PERFORMANCE WORK STATEMENT

MAINTENANCE, REPAIR, & INSPECTION

SERVICES

For

VERTICAL TRANSPORTATION EQUIPMENT

November 2018

Beale AFB, CA

PERFORMANCE WORK STATEMENT (PWS) FOR

VERTICAL TRANSPORTATION EQUIPMENT MAINTENANCE, REPAIR, &

INSPECTION SERVICES

1. DESCRIPTION OF SERVICES. The Contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Beale AFB, CA in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the exclusions listed in paragraph 2 below). The VTE and their locations will be listed in Appendix B. NOTE: The term “VTE” in this PWS includes all equipment listed in Appendix B: freight and passenger elevators, escalators, and may include wheelchair/stair lifts, dock levelers, and dumbwaiters.

1.1. This full maintenance contract signifies a VTE service provider (Contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, the monthly fixed price includes all inspections, maintenance, repairs, replacements, and routine and emergency service calls. This contract allows the Government to budget total yearly costs and eliminates concerns relating to individual parts repair or replacement invoicing. The Contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the Performance Objectives of paragraph 6.

1.2. Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2007 (or applicable code for the year VTE put in service), Safety Code for Elevators and Escalators (ASME A17.1), ANSI/ASME A17.2-2010, Guide for Inspection of Elevators, Escalators, and Moving Walks (applicable to equipment), A17.3-2011, Safety Code for Existing Elevators and Escalators (applicable to equipment), National Fire Protection Association Standards (NFPA), Unified Facilities Criteria (UFC) 3-600-01, Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the original equipment manufacturer (OEM).

2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:

2.1. Alterations (a.k.a., modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2)

2.2. Acts by parties other than the Contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power generator power spikes and low quality) are not included in the contract.

2.3. Additional items excluded in the full maintenance coverage are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting and lowering that are not solely dedicated to the VTE, air conditioners, and heaters.

2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames is not included in the basic full maintenance service.

2.5. In the event that the Contractor encounters an item of work included in paragraph 2.1 through 2.4, the Contractor will report the situation to the Contracting Officer’s Representative (COR).

The report will include the work location, a detailed scope of the required work, justification for Contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE:

Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the Contractor’s responsibility to obtain an engineered equivalent product from a commercial source.

3. DEFINITIONS:

3.1. Maintenance, Repair and Replacement. Maintenance, repair and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.

3.2 Alteration. An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Alteration/modernization will be covered on an over and above Contract Line Item or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 Code edition. See ASME A17.1 for requirements.

4. MAINTENANCE AND INSPECTION SERVICES:

4.1. The Contractor with the Contracting Officer (CO)/COR shall determine the working order and condition of all VTE listed in Appendix B within thirty (30) calendar days of contract award. The Government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the Contractor to replace the missing items, accomplish the repair, and reimburse the Contractor in accordance with the contract. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3. The Contractor and the CO shall certify their agreement as to the working order of the equipment. All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).

4.2 The Contractor shall develop and submit to the Government an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days after contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed. The Contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements.

4.3. The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.

4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, and repairs are required.

4.5. The Contractor shall perform necessary inspections and tests as required under ASME A17.1 Appendix N, using a Qualified Elevator Inspector (QEI). The first annual test shall include the five-(5)-year test for all traction and roped hydraulic elevators regardless of due date. The three-

(3) - year test shall be scheduled in conjunction with the annual test two years later from the first annual test.

4.6. The Government may perform inspections of the VTE for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor will be notified in writing of any determination and may be responsible for the corrective actions.

4.7. The Contractor shall prepare and submit a written report within two (2) business days of work.

The report shall identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the VTE.

4.8. The Contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/COR. The index and copies of certificates shall be delivered to the CO/COR upon request; however, no later than one (1) business day of a request to review.

5. REPAIR SERVICE CALLS. Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. All repair work shall be done in accordance with standard commercial practices. Contractor shall repair and replace components of the VTE at no additional cost to the Government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency.

The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14 21 00. 00 20 Electric Traction Elevators, UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, and UFGS 14 2 00 Hydraulic Elevators for guidance.

5.1. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.

5.1.1. Routine calls will be placed by the COR or the CO orally or in writing and will be assigned a call number. Upon receiving a routine call, the Contractor shall report to the site within 48 hours after receipt of the call on regular scheduled work days/hours to evaluate, and repair the problem.

The Contractor shall return defective and replaced parts to the COR if requested.

5.1.2. The Contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time and cost of repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions.

5.2.1. Emergency calls will be placed by the COR, 9th Civil Engineering Squadron Duty Officer (SDO) or the CO orally or in writing and will be assigned a call number. Upon receiving an emergency call, the Contractor shall report to the VTE site within two (2) hours after receipt of the call and begin repairs. The Contractor shall return defective and replaced parts to the COR if requested.

5.2.2. The Contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time to repair and cost of repairs not covered in the basic full maintenance service contract but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the emergency repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

6. SERVICES SUMMARY.

The Government will evaluate the Contractor performance in accordance with the following criteria. Performance evaluations will be rendered in one or more Government databases for that purpose.

Performance Objective PWS Para Performance Threshold

1. Written Maintenance Control Program (MCP) for each VTE for all equipment.

MCP identifies all maintenance intervals to include safety inspections.

4 MCP in accordance with ASME A17.1 delivered to CO in 30 calendar days of contract award.

2. VTE Service Availability 4 VTE availability is 95%.

Calculation = ((sum of all VTE * # days in service during the selected month for each VTE) / (# VTE * # days in the selected month)).

3. Repair Service Call Routine – Response Time.

Response to routine calls within time specified in paragraph 5.1.1.

5 Response to routine service calls are on-time 100% of the time on a monthly basis.

4. Repair Service Call Emergency – Response Time.

Response to emergency calls within time specified in paragraph 5.2.1.

5 Response to emergency service calls are on-time 100% of the time on a monthly basis.

5. Service Call Repairs – Repair Quality.

Repairs are of high quality resulting in reduced call backs.

5 Only two call backs of the same problem (same instance) each month.

5. Inspection – MCP Adherence Inspection to MCP 100%

6. Preventative Maintenance - MCP Adherence

4.7., 5.1.3, 5.2.3.

Preventative maintenance performed to MCP 100% of time.

7. Reporting 2, 4, 5 Submit reports in a manner consistent with PWS 100% of the time.

7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government does not anticipate providing any government furnished property (GFP).

8. GENERAL INFORMATION.

8.1. QUALITY CONTROL. Contractor shall develop and maintain a quality control program (QCP) to ensure maintenance and repair services are performed in accordance with ANSI/ASME A17 and other applicable standards and codes. The Contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the Contractor shall develop quality control procedures that address the areas identified in Paragraph 6, Service Summary. The QCP shall demonstrate how the Contractor ensures quality performance during the contract period of performance. The Contractor shall maintain the QCP throughout the period of performance of the contract. The CO will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, VTE MCP, and the location of all inspection records and key control logs which will always be available to the government upon request. The QCP will have the inspection forms and records which will be used for the service. The Contractor will identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints.

8.2. QUALITY ASSURANCE. The Government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.

8.3. HOURS OF OPERATION. Base hours of operation are 0600 to 1700. The Contractor may find it necessary to deviate from the normal base hours of operation, to ensure timely completion of work under this PWS at no additional cost to the government.

8.3.1. FEDERAL HOLIDAYS.

New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance.

8.3.2. BASE CLOSURES. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.

8.4. SECURITY REQUIREMENTS. The contractor shall comply with all requirements and procedures IAW FAR 5353.242-9000, Contractor Access to Air Force Installations. All Contractor personnel shall obtain pass and individual picture identification items in accordance with base and Air Force regulations. An Entry Access Listing (EAL) shall be turned in to the Contract Administrator (CA) within 5 business days prior to the start of work on base. The EAL will be sent to Security Forces who will conduct a background check on each employee. After everyone on the listing has been cleared, the CA will notify the Contractor and the Contractor will have approximately two (2) weeks to get their badges. These may be obtained at Pass & ID, Bldg 25215/25216.

8.4.1. BADGE TURN-IN. The Contractor shall turn in pass and identification items of employees who are terminated, quit, or otherwise leave the employ of the Contractor. The contractor will turn in all items to the COR or the CO within 2 business days.

8.5. SPECIAL QUALIFICATIONS. The Contractor will be licensed by the State in which the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements (documentation provided to CO/COR upon request) in maintenance of

VTE.

8.6. SCHEDULE COORDINATION. The Contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the CO/COR. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.

8.7. ENVIRONMENTAL CONTROL. The Contractor shall comply, and assure that all subcontractors comply, with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the Contractor shall use environmentally safe products in the course of completion of their project. The Contractor shall maintain, in company vehicle on site, Material Safety Data Sheets (MSDS) for all chemicals.

A copy of all MSDS will be provided to the CO/COR. The MSDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The Contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the Contractor shall immediately notify the CO/COR and appropriate emergency responders. The Contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The Contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.

8.7.1. SPILL PREVENTION AND RESPONSE. If the Contractor spills or releases any substance listed in CA Health and Safety Code Section 25507, Title 19 CCR Div.2 Ch. 4 Article 2, 40 CFR 302 and 355into the environment, the Contractor shall immediately report the incident to the COR. The Contractor shall be liable for the spill or release of such substances.

The Contractor shall ensure all employees are knowledgeable of spill prevention and response procedures. If a spill does occur, the Contractor shall take immediate action to contain it and report the incident to the Fire Department by dialing 911 from any base phone. If calling by cellular phone, dial (530) 634-8675. The Contractor shall also notify Environmental at (530)301-9413. The spill shall also be reported in writing to the COR within 48 hours.

8.7.1.1. HAZARDOUS SPILLS AND DISCHARGE. The Contractor is responsible for cleanup of any hazardous spills or discharges. The Contractor shall clean-up, containerize, and properly dispose of any spills caused by the Contractor’s employees such that no petroleum product, toxic chemical or hazardous substance enters any creek, gutter, or other appurtenance leading to natural drainage, storm drainage, or sanitary sewer systems. This includes any chemicals or substances that cause soil staining or other potential for air, water, soil degradation as determined by the base environmental flight. If required by the government, the Contractor shall sample the spill site, in the presence of Environmental, to show adequacy of spill cleanup. All clean up procedures shall follow all Federal, State, and County laws and regulations.

8.7.1.2. GOVERNMENT RESOURCES. Spill cleanup using government resources will be charged to the Contractor at an amount determined by the CO based on actual cost for manpower, supplies, equipment, and any resulting fines levied for the spill clean-up and testing.

8.7.2. OZONE DEPLETING CHEMICALS (ODC). The Contractor shall not use, in performance of this requirement, Class I ODCs, nor shall the delivery of these Class I ODCs be any item or supply or part of any service. If no suitable substitute to a Class I ODC exists, the Contractor must contact the CO.

8.7.3. ENVIRONMENTAL AND HAZARDOUS MATERIALS HANDLING. The Contractor is responsible for advising his employees of all Environmental and Hazardous Materials handling is also required to have and maintain Material Safety Data Sheets (MSDS) or Safety Data Sheets (SDS) on all materials that are required by State and Federal laws and/or regulations (Reference 91-301 and OSHA requirements).

8.7.4. HAZARDOUS MATERIAL. The Contractor shall be responsible for knowing which materials are considered hazardous and shall comply with Federal, State, and County requirements pertaining to the proper use, labeling, storage, transporting, and disposal of hazardous materials and hazardous wastes. Hazardous material includes all material hazardous to health, safety, or the environment, such as but not limited to, hazardous chemicals, hazardous substances, toxic chemicals, and extremely hazardous substances, as defined by any of the following:

29 Code of Federal Regulation (CFR) 1910.1200 40 CFR Part 302, Table 302.4 40 CFR Part 355 with Appendices

40 CFR 372.65

The government’s policy is to reduce the use of hazardous materials in keeping with federal pollution prevention goals. Beale AFB uses a Hazardous Materials Management Process (HMMP) to control and reduce the use of hazardous materials and to maintain a hazardous chemical inventory in accordance with policy and regulatory requirements.

8.7.4.1. ALL HAZARDOUS MATERIALS. All hazardous materials must be approved by the HMMP prior to being brought onto the installation. The Contractor shall submit a list of hazardous materials intended for use, along with corresponding MSDS’/SDS’, to the HMMP Lead/Designated Point-of-Contact (POC) through the COR at least thirty (30) calendar days prior to beginning work or bringing hazardous materials onto the installation. The listing shall include product name, chemical type, container type and size, the quantity to be brought onto the installation, process for which it will be used, and disposal method(s) for empty containers and any resulting hazardous or nonhazardous waste.

8.7.4.2. APPROVED HAZARDOUS MATERIALS. The Contractor shall report how and when approved hazardous materials are used, including any amount spilled, evaporated as an air emission, or properly disposed of as a solid or hazardous waste. The Contractor shall submit to the HMMP, through the COR, an inventory of approved hazardous materials brought onto the installation within five (5) calendar days after initial job start. The inventory shall include product name, chemical type, quantity on-hand, and quantity to be used. An updated quarterly inventory shall be submitted to the HMP, through the COR, not later than the 10th of the month following the previous quarter listing quantities used during the previous month, total quantities used since job start (on an annual basis), and any amount disposed of as hazardous or nonhazardous waste.

Contractor shall use the attached form, or other previously COR approved format to report inventory information.

8.7.5. HAZARDOUS WASTE. Hazardous waste includes, but is not limited to, material discarded or disposed of which exhibits characteristics of toxicity, reactivity, corrosivity, or ignitability, or which is listed as hazardous waste by any of the following:

40 CFR Park 261 CCR Title 22, Division 4.5

The government’s policy is to reduce the disposal of hazardous waste in keeping with federal pollution prevention goals. The Contractor will be responsible for providing equipment and containers.

8.8. ASBESTOS. The Contractor shall comply with Section 29 CFR 1910.1001(j)(7)(iv). VTE may be located in facilities that may contain ACM or PACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.

APPENDICES.

A. ESTIMATED WORKLOAD DATA

B. VTE EQUIPMENT LISTING

C. APPLICABLE PUBLICATIONS AND FORMS

Appendix A

ESTIMATED WORKLOAD DATA

ITEM

NAME

ESTIMATED QUANTITY

Monthly Inspection and test of 15 Elevators

Months

Number of Hydraulic Elevators

Each

Number of Traction Elevators

Number of Screw Type Handicap Lifts

Estimated number of hours for routine/emergency repair calls/year

HR

Annual Inspections of 15 Elevators

YR

Semi-annual Inspections of 15 Elevators

YR

Quarterly Maintenance Inspections of 15 Elevators

QT

Appendix B

EQUIPMENT LISTING

Manufacturer Size Type Location

Dover

25 Hp 2 Stop

Hydraulic

Bldg 1025

Maxton

25 Hp 2 Stop

Bldg 1069

25 HP 2 Stop

Bldg 1074

Bldg 1075

Capitol

Bldg 1075 Dock 2

Porch-Lift

2 Stop Handicap Lift

Screw

Bldg 1086

40 Hp 3 Stop

Bldg 2145

25 Hp 4 Stop

Bldg 2145

Elevator International

20 Hp 10 Stop

Traction

Bldg 11103

Bldg 11200

50 Hp 2 Stop

Bldg 23260

Capitol

50 Hp 2 Stop

Bldg 23265

30 HP 3 Stop

Bldg 24109

25 Hp 3 Stop

Bldg 24110

25 Hp 3 Stop

Bldg 24114

Appendix C

APPLICABLE PUBLICATIONS AND FORMS

Publication No. Title Date American Society of Mechanical

Engineer (ASME)

American National Standards Institute

(ANSI)

Occupational Safety & Health Administration (OSHA) Regulations

National Fire Protection Association Standards (NFPA)

3-600-01 Unified Facilities Criteria (UFC) Unified Facilities Guide Specifications

(UFSG)

NAVFAC MO-322 Inspection for Maintenance of Public Utilities -Vol.1

NAVFAC MO-118 Inspection of Vertical Transportation Equipment

AFR 127-12 Air Force Safety, Occupational Fire Prevention and Health Program

Mar. 90

AFR 79-1 Industrial Labor Relations Activities Jul. 85 Joint Ethics Regulations Environmental Regulations:

-Code of Federal Regulations (CFR) -CA Health and Safety Code

-CA Code of Regulations (CCR)

PERFORMANCE WORK STATEMENT
ITEM