Atch_4_-_Schedule_Material_Submittals.xls
XLS spreadsheet 59 KB Posted
- Attached to
- Install Shock Absorbing Concrete Barricades at EOD Range on March ARB CA Federal contract opportunity
- Solicitation number
- FA466418B0002
About this file
Atch 4 - Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.doc | DOC document | |
| Atch_1_-_Wage_Dec_9-7-18.doc | DOC document | |
| Amendment_0002.pdf | ||
| Atch_1_-_Wage_Dec_8-31-18.doc | DOC document | |
| Atch_8_-_QUESTIONS_&_ANSWERS.doc | DOC document | |
| FA466418B0002_-_Site_Walk_Notes.pdf | ||
| FA466418B0002_-_Amend_0001.docx | DOCX document | |
| FA466418B0002_-_SF1442.pdf | ||
| Atch_3_-_Drawings-Spec's.pdf | ||
| Atch_5_-_FEP_dated_June_2016.pdf | ||
| Atch_2_-_SOW_dated_8_Aug_18.doc | DOC document | |
| Atch_6_-_Contractor_Security_Pamphlet_-_11_October_2017.pdf | ||
| Atch_7_-_Site_Visit-Bid_Opening-Bid_Delivery_Pass_Sheet.doc | DOC document | |
| Atch_1_-_Wage_Dec_7-20-18.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: PDPG 12-0107 | Project Title: | |
| INSTALL BARRICADES FOR EOD RANGE | Solicitation / Contract Number: |
FA466418B0002
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||
| Number of Copies Required | Remarks | ||||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | |||||
| Notified | Contractor Resubmittal | Final Approval | |||||||||||||||||||||
| Approved | Disapproved | ||||||||||||||||||||||
| Shock Absorbing Concrete Specification | |||||||||||||||||||||||
| 1 | Table 1 Mix Design | 2 | 2 | Not later than 10 Days after NTP | |||||||||||||||||||
| 01010-General Conditions | |||||||||||||||||||||||
| 2 | 2 - As Built | 2 | Not later than final inspection | ||||||||||||||||||||
| 033000-Cast-in-Place Concrete | |||||||||||||||||||||||
| 3 | SD-05/SD-06-Concrete Mix Design | 2 | 2 | Not later than 10 Days after NTP | |||||||||||||||||||
| 321123-Aggregate Base Course | |||||||||||||||||||||||
| 4 | SD-06-Test Reports | 2 | 2 | Not later than 10 Days after NTP | |||||||||||||||||||
| Attachment 4 to FA466418B0002 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)