FA4664-17-R-0001,_Grounds_Maintenance_Services_at_March_ARB.pdf

PDF 2 MB Posted

Attached to
Grounds Maintenance Services Federal contract opportunity
Solicitation number
FA4664-17-R-0001
Issued by
Department of the Air Force Reserve Command

About this file

SF 1449 (RFP) Grounds Maintenance Services at March ARB

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4664-17-R-0001

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months Maintain Improved Grounds

FFP

Maintain improved grounds, growing season, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

FOB: Destination

SIGNAL CODE: A

NET AMT

0003 12 Months Maintain Irrigation System

FFP

Maintain, operate, and repair irrigation system, in accordance with the

Perforamance Work Statement (PWS) dated 12 August 2016.

0004 12 Months Remove Debris/Police Grounds

FFP

Remove debris/police grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0005 1 Each Leaf Removal

FFP

Leaf removal, improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0006 1 Each Fertilization and Ground Aeration

FFP

Fertilization and ground aeration, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0008 12 Months Prune Shurbs

FFP

Prune shurbs, hedges, trees and other plants, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

0009 12 Months Maintain Semi-Improved Grounds

FFP

Maintain semi-improved grounds, growing season, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

0010 2 Each Maintain Runways

FFP

Maintain runways, overruns, shoulders, taxiways, aprons, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

0011 12 Months Maintain Airfield

FFP

Maintain airfield, growing season, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0013 12 Months Maintain Un-Improved Grounds

FFP

Maintain un-improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0014 12 Months Vegetative Beds

FFP

Maintain vegetative beds, inert beds, and related areas, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

0015 12 Months Maintain Drainage Ditches

FFP

Maintain surface drainage ditches, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0017 270 Each Trim Palm Trees

FFP

Trim palm trees (excluding cannary island date palm), in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

0018 50 Each Trim Cannary Island Date Palm Tree

FFP

Trim cannary island date palm trees, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0019 1 Lot Prune Trees

FFP

Prune trees, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

0020 1 Lot Emergency Tree Pruning

FFP

Emergency tree pruning, in accordance with the Performance Work Statement

(PWS) dated 12 August 2016.

0021 1 Lot Tree and Stump Removal, Large

FFP

Tree and stump removal, large, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0022 1 Lot Tree and Stump Removal, Medium

FFP

Tree and stump removal, medium, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0023 1 Lot Tree and Stump Removal, Small

FFP

Tree and stump removal, small, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0025 1 Lot Stump Removal

FFP

Stump removal, in accordance with the Performance Work Statement (PWS) dated

12 August 2016.

0026 1 Lot Emerg Tree and Stump Removal, Large

FFP

Emergency tree and stump removal, large, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

0027 1 Lot Emerg Tree and Stump Removal, Medium

FFP

Emergency tree and stump removal, medium, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

0028 1 Lot Emerg Tree and Stump Removal, Small

FFP

Emergency tree and stump removal, small in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

0029 1 Lot Special Cuts

FFP

Special cuts, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

0030 1 Lot Plant Trees, Shurbs, Vegetative Beds

FFP

Plant trees, shurbs, vegetative beds to conform with xeriscaping, in accordance with the Performance Work Statement (PWS) dated 12 August 2016.

0031 1 Lot Lawn Renovation/Damaged Grounds

FFP

Lawn renovation/damaged grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

0032 1 Lot Mobilization and Transition

FFP

A one-time fee for the mobilization and transition period, the contractor shall work jointly with the existing work force to assume full responsibility of all functional areas on the contract performance start date, to include coordinating with all affected activities to preclude any adverse impact on the mission. The mobilization and transition period shall not exceed 30 calendar days.

1001 12 Months OPTION Maintain Improved Grounds

FFP

Maintain improved grounds, growing season, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

1003 12 Months OPTION Maintain Irrigation System

FFP

Maintain, operate, and repair irrigation system, in accordance with the

Perforamance Work Statement (PWS) dated 12 August 2016.

1004 12 Months OPTION Remove Debris/Police Grounds

FFP

Remove debris/police grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1005 1 Each OPTION Leaf Removal

FFP

Leaf removal, improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1006 1 Each OPTION Fertilization and Ground Aeration

FFP

Fertilization and ground aeration, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1008 12 Months OPTION Prune Shurbs

FFP

Prune shurbs, hedges, trees and other plants, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

1009 12 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain semi-improved grounds, growing season, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

1010 2 Each OPTION Maintain Runways

FFP

Maintain runways, overruns, shoulders, taxiways, aprons, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

1011 12 Months OPTION Maintain Airfield

FFP

Maintain airfield, growing season, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1013 12 Months OPTION Maintain Un-Improved Grounds

FFP

Maintain un-improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1014 12 Months OPTION Vegetative Beds

FFP

Maintain vegetative beds, inert beds, and related areas, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

1015 12 Months OPTION Maintain Drainage Ditches

FFP

Maintain surface drainage ditches, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1017 270 Each OPTION Trim Palm Trees

FFP

Trim palm trees (excluding cannary island date palm), in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

1018 50 Each OPTION Trim Cannary Island Date Palm Tree

FFP

Trim cannary island date palm trees, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1019 1 Lot OPTION Prune Trees

FFP

Prune trees, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

1020 1 Lot OPTION Emergency Tree Pruning

FFP

Emergency tree pruning, in accordance with the Performance Work Statement

(PWS) dated 12 August 2016.

1021 1 Lot OPTION Tree and Stump Removal, Large

FFP

Tree and stump removal, large, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1022 1 Lot OPTION Tree and Stump Removal, Medium

FFP

Tree and stump removal, medium, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1023 1 Lot OPTION Tree and Stump Removal, Small

FFP

Tree and stump removal, small, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

1025 1 Lot OPTION Stump Removal

FFP

Stump removal, in accordance with the Performance Work Statement (PWS) dated

12 August 2016.

1026 1 Lot OPTION Emerg Tree and Stump Removal, Large

FFP

Emergency tree and stump removal, large, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

1027 1 Lot OPTION Emerg Tree and Stump Removal, Medium

FFP

Emergency tree and stump removal, medium, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

1028 1 Lot OPTION Emerg Tree and Stump Removal, Small

FFP

Emergency tree and stump removal, small in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

1029 1 Lot OPTION Special Cuts

FFP

Special cuts, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

1030 1 Lot OPTION Plant Trees, Shurbs, Vegetative Beds

FFP

Plant trees, shurbs, vegetative beds to conform with xeriscaping, in accordance with the Performance Work Statement (PWS) dated 12 August 2016.

1031 1 Lot OPTION Lawn Renovation/Damaged Grounds

FFP

Lawn renovation/damaged grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2001 12 Months OPTION Maintain Improved Grounds

FFP

Maintain improved grounds, growing season, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

2003 12 Months OPTION Maintain Irrigation System

FFP

Maintain, operate, and repair irrigation system, in accordance with the

Perforamance Work Statement (PWS) dated 12 August 2016.

2004 12 Months OPTION Remove Debris/Police Grounds

FFP

Remove debris/police grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2005 1 Each OPTION Leaf Removal

FFP

Leaf removal, improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2006 1 Each OPTION Fertilization and Ground Aeration

FFP

Fertilization and ground aeration, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2008 12 Months OPTION Prune Shurbs

FFP

Prune shurbs, hedges, trees and other plants, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

2009 12 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain semi-improved grounds, growing season, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

2010 2 Each OPTION Maintain Runways

FFP

Maintain runways, overruns, shoulders, taxiways, aprons, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

2011 12 Months OPTION Maintain Airfield

FFP

Maintain airfield, growing season, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2013 12 Months OPTION Maintain Un-Improved Grounds

FFP

Maintain un-improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2014 12 Months OPTION Vegetative Beds

FFP

Maintain vegetative beds, inert beds, and related areas, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

2015 12 Months OPTION Maintain Drainage Ditches

FFP

Maintain surface drainage ditches, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2017 270 Each OPTION Trim Palm Trees

FFP

Trim palm trees (excluding cannary island date palm), in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

2018 50 Each OPTION Trim Cannary Island Date Palm Tree

FFP

Trim cannary island date palm trees, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2019 1 Lot OPTION Prune Trees

FFP

Prune trees, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

2020 1 Lot OPTION Emergency Tree Pruning

FFP

Emergency tree pruning, in accordance with the Performance Work Statement

(PWS) dated 12 August 2016.

2021 1 Lot OPTION Tree and Stump Removal, Large

FFP

Tree and stump removal, large, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2022 1 Lot OPTION Tree and Stump Removal, Medium

FFP

Tree and stump removal, medium, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2023 1 Lot OPTION Tree and Stump Removal, Small

FFP

Tree and stump removal, small, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

2025 1 Lot OPTION Stump Removal

FFP

Stump removal, in accordance with the Performance Work Statement (PWS) dated

12 August 2016.

2026 1 Lot OPTION Emerg Tree and Stump Removal, Large

FFP

Emergency tree and stump removal, large, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

2027 1 Lot OPTION Emerg Tree and Stump Removal, Medium

FFP

Emergency tree and stump removal, medium, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

2028 1 Lot OPTION Emerg Tree and Stump Removal, Small

FFP

Emergency tree and stump removal, small in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

2029 1 Lot OPTION Special Cuts

FFP

Special cuts, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

2030 1 Lot OPTION Plant Trees, Shurbs, Vegetative Beds

FFP

Plant trees, shurbs, vegetative beds to conform with xeriscaping, in accordance with the Performance Work Statement (PWS) dated 12 August 2016.

2031 1 Lot OPTION Lawn Renovation/Damaged Grounds

FFP

Lawn renovation/damaged grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3001 12 Months OPTION Maintain Improved Grounds

FFP

Maintain improved grounds, growing season, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

3003 12 Months OPTION Maintain Irrigation System

FFP

Maintain, operate, and repair irrigation system, in accordance with the

Perforamance Work Statement (PWS) dated 12 August 2016.

3004 12 Months OPTION Remove Debris/Police Grounds

FFP

Remove debris/police grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3005 1 Each OPTION Leaf Removal

FFP

Leaf removal, improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3006 1 Each OPTION Fertilization and Ground Aeration

FFP

Fertilization and ground aeration, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3008 12 Months OPTION Prune Shurbs

FFP

Prune shurbs, hedges, trees and other plants, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

3009 12 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain semi-improved grounds, growing season, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

3010 2 Each OPTION Maintain Runways

FFP

Maintain runways, overruns, shoulders, taxiways, aprons, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

3011 12 Months OPTION Maintain Airfield

FFP

Maintain airfield, growing season, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3013 12 Months OPTION Maintain Un-Improved Grounds

FFP

Maintain un-improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3014 12 Months OPTION Vegetative Beds

FFP

Maintain vegetative beds, inert beds, and related areas, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

3015 12 Months OPTION Maintain Drainage Ditches

FFP

Maintain surface drainage ditches, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3017 270 Each OPTION Trim Palm Trees

FFP

Trim palm trees (excluding cannary island date palm), in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

3018 50 Each OPTION Trim Cannary Island Date Palm Tree

FFP

Trim cannary island date palm trees, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3019 1 Lot OPTION Prune Trees

FFP

Prune trees, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

3020 1 Lot OPTION Emergency Tree Pruning

FFP

Emergency tree pruning, in accordance with the Performance Work Statement

(PWS) dated 12 August 2016.

3021 1 Lot OPTION Tree and Stump Removal, Large

FFP

Tree and stump removal, large, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3022 1 Lot OPTION Tree and Stump Removal, Medium

FFP

Tree and stump removal, medium, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3023 1 Lot OPTION Tree and Stump Removal, Small

FFP

Tree and stump removal, small, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

3025 1 Lot OPTION Stump Removal

FFP

Stump removal, in accordance with the Performance Work Statement (PWS) dated

12 August 2016.

3026 1 Lot OPTION Emerg Tree and Stump Removal, Large

FFP

Emergency tree and stump removal, large, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

3027 1 Lot OPTION Emerg Tree and Stump Removal, Medium

FFP

Emergency tree and stump removal, medium, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

3028 1 Lot OPTION Emerg Tree and Stump Removal, Small

FFP

Emergency tree and stump removal, small in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

3029 1 Lot OPTION Special Cuts

FFP

Special cuts, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

3030 1 Lot OPTION Plant Trees, Shurbs, Vegetative Beds

FFP

Plant trees, shurbs, vegetative beds to conform with xeriscaping, in accordance with the Performance Work Statement (PWS) dated 12 August 2016.

3031 1 Lot OPTION Lawn Renovation/Damaged Grounds

FFP

Lawn renovation/damaged grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4001 12 Months OPTION Maintain Improved Grounds

FFP

Maintain improved grounds, growing season, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

4003 12 Months OPTION Maintain Irrigation System

FFP

Maintain, operate, and repair irrigation system, in accordance with the

Perforamance Work Statement (PWS) dated 12 August 2016.

4004 12 Months OPTION Remove Debris/Police Grounds

FFP

Remove debris/police grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4005 1 Each OPTION Leaf Removal

FFP

Leaf removal, improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4006 1 Each OPTION Fertilization and Ground Aeration

FFP

Fertilization and ground aeration, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4008 12 Months OPTION Prune Shurbs

FFP

Prune shurbs, hedges, trees and other plants, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

4009 12 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain semi-improved grounds, growing season, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

4010 2 Each OPTION Maintain Runways

FFP

Maintain runways, overruns, shoulders, taxiways, aprons, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

4011 12 Months OPTION Maintain Airfield

FFP

Maintain airfield, growing season, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4013 12 Months OPTION Maintain Un-Improved Grounds

FFP

Maintain un-improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4014 12 Months OPTION Vegetative Beds

FFP

Maintain vegetative beds, inert beds, and related areas, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

4015 12 Months OPTION Maintain Drainage Ditches

FFP

Maintain surface drainage ditches, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4017 270 Each OPTION Trim Palm Trees

FFP

Trim palm trees (excluding cannary island date palm), in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

4018 50 Each OPTION Trim Cannary Island Date Palm Tree

FFP

Trim cannary island date palm trees, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4019 1 Lot OPTION Prune Trees

FFP

Prune trees, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

4020 1 Lot OPTION Emergency Tree Pruning

FFP

Emergency tree pruning, in accordance with the Performance Work Statement

(PWS) dated 12 August 2016.

4021 1 Lot OPTION Tree and Stump Removal, Large

FFP

Tree and stump removal, large, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4022 1 Lot OPTION Tree and Stump Removal, Medium

FFP

Tree and stump removal, medium, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4023 1 Lot OPTION Tree and Stump Removal, Small

FFP

Tree and stump removal, small, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

4025 1 Lot OPTION Stump Removal

FFP

Stump removal, in accordance with the Performance Work Statement (PWS) dated

12 August 2016.

4026 1 Lot OPTION Emerg Tree and Stump Removal, Large

FFP

Emergency tree and stump removal, large, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

4027 1 Lot OPTION Emerg Tree and Stump Removal, Medium

FFP

Emergency tree and stump removal, medium, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

4028 1 Lot OPTION Emerg Tree and Stump Removal, Small

FFP

Emergency tree and stump removal, small in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

4029 1 Lot OPTION Special Cuts

FFP

Special cuts, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

4030 1 Lot OPTION Plant Trees, Shurbs, Vegetative Beds

FFP

Plant trees, shurbs, vegetative beds to conform with xeriscaping, in accordance with the Performance Work Statement (PWS) dated 12 August 2016.

4031 1 Lot OPTION Lawn Renovation/Damaged Grounds

FFP

Lawn renovation/damaged grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5001 6 Months OPTION Maintain Improved Grounds

FFP

Maintain improved grounds, growing season, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

5003 6 Months OPTION Maintain Irrigation System

FFP

Maintain, operate, and repair irrigation system, in accordance with the

Perforamance Work Statement (PWS) dated 12 August 2016.

5004 6 Months OPTION Remove Debris/Police Grounds

FFP

Remove debris/police grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5005 1 Each OPTION Leaf Removal

FFP

Leaf removal, improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5006 1 Each OPTION Fertilization and Ground Aeration

FFP

Fertilization and ground aeration, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5008 6 Months OPTION Prune Shurbs

FFP

Prune shurbs, hedges, trees and other plants, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

5009 6 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain semi-improved grounds, growing season, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

5010 1 Each OPTION Maintain Runways

FFP

Maintain runways, overruns, shoulders, taxiways, aprons, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

5011 6 Months OPTION Maintain Airfield

FFP

Maintain airfield, growing season, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5013 6 Months OPTION Maintain Un-Improved Grounds

FFP

Maintain un-improved grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5014 6 Months OPTION Vegetative Beds

FFP

Maintain vegetative beds, inert beds, and related areas, in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

5015 6 Months OPTION Maintain Drainage Ditches

FFP

Maintain surface drainage ditches, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5017 135 Each OPTION Trim Palm Trees

FFP

Trim palm trees (excluding cannary island date palm), in accordance with the

Performance Work Statement (PWS) dated 12 August 2016.

5018 25 Each OPTION Trim Cannary Island Date Palm Tree

FFP

Trim cannary island date palm trees, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5019 1 Lot OPTION Prune Trees

FFP

Prune trees, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

5020 1 Lot OPTION Emergency Tree Pruning

FFP

Emergency tree pruning, in accordance with the Performance Work Statement

(PWS) dated 12 August 2016.

5021 1 Lot OPTION Tree and Stump Removal, Large

FFP

Tree and stump removal, large, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5022 1 Lot OPTION Tree and Stump Removal, Medium

FFP

Tree and stump removal, medium, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5023 1 Lot OPTION Tree and Stump Removal, Small

FFP

Tree and stump removal, small, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

5025 1 Lot OPTION Stump Removal

FFP

Stump removal, in accordance with the Performance Work Statement (PWS) dated

12 August 2016.

5026 1 Lot OPTION Emerg Tree and Stump Removal, Large

FFP

Emergency tree and stump removal, large, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

5027 1 Lot OPTION Emerg Tree and Stump Removal, Medium

FFP

Emergency tree and stump removal, medium, in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

5028 1 Lot OPTION Emerg Tree and Stump Removal, Small

FFP

Emergency tree and stump removal, small in accordance with the Performance

Work Statement (PWS) dated 12 August 2016.

5029 1 Lot OPTION Special Cuts

FFP

Special cuts, in accordance with the Performance Work Statement (PWS) dated 12

August 2016.

5030 1 Lot OPTION Plant Trees, Shurbs, Vegetative Beds

FFP

Plant trees, shurbs, vegetative beds to conform with xeriscaping, in accordance with the Performance Work Statement (PWS) dated 12 August 2016.

5031 1 Lot OPTION Lawn Renovation/Damaged Grounds

FFP

Lawn renovation/damaged grounds, in accordance with the Performance Work

Statement (PWS) dated 12 August 2016.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0008 Destination Government Destination Government

0009 Destination Government Destination Government

0010 Destination Government Destination Government

0011 Destination Government Destination Government

0013 Destination Government Destination Government

0014 Destination Government Destination Government

0015 Destination Government Destination Government

0017 Destination Government Destination Government

0018 Destination Government Destination Government

0019 Destination Government Destination Government

0020 Destination Government Destination Government

0021 Destination Government Destination Government

0022 Destination Government Destination Government

0023 Destination Government Destination Government

0025 Destination Government Destination Government

0026 Destination Government Destination Government

0027 Destination Government Destination Government

0028 Destination Government Destination Government

0029 Destination Government Destination Government

0030 Destination Government Destination Government

0031 Destination Government Destination Government

0032 Destination Government Destination Government

1001 Destination Government Destination Government

1003 Destination Government Destination Government

1004 Destination Government Destination Government

1005 Destination Government Destination Government

1006 Destination Government Destination Government

1008 Destination Government Destination Government

1009 Destination Government Destination Government

1010 Destination Government Destination Government

1011 Destination Government Destination Government

1013 Destination Government Destination Government

1014 Destination Government Destination Government

1015 Destination Government Destination Government

1017 Destination Government Destination Government

1018 Destination Government Destination Government

1019 Destination Government Destination Government

1020 Destination Government Destination Government

1021 Destination Government Destination Government

1022 Destination Government Destination Government

1023 Destination Government Destination Government

1025 Destination Government Destination Government

1026 Destination Government Destination Government

1027 Destination Government Destination Government

1028 Destination Government Destination Government

1029 Destination Government Destination Government

1030 Destination Government Destination Government

1031 Destination Government Destination Government

2001 Destination Government Destination Government

2003 Destination Government Destination Government

2004 Destination Government Destination Government

2005 Destination Government Destination Government

2006 Destination Government Destination Government

2008 Destination Government Destination Government

2009 Destination Government Destination Government

2010 Destination Government Destination Government

2011 Destination Government Destination Government

2013 Destination Government Destination Government

2014 Destination Government Destination Government

2015 Destination Government Destination Government

2017 Destination Government Destination Government

2018 Destination Government Destination Government

2019 Destination Government Destination Government

2020 Destination Government Destination Government

2021 Destination Government Destination Government

2022 Destination Government Destination Government

2023 Destination Government Destination Government

2025 Destination Government Destination Government

2026 Destination Government Destination Government

2027 Destination Government Destination Government

2028 Destination Government Destination Government

2029 Destination Government Destination Government

2030 Destination Government Destination Government

2031 Destination Government Destination Government

3001 Destination Government Destination Government

3003 Destination Government Destination Government

3004 Destination Government Destination Government

3005 Destination Government Destination Government

3006 Destination Government Destination Government

3008 Destination Government Destination Government

3009 Destination Government Destination Government

3010 Destination Government Destination Government

3011 Destination Government Destination Government

3013 Destination Government Destination Government

3014 Destination Government Destination Government

3015 Destination Government Destination Government

3017 Destination Government Destination Government

3018 Destination Government Destination Government

3019 Destination Government Destination Government

3020 Destination Government Destination Government

3021 Destination Government Destination Government

3022 Destination Government Destination Government

3023 Destination Government Destination Government

3025 Destination Government Destination Government

3026 Destination Government Destination Government

3027 Destination Government Destination Government

3028 Destination Government Destination Government

3029 Destination Government Destination Government

3030 Destination Government Destination Government

3031 Destination Government Destination Government

4001 Destination Government Destination Government

4003 Destination Government Destination Government

4004 Destination Government Destination Government

4005 Destination Government Destination Government

4006 Destination Government Destination Government

4008 Destination Government Destination Government

4009 Destination Government Destination Government

4010 Destination Government Destination Government

4011 Destination Government Destination Government

4013 Destination Government Destination Government

4014 Destination Government Destination Government

4015 Destination Government Destination Government

4017 Destination Government Destination Government

4018 Destination Government Destination Government

4019 Destination Government Destination Government

4020 Destination Government Destination Government

4021 Destination Government Destination Government

4022 Destination Government Destination Government

4023 Destination Government Destination Government

4025 Destination Government Destination Government

4026 Destination Government Destination Government

4027 Destination Government Destination Government

4028 Destination Government Destination Government

4029 Destination Government Destination Government

4030 Destination Government Destination Government

4031 Destination Government Destination Government

5001 Destination Government Destination Government

5003 Destination Government Destination Government

5004 Destination Government Destination Government

5005 Destination Government Destination Government

5006 Destination Government Destination Government

5008 Destination Government Destination Government

5009 Destination Government Destination Government

5010 Destination Government Destination Government

5011 Destination Government Destination Government

5013 Destination Government Destination Government

5014 Destination Government Destination Government

5015 Destination Government Destination Government

5017 Destination Government Destination Government

5018 Destination Government Destination Government

5019 Destination Government Destination Government

5020 Destination Government Destination Government

5021 Destination Government Destination Government

5022 Destination Government Destination Government

5023 Destination Government Destination Government

5025 Destination Government Destination Government

5026 Destination Government Destination Government

5027 Destination Government Destination Government

5028 Destination Government Destination Government

5029 Destination Government Destination Government

5030 Destination Government Destination Government

5031 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 07-SEP-2017 TO

06-SEP-2018

N/A 452 MSG/CECC (F5F3CM)

DAVID ALEXANDER

610 MEYER DRIVE

BLDG 2403

MARCH ARB CA 92518-2166

(951) 655-5983

F5F3CM

0003 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0019 POP 07-SEP-2017 TO

09-SEP-2018

N/A (SAME AS PREVIOUS LOCATION)

0020 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0021 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0022 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0023 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0025 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0026 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0027 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0028 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0029 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0030 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0031 POP 07-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0032 POP 08-AUG-2017 TO

06-SEP-2017

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 07-SEP-2018 TO

06-SEP-2019

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1017 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1018 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1019 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1020 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1021 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1022 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1023 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1025 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1026 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1027 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1028 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1029 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1030 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1031 POP 07-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 07-SEP-2019 TO

06-SEP-2020

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2010 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2011 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2013 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2014 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2015 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2017 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2018 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2019 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2020 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2021 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2022 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2023 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2025 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2026 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2027 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2028 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2029 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2030 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2031 POP 07-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 07-SEP-2020 TO

06-SEP-2021

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3008 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3009 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3010 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3011 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3013 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3014 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3015 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3017 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3018 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3019 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3020 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3021 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3022 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3023 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3025 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3026 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3027 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3028 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3029 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3030 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3031 POP 07-SEP-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 07-SEP-2021 TO

06-SEP-2022

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4008 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4009 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4010 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4011 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4013 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4014 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4015 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4017 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4018 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4019 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4020 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4021 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4022 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4023 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4025 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4026 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4027 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4028 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4029 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4030 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4031 POP 07-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

5001 POP 07-SEP-2022 TO

06-MAR-2023

N/A (SAME AS PREVIOUS LOCATION)

5003 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5004 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5005 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5006 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5008 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5009 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5010 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5011 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5013 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5014 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5015 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5017 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5018 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5019 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5020 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5021 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5022 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5023 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5025 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5026 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5027 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5028 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5029 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5030 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

5031 POP 07-SEP-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984

52.203-6 Alt I Restrictions On Subcontractor Sales To The Government

(Sep 2006) -- Alternate I

OCT 1995

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2016

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.209-2 Prohibition on Contracting with Inverted Domestic

Corporations--Representation

NOV 2015

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

JUL 2013

52.212-1 Instructions to Offerors--Commercial Items OCT 2016

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015

52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-13 Notice of Set-Aside of Orders NOV 2011

52.219-14 Limitations On Subcontracting NOV 2011

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013

52.222-3 Convict Labor JUN 2003

52.222-17 Nondisplacement of Qualified Workers MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015

52.222-26 Equal Opportunity SEP 2016

52.222-35 Equal Opportunity for Veterans OCT 2015

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014

52.222-37 Employment Reports on Veterans FEB 2016

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards MAY 2014

52.222-43 Fair Labor Standards Act And Service Contract Labor

Standards - Price Adjustment (Multiple Year And Option

Contracts)

MAY 2014

52.223-1 Biobased Product Certification MAY 2012

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-4 Recovered Material Certification MAY 2008

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7004 Display of Hotline Posters OCT 2016

252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7011 Alternative Line Item Structure SEP 2011

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of

Terrorism

OCT 2015

252.215-7008 Only One Offer OCT 2013

252.219-7003 Small Business Subcontracting Plan (DOD Contracts)--Basic MAR 2016

252.219-7011 Notification to Delay Performance JUN 1998

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Dec 2016)

DEC 2016

252.225-7012 Preference For Certain Domestic Commodities DEC 2016

252.225-7021 Trade Agreements--Basic DEC 2016

252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business

Concerns

SEP 2004

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.232-7011 Payments in Support of Emergencies and Contingency

Operations

MAY 2013

252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment DEC 2012

252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

(a) Definitions. As used in this provision--

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian

Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a

Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means--

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than

$10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the

Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in--

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management database via https://www.acquisition.gov (see 52.204-7).

(End of provision)

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .