FA4664-15-R-0013_0003.doc

DOC document 42 KB Posted

Attached to
Repair Anti Terrorism Force Protection Building 470 at March ARB CA
Solicitation number
FA4664-15-R-0013
Issued by

About this file

SF30 - Amendment 0003

View the file

Other files

File Type Posted
Atch_8_-_Q A_No._19_picture_2.jpg JPG image
Atch_1_-_General_Decision_07-31-15.doc DOC document
Atch_8_-_Q A.doc DOC document
Atch_8_-_Q A_No._15_drawing.pdf PDF
Atch_8_-_Q A_No._19_picture_1.jpg JPG image
Questions_and_Answers.pdf PDF
FA4664-15-R-0013_Amendment_0002.doc DOC document
Site_Walk_Notes.pdf PDF
FA4664-15-R-0013_Amendment_0001.doc DOC document
Atch_1_-_General_Decision_7-10-15.doc DOC document
Atch_6_-_FEP_March_ARB_10-03-2014.doc DOC document
Atch_7_-_Security_Pamphlet_-_1_October_2014.doc DOC document
Atch_3_-_Drawings.pdf PDF
Atch_1_-_General_Decision_Number_-_6-19-15.doc DOC document
FA4664-15-R-0013.doc DOC document
Atch_5_-_Design_Analysis.pdf PDF
Atch_2_-_SOW.doc DOC document
Atch_4__-_Specs.doc DOC document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 11-Aug-2015 02:00 PM to 18-Aug-2015 02:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

No.

Description

Pages

1 General Wage Decision CA150036 dated 06/19/2015 07/10/2015 07/31/2015

2 Statement of Work for Construction of Anti Terrorism Force Protection

Building 470 Wing Headquarters dated 1 May 2015

3 Drawings

4 Specifications

01 33 00 Submittal Procedures

01 45 00.10 10 Quality Control Systems

01 78 23 Operation and Maintenance Data

02 41 00 Demolition

03 30 00 Cast- in-Place Concrete

05 50 13 Miscellaneous Metal Fabrications

05 52 00 Metal Railings

07 14 16 Fluid-Applied Waterproofing

09 90 00 Paints and Coatings

10 14 01 Exterior Signage

26 00 00.00 20 Basic Electrical materials and Methods

31 00 00 Earthwork

31 11 00 Clearing and Grubbing

31 11 16 Base Course for Rigid Paving

32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Fac.

32 16 13 Concrete Sidewalks and Curbs and Gutters

32 84 24 Irrigation Sprinkler System

32 92 19 Seeding

32 93 00 Exterior Plants

33 32 00 Groundwater Pumping Stations

5 Design Analysis dated 17 April 2015

6 Draft Facility Excellence Plan dated 3 October 2014

7 Security Forces Requirements for Prime/Sub-Contractor

Representatives Pamphlet dated 1 October 2014

Questions and Answers, 7 August 2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .