Preproposal Conference GC-MATOC.pptx
PPTX presentation 499 KB Posted
- Attached to
- General Construction Multiple Award Task Order Contract (GC-MATOC)- Beale AFB Federal contract opportunity
- Solicitation number
- FA468624R0011
About this file
This document is a PowerPoint presentation for a preproposal conference on a General Construction - Multiple Award Task Order Contract (GC-MATOC) solicitation by the Department of the Air Force, Air Combat Command.
The key details are:
- This is a competitive indefinite-delivery, indefinite-quantity (IDIQ) construction contract with a 10-year period of performance and an estimated value of $500M.
- The GC-MATOC SOW covers the full range of construction activities at Beale AFB, CA and other locations under Beale's responsibility.
- This is a total small business set-aside, with eligible small businesses required to have offices in the San Francisco, Fresno, or Sacramento SBA regional office territories.
- Proposal documentation required includes Standard Form 1442, GSA Form 527, past performance questionnaire, teaming agreements, and other standard contracting forms.
- The evaluation process will use a Highest Technically Rated Offer (HTRO) method, with a minimum score of 12,500 points required out of a total possible 14,700 points.
- The proposal due date is April 1, 2024 by 2:00 pm.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Meeting Minutes 04112024-TP GC-MATOC updated 29 Apr 24.pdf | ||
| GC MATOC and Transportation IDIQ Preproposal Conference Meeting Minutes.pdf | ||
| GC-MATOC Solicitation DRAFT 4 Mar 24 - FA468624R0011.pdf | ||
| Self_Scoring_Work_DRAFT GC-MATOC.xlsx | XLSX spreadsheet | |
| GC-MATOC SOW DRAFT FA468624R0011 1 Sep 23 v1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Construction – Multiple Award Task Order Contract
(GC-MATOC)
Preproposal Conference
GC-MATOC
Agenda
Discuss the Statement of Work and contractors' responsibilities for full performance
To explain HTRO and evaluation factors.
Briefing on the solicitation and the Government requirement;
Description of the requirement, selection criteria, and method of award.
Required Proposal Ducumentation
Special terms and conditions not ordinarily included in similar solicitations.
The Statement of Work – Contractor's responsibilities Z:\0New_9 CONS_PKA\Contracts (Const. Only)\FY24\GC-MATOC\Solicitation Package\KTR version. GC-MATOC SOW FA468624R0011 1 Sep 23 v1.pdf
The contractor shall function as an integral team member in support of the Air Force and other customer missions
Contractor shall perform all work in accordance with federal, state, and local statutes and regulations.
Contractor shall identify and comply with all applicable federal, state, and local laws; statutes; Executive Orders; Department of Defense/Air Force manuals, handbooks, regulations, guidance, and policies. The contractor shall comply with the National Institute of Building Sciences’ Whole Building Design Guide Construction Criteria Base (CCB) Unified Facility Criteria (UFC), Beale AFB Design Guide and all of the related libraries.
Highest Technically Rated Offer (HTRO) process for KT selections Volume -1: GENERAL (Provide documents for all that apply) Volume -2: RELEVANT EXPERIENCE (Provide documents for all that apply) Total Points possible in Volume-2 =14,700 Minimum points required for this=12,500 Volume -3: Bonus Area – CERTIFICATIONS/TRAINING DOCUMENTS NOTE: The bonus area can add points to those of Vol-2.
Awards will be to the 5-7 KTRS with the highest scores after combining Vol-2 and Vol-3.
Solicitation and Required Documentation
Proposal Due Date: 1 Apr 24 by 1400hrs Required to be submitted w/ offer -Signed SF1442 and acknowledgement of any Amendments.
-Submit all required Volumes and supporting documentation -Signed GSA-527 Qualifications and Financial info -Past Performance Question document -Any Teaming agreements/Subcontractors commitment letter -Etc.
Special Terms and Conditions
On-Ramp / Off-Ramp procedures
Bonds $10M and $25M
Q&A image1.jpeg image2.jpeg image3.png image4.svg
.MsftOfcResponsive_Fill_ffffff { fill:#FFFFFF;
image5.png image6.svg
.MsftOfcResponsive_Fill_ffffff { fill:#FFFFFF;
image7.jpeg
File details come from the government source that posted it. Updated .