 4-Apr-16 | ||||||
| CLIN | DESCRIPTION | UNIT OF ISSUE | UNIT COST | ESTIMATED QUANTITY | EXTENDED COST | |
| ASPHALT SHINGLES | ||||||
| 2001 | AA | Remove and replace individual shingles; match existing | SF | 100 | ||
| 2001 | AB | Remove shingles, edge metal and underlayment for reroof | SF | 3,000 | ||
| 2001 | AC | Install edge metal for reshingling | LF | 300 | ||
| 2001 | AD | Install laminated architectural shingles | SF | 3,000 | ||
| WOOD | ||||||
| 2001 | AE | Remove and replace deteriorated wood decking | BF | 160 | ||
| 2001 | AF | Install 1/2" CDX plywood sheathing | SF | 1,000 | ||
| 2001 | AG | Install 1/2" CDX backing for roof flashings and membranes | SF | 1,000 | ||
| 2001 | AH | Remove existing wood framing, curbing, blocking, nailers, trim & fascia | BF | 1,000 | ||
| 2001 | AJ | Install treated wood cants, curbing, blocking and nailers | BF | 2,000 | ||
| 2001 | AK | Install wood framing | BF | 200 | ||
| 2001 | AL | Install wood trim and fascia board | BF | 200 | ||
| ROOF INSULATION | ||||||
| 2001 | AM | Remove existing insulation | BF | 6,000 | ||
| 2001 | AN | Install tapered polyisocyanurate insulation | BF | 2,000 | ||
| 2001 | AP | Install coverboard for PVC or EPDM recover | SF | 10,000 | ||
| 2001 | AQ | Install 4" polyisocyanurate insulation | SF | 4,000 | ||
| 2001 | AR | Install 5" polyisocyanurate insulation | SF | 8,000 | ||
| 2001 | AS | Install R19 fiberglass batt insulation, unfaced | SF | 400 | ||
| 2001 | AT | Install R38 fiberglass batt insulation, unfaced | SF | 400 | ||
| 2001 | AU | Install 6 mil polyethelene vapor barrier | SF | 2,000 | ||
| METAL ROOFING SYSTEMS | ||||||
| 2001 | AV | Remove existing metal roof or wall panels and flashings | SF | 400 | ||
| 2001 | AW | Reattach existing loose metal roof or wall panels and flashings | SF | 800 | ||
| 2001 | AX | Install corrugated steel roof or wall panels, field painted | SF | 100 | ||
| 2001 | AY | Install SSMR system: 20 yr warr. | SF | 5,000 | ||
| 2001 | AZ | Install light-gage steel supports for SSMR system | LB | 1,000 | ||
| 2001 | BA | Install SSMR system flashing for rake, eave, sidewall or headwall | LF | 300 | ||
| 2001 | BB | Install SSMR system flashing for ridge, hip or valley | LF | 300 | ||
| 2001 | BC | Install SSMR system snow retention system | LF | 100 | ||
| BUILT-UP ROOFING SYSTEM (BURS) | ||||||
| 2001 | BD | Sweep and spud gravel for repair, store on roof | SF | 300 | ||
| 2001 | BE | Remove BUR for roof replacement | SF | 8,000 | ||
| 2001 | BF | Repair blisters and splits in BUR membrane | SF | 100 | ||
| 2001 | BG | Repair wind scours | SF | 100 | ||
| 2001 | BH | Install 2-ply mopped roof | SF | 400 | ||
| SINGLE-PLY ROOFING SYSTEMS | ||||||
| 2001 | BJ | Install .060" fully-adhered EPDM membrane roof system | SF | 4,000 | ||
| 2001 | BK | Install EPDM flashing system on .060" EPDM | LF | 400 | ||
| 2001 | BL | Install EPDM roof membrane patch | SF | 5 | ||
| 2001 | BM | Install .060" fully-adhered PVC membrane roof system | SF | 2,000 | ||
| 2001 | BN | Install PVC flashing system on .060" PVC | LF | 300 | ||
| 2001 | BP | Install PVC roof membrane patch | SF | 2 | ||
| 2001 | BQ | Install water-based, liquid acrylic roofing membrane | SF | 1,000 | ||
| 2001 | BR | Install synthetic rubber waterproofing elastomeric sealant | SF | 1,000 | ||
| 2001 | BS | Install non-woven, spunbound polyester seam reinforcing fabric | SF | 500 | ||
| FLASHINGS AND METALS | ||||||
| 2001 | BT | Remove and replace BUR base flashing for repair | LF | 20 | ||
| 2001 | BU | Remove, clean, straighten and reinstall sheet metal flashing | LF | 300 | ||
| 2001 | BV | Sawcut for reglet in masonry or concrete | LF | 30 | ||
| 2001 | BW | Install Kynar-finished steel counter flashing | LF | 200 | ||
| 2001 | BX | Remove existing sheet metal fascia, coping and flashing | SF | 800 | ||
| 2001 | BY | Install 24 ga. Kynar-finished fascia, coping and flashing | SF | 800 | ||
| 2001 | BZ | Install 24 ga. Kynar-finished soffit panel, plain or vented | SF | 100 | ||
| 2001 | CA | Increased cost for vented ridge flashing vs non-vented | LF | 100 | ||
| 2001 | CB | Install 24 ga. galvanized steel continous cleat | LF | 300 | ||
| 2001 | CC | Install pipe penetration flashing: 0 to 6" dia. | EA | 20 | ||
| 2001 | CD | Install pipe penetration flashing: 6"+ to 12" dia. | EA | 2 | ||
| GUTTERS AND DOWNSPOUTS | ||||||
| 2001 | CE | Clean out gutters and downspouts | LF | 100 | ||
| 2001 | CF | Remove existing gutters and downspouts | LF | 100 | ||
| 2001 | CG | Install Kynar pre-finished sheet metal gutters | LF | 50 | ||
| 2001 | CH | Install Kynar pre-finished sheet metal downspouts | LF | 50 | ||
| 2001 | CJ | Install Kynar pre-finishedsheet metal roof scupper box | EA | 2 | ||
| 2001 | CK | Install precast concrete splash blocks | EA | 5 | ||
| SEALANTS | ||||||
| 2001 | CL | Remove existing backer rod and sealant, clean joint for reseal | LF | 100 | ||
| 2001 | CM | Install backer rod and polyurethane sealant: 0 to 5/8" wide | LF | 75 | ||
| 2001 | CN | Install backer rod and polyurethane sealant: >5/8" wide | LF | 25 | ||
| 2001 | CP | Install polyurethane sealant, misc. joints and seams | LB | 100 | ||
| 2001 | CQ | Install butyl sealant, misc. joints and seams | LB | 50 | ||
| ROOF DRAINS | ||||||
| 2001 | CR | Clean in and around roof drains | EA | 10 | ||
| 2001 | CS | Install new clamp ring and bolts | EA | 5 | ||
| 2001 | CT | Install new strainer basket | EA | 5 | ||
| 2001 | CU | Re-flash existing drain in single ply roof | EA | 10 | ||
| MISCELLANEOUS TASKS | ||||||
| 2001 | CV | Install new EPDM or PVC walkway pad | SF | 100 | ||
| 2001 | CW | Install new concrete paver walkway | SF | 100 | ||
| 2001 | CX | Fabricate & install plumbers vent extension 2-4" diam | LF | 10 | ||
| 2001 | CY | Remove and re-install existing ventilator | EA | 25 | ||
| 2001 | CZ | Remove and re-install rooftop mounted equipment | LB | 1,000 | ||
| 2001 | DA | Fill pitch pans | EA | 10 | ||
| 2001 | DB | Install water & ice shield | SF | 2,000 | ||
| 2001 | DC | Install #15 felt underlayment, no mopping | SF | 4,000 | ||
| 2001 | DD | Remove existing, deteriorated steel roof decking | SF | 100 | ||
| 2001 | DE | Install new steel roof decking to match existing | SF | 100 | ||
| 2001 | DF | Field paint wood or metal surface | SF | 500 | ||
| 2001 | DG | Apply Siloxane Masonry Water Repellant | 5 Gal | 1 | ||
| MOBILIZATION AND SERVICE CALLS | ||||||
| 2001 | DH | Leak service call | EA | 15 | ||
| 2001 | DJ | After hours leak service call | EA | 1 | ||
| 2001 | DK | Extended time on site for service call crew | HR | 32 | ||
| 2001 | DL | Mobilization of roofing crew | EA | 10 | ||
| 2001 | DM | Mobilization and prep. of asphalt kettle | EA | 1 | ||
| TOTAL FOR YEAR | $0.00 |
&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB
&C&P OF &N
2019 3RD OPTION
| 3RD OPTION YEAR GOVT EST: 2016-2021 ROOF IDIQ CONTRACT | ||||||
| 4-Apr-16 | ||||||
| CLIN | DESCRIPTION | UNIT OF ISSUE | UNIT COST | ESTIMATED QUANTITY | EXTENDED COST | |
| ASPHALT SHINGLES | ||||||
| 3001 | AA | Remove and replace individual shingles; match existing | SF | 100 | ||
| 3001 | AB | Remove shingles, edge metal and underlayment for reroof | SF | 3,000 | ||
| 3001 | AC | Install edge metal for reshingling | LF | 300 | ||
| 3001 | AD | Install laminated architectural shingles | SF | 3,000 | ||
| WOOD | ||||||
| 3001 | AE | Remove and replace deteriorated wood decking | BF | 160 | ||
| 3001 | AF | Install 1/2" CDX plywood sheathing | SF | 1,000 | ||
| 3001 | AG | Install 1/2" CDX backing for roof flashings and membranes | SF | 1,000 | ||
| 3001 | AH | Remove existing wood framing, curbing, blocking, nailers, trim & fascia | BF | 1,000 | ||
| 3001 | AJ | Install treated wood cants, curbing, blocking and nailers | BF | 2,000 | ||
| 3001 | AK | Install wood framing | BF | 200 | ||
| 3001 | AL | Install wood trim and fascia board | BF | 200 | ||
| ROOF INSULATION | ||||||
| 3001 | AM | Remove existing insulation | BF | 6,000 | ||
| 3001 | AN | Install tapered polyisocyanurate insulation | BF | 2,000 | ||
| 3001 | AP | Install coverboard for PVC or EPDM recover | SF | 10,000 | ||
| 3001 | AQ | Install 4" polyisocyanurate insulation | SF | 4,000 | ||
| 3001 | AR | Install 5" polyisocyanurate insulation | SF | 8,000 | ||
| 3001 | AS | Install R19 fiberglass batt insulation, unfaced | SF | 400 | ||
| 3001 | AT | Install R38 fiberglass batt insulation, unfaced | SF | 400 | ||
| 3001 | AU | Install 6 mil polyethelene vapor barrier | SF | 2,000 | ||
| METAL ROOFING SYSTEMS | ||||||
| 3001 | AV | Remove existing metal roof or wall panels and flashings | SF | 400 | ||
| 3001 | AW | Reattach existing loose metal roof or wall panels and flashings | SF | 800 | ||
| 3001 | AX | Install corrugated steel roof or wall panels, field painted | SF | 100 | ||
| 3001 | AY | Install SSMR system: 20 yr warr. | SF | 5,000 | ||
| 3001 | AZ | Install light-gage steel supports for SSMR system | LB | 1,000 | ||
| 3001 | BA | Install SSMR system flashing for rake, eave, sidewall or headwall | LF | 300 | ||
| 3001 | BB | Install SSMR system flashing for ridge, hip or valley | LF | 300 | ||
| 3001 | BC | Install SSMR system snow retention system | LF | 100 | ||
| BUILT-UP ROOFING SYSTEM (BURS) | ||||||
| 3001 | BD | Sweep and spud gravel for repair, store on roof | SF | 300 | ||
| 3001 | BE | Remove BUR for roof replacement | SF | 8,000 | ||
| 3001 | BF | Repair blisters and splits in BUR membrane | SF | 100 | ||
| 3001 | BG | Repair wind scours | SF | 100 | ||
| 3001 | BH | Install 2-ply mopped roof | SF | 400 | ||
| SINGLE-PLY ROOFING SYSTEMS | ||||||
| 3001 | BJ | Install .060" fully-adhered EPDM membrane roof system | SF | 4,000 | ||
| 3001 | BK | Install EPDM flashing system on .060" EPDM | LF | 400 | ||
| 3001 | BL | Install EPDM roof membrane patch | SF | 5 | ||
| 3001 | BM | Install .060" fully-adhered PVC membrane roof system | SF | 2,000 | ||
| 3001 | BN | Install PVC flashing system on .060" PVC | LF | 300 | ||
| 3001 | BP | Install PVC roof membrane patch | SF | 2 | ||
| 3001 | BQ | Install water-based, liquid acrylic roofing membrane | SF | 1,000 | ||
| 3001 | BR | Install synthetic rubber waterproofing elastomeric sealant | SF | 1,000 | ||
| 3001 | BS | Install non-woven, spunbound polyester seam reinforcing fabric | SF | 500 | ||
| FLASHINGS AND METALS | ||||||
| 3001 | BT | Remove and replace BUR base flashing for repair | LF | 20 | ||
| 3001 | BU | Remove, clean, straighten and reinstall sheet metal flashing | LF | 300 | ||
| 3001 | BV | Sawcut for reglet in masonry or concrete | LF | 30 | ||
| 3001 | BW | Install Kynar-finished steel counter flashing | LF | 200 | ||
| 3001 | BX | Remove existing sheet metal fascia, coping and flashing | SF | 800 | ||
| 3001 | BY | Install 24 ga. Kynar-finished fascia, coping and flashing | SF | 800 | ||
| 3001 | BZ | Install 24 ga. Kynar-finished soffit panel, plain or vented | SF | 100 | ||
| 3001 | CA | Increased cost for vented ridge flashing vs non-vented | LF | 100 | ||
| 3001 | CB | Install 24 ga. galvanized steel continous cleat | LF | 300 | ||
| 3001 | CC | Install pipe penetration flashing: 0 to 6" dia. | EA | 20 | ||
| 3001 | CD | Install pipe penetration flashing: 6"+ to 12" dia. | EA | 2 | ||
| GUTTERS AND DOWNSPOUTS | ||||||
| 3001 | CE | Clean out gutters and downspouts | LF | 100 | ||
| 3001 | CF | Remove existing gutters and downspouts | LF | 100 | ||
| 3001 | CG | Install Kynar pre-finished sheet metal gutters | LF | 50 | ||
| 3001 | CH | Install Kynar pre-finished sheet metal downspouts | LF | 50 | ||
| 3001 | CJ | Install Kynar pre-finishedsheet metal roof scupper box | EA | 2 | ||
| 3001 | CK | Install precast concrete splash blocks | EA | 5 | ||
| SEALANTS | ||||||
| 3001 | CL | Remove existing backer rod and sealant, clean joint for reseal | LF | 100 | ||
| 3001 | CM | Install backer rod and polyurethane sealant: 0 to 5/8" wide | LF | 75 | ||
| 3001 | CN | Install backer rod and polyurethane sealant: >5/8" wide | LF | 25 | ||
| 3001 | CP | Install polyurethane sealant, misc. joints and seams | LB | 100 | ||
| 3001 | CQ | Install butyl sealant, misc. joints and seams | LB | 50 | ||
| ROOF DRAINS | ||||||
| 3001 | CR | Clean in and around roof drains | EA | 10 | ||
| 3001 | CS | Install new clamp ring and bolts | EA | 5 | ||
| 3001 | CT | Install new strainer basket | EA | 5 | ||
| 3001 | CU | Re-flash existing drain in single ply roof | EA | 10 | ||
| MISCELLANEOUS TASKS | ||||||
| 3001 | CV | Install new EPDM or PVC walkway pad | SF | 100 | ||
| 3001 | CW | Install new concrete paver walkway | SF | 100 | ||
| 3001 | CX | Fabricate & install plumbers vent extension 2-4" diam | LF | 10 | ||
| 3001 | CY | Remove and re-install existing ventilator | EA | 25 | ||
| 3001 | CZ | Remove and re-install rooftop mounted equipment | LB | 1,000 | ||
| 3001 | DA | Fill pitch pans | EA | 10 | ||
| 3001 | DB | Install water & ice shield | SF | 2,000 | ||
| 3001 | DC | Install #15 felt underlayment, no mopping | SF | 4,000 | ||
| 3001 | DD | Remove existing, deteriorated steel roof decking | SF | 100 | ||
| 3001 | DE | Install new steel roof decking to match existing | SF | 100 | ||
| 3001 | DF | Field paint wood or metal surface | SF | 500 | ||
| 3001 | DG | Apply Siloxane Masonry Water Repellant | 5 Gal | 1 | ||
| MOBILIZATION AND SERVICE CALLS | ||||||
| 3001 | DH | Leak service call | EA | 15 | ||
| 3001 | DJ | After hours leak service call | EA | 1 | ||
| 3001 | DK | Extended time on site for service call crew | HR | 32 | ||
| 3001 | DL | Mobilization of roofing crew | EA | 10 | ||
| 3001 | DM | Mobilization and prep. of asphalt kettle | EA | 1 | ||
| TOTAL FOR YEAR | $0.00 |
&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB
&C&P OF &N
2020 4TH OPTION
| 4TH OPTION YEAR: 2016-2021 ROOF IDIQ CONTRACT | ||||||
| 4-Apr-16 | ||||||
| CLIN | DESCRIPTION | UNIT OF ISSUE | UNIT COST | ESTIMATED QUANTITY | EXTENDED COST | |
| ASPHALT SHINGLES | ||||||
| 4001 | AA | Remove and replace individual shingles; match existing | SF | 100 | ||
| 4001 | AB | Remove shingles, edge metal and underlayment for reroof | SF | 3,000 | ||
| 4001 | AC | Install edge metal for reshingling | LF | 300 | ||
| 4001 | AD | Install laminated architectural shingles | SF | 3,000 | ||
| WOOD | ||||||
| 4001 | AE | Remove and replace deteriorated wood decking | BF | 160 | ||
| 4001 | AF | Install 1/2" CDX plywood sheathing | SF | 1,000 | ||
| 4001 | AG | Install 1/2" CDX backing for roof flashings and membranes | SF | 1,000 | ||
| 4001 | AH | Remove existing wood framing, curbing, blocking, nailers, trim & fascia | BF | 1,000 | ||
| 4001 | AJ | Install treated wood cants, curbing, blocking and nailers | BF | 2,000 | ||
| 4001 | AK | Install wood framing | BF | 200 | ||
| 4001 | AL | Install wood trim and fascia board | BF | 200 | ||
| ROOF INSULATION | ||||||
| 4001 | AM | Remove existing insulation | BF | 6,000 | ||
| 4001 | AN | Install tapered polyisocyanurate insulation | BF | 2,000 | ||
| 4001 | AP | Install coverboard for PVC or EPDM recover | SF | 10,000 | ||
| 4001 | AQ | Install 4" polyisocyanurate insulation | SF | 4,000 | ||
| 4001 | AR | Install 5" polyisocyanurate insulation | SF | 8,000 | ||
| 4001 | AS | Install R19 fiberglass batt insulation, unfaced | SF | 400 | ||
| 4001 | AT | Install R38 fiberglass batt insulation, unfaced | SF | 400 | ||
| 4001 | AU | Install 6 mil polyethelene vapor barrier | SF | 2,000 | ||
| METAL ROOFING SYSTEMS | ||||||
| 4001 | AV | Remove existing metal roof or wall panels and flashings | SF | 400 | ||
| 4001 | AW | Reattach existing loose metal roof or wall panels and flashings | SF | 800 | ||
| 4001 | AX | Install corrugated steel roof or wall panels, field painted | SF | 100 | ||
| 4001 | AY | Install SSMR system: 20 yr warr. | SF | 5,000 | ||
| 4001 | AZ | Install light-gage steel supports for SSMR system | LB | 1,000 | ||
| 4001 | BA | Install SSMR system flashing for rake, eave, sidewall or headwall | LF | 300 | ||
| 4001 | BB | Install SSMR system flashing for ridge, hip or valley | LF | 300 | ||
| 4001 | BC | Install SSMR system snow retention system | LF | 100 | ||
| BUILT-UP ROOFING SYSTEM (BURS) | ||||||
| 4001 | BD | Sweep and spud gravel for repair, store on roof | SF | 300 | ||
| 4001 | BE | Remove BUR for roof replacement | SF | 8,000 | ||
| 4001 | BF | Repair blisters and splits in BUR membrane | SF | 100 | ||
| 4001 | BG | Repair wind scours | SF | 100 | ||
| 4001 | BH | Install 2-ply mopped roof | SF | 400 | ||
| SINGLE-PLY ROOFING SYSTEMS | ||||||
| 4001 | BJ | Install .060" fully-adhered EPDM membrane roof system | SF | 4,000 | ||
| 4001 | BK | Install EPDM flashing system on .060" EPDM | LF | 400 | ||
| 4001 | BL | Install EPDM roof membrane patch | SF | 5 | ||
| 4001 | BM | Install .060" fully-adhered PVC membrane roof system | SF | 2,000 | ||
| 4001 | BN | Install PVC flashing system on .060" PVC | LF | 300 | ||
| 4001 | BP | Install PVC roof membrane patch | SF | 2 | ||
| 4001 | BQ | Install water-based, liquid acrylic roofing membrane | SF | 1,000 | ||
| 4001 | BR | Install synthetic rubber waterproofing elastomeric sealant | SF | 1,000 | ||
| 4001 | BS | Install non-woven, spunbound polyester seam reinforcing fabric | SF | 500 | ||
| FLASHINGS AND METALS | ||||||
| 4001 | BT | Remove and replace BUR base flashing for repair | LF | 20 | ||
| 4001 | BU | Remove, clean, straighten and reinstall sheet metal flashing | LF | 300 | ||
| 4001 | BV | Sawcut for reglet in masonry or concrete | LF | 30 | ||
| 4001 | BW | Install Kynar-finished steel counter flashing | LF | 200 | ||
| 4001 | BX | Remove existing sheet metal fascia, coping and flashing | SF | 800 | ||
| 4001 | BY | Install 24 ga. Kynar-finished fascia, coping and flashing | SF | 800 | ||
| 4001 | BZ | Install 24 ga. Kynar-finished soffit panel, plain or vented | SF | 100 | ||
| 4001 | CA | Increased cost for vented ridge flashing vs non-vented | LF | 100 | ||
| 4001 | CB | Install 24 ga. galvanized steel continous cleat | LF | 300 | ||
| 4001 | CC | Install pipe penetration flashing: 0 to 6" dia. | EA | 20 | ||
| 4001 | CD | Install pipe penetration flashing: 6"+ to 12" dia. | EA | 2 | ||
| GUTTERS AND DOWNSPOUTS | ||||||
| 4001 | CE | Clean out gutters and downspouts | LF | 100 | ||
| 4001 | CF | Remove existing gutters and downspouts | LF | 100 | ||
| 4001 | CG | Install Kynar pre-finished sheet metal gutters | LF | 50 | ||
| 4001 | CH | Install Kynar pre-finished sheet metal downspouts | LF | 50 | ||
| 4001 | CJ | Install Kynar pre-finishedsheet metal roof scupper box | EA | 2 | ||
| 4001 | CK | Install precast concrete splash blocks | EA | 5 | ||
| SEALANTS | ||||||
| 4001 | CL | Remove existing backer rod and sealant, clean joint for reseal | LF | 100 | ||
| 4001 | CM | Install backer rod and polyurethane sealant: 0 to 5/8" wide | LF | 75 | ||
| 4001 | CN | Install backer rod and polyurethane sealant: >5/8" wide | LF | 25 | ||
| 4001 | CP | Install polyurethane sealant, misc. joints and seams | LB | 100 | ||
| 4001 | CQ | Install butyl sealant, misc. joints and seams | LB | 50 | ||
| ROOF DRAINS | ||||||
| 4001 | CR | Clean in and around roof drains | EA | 10 | ||
| 4001 | CS | Install new clamp ring and bolts | EA | 5 | ||
| 4001 | CT | Install new strainer basket | EA | 5 | ||
| 4001 | CU | Re-flash existing drain in single ply roof | EA | 10 | ||
| MISCELLANEOUS TASKS | ||||||
| 4001 | CV | Install new EPDM or PVC walkway pad | SF | 100 | ||
| 4001 | CW | Install new concrete paver walkway | SF | 100 | ||
| 4001 | CX | Fabricate & install plumbers vent extension 2-4" diam | LF | 10 | ||
| 4001 | CY | Remove and re-install existing ventilator | EA | 25 | ||
| 4001 | CZ | Remove and re-install rooftop mounted equipment | LB | 1,000 | ||
| 4001 | DA | Fill pitch pans | EA | 10 | ||
| 4001 | DB | Install water & ice shield | SF | 2,000 | ||
| 4001 | DC | Install #15 felt underlayment, no mopping | SF | 4,000 | ||
| 4001 | DD | Remove existing, deteriorated steel roof decking | SF | 100 | ||
| 4001 | DE | Install new steel roof decking to match existing | SF | 100 | ||
| 4001 | DF | Field paint wood or metal surface | SF | 500 | ||
| 4001 | DG | Apply Siloxane Masonry Water Repellant | 5 Gal | 1 | ||
| MOBILIZATION AND SERVICE CALLS | ||||||
| 4001 | DH | Leak service call | EA | 15 | ||
| 4001 | DJ | After hours leak service call | EA | 1 | ||
| 4001 | DK | Extended time on site for service call crew | HR | 32 | ||
| 4001 | DL | Mobilization of roofing crew | EA | 10 | ||
| 4001 | DM | Mobilization and prep. of asphalt kettle | EA | 1 | ||
| TOTAL FOR YEAR | $0.00 |