Atch_3_-_Design_Submittals_Schedule.xls
XLS spreadsheet 39 KB Posted
- Solicitation number
- FA4664-15-R-0010
About this file
Attachment 3 - Design Submittals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA4664-15-R-0010_Amendment_0002.doc | DOC document | |
| Atch_1_-_Wage_Decision_8-14-15.doc | DOC document | |
| FA4664-15-R-0010_0001.doc | DOC document | |
| Site_Walk_Notes.pdf | ||
| Atch_7_-_Security_Pamphlet_-_1_October_2014.doc | DOC document | |
| Atch_1_-_General_Decision_7-10-15.doc | DOC document | |
| Atch_4_-_FEP_March_ARB_10-03-2014.zip | ZIP file | |
| Atch_5_-_Asbuilts_Bldg_2245.zip | ZIP file | |
| Atch_2_-_SOW_5_Jun_15.doc | DOC document | |
| FA4664-15-R-0010.doc | DOC document | |
| Atch_6_-_Asbuilts_Bldg_2246.zip | ZIP file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS (DESIGN SUBMITTALS ONLY) | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NUMBER | ||||||||||||||||
| PDPG14-0118 & 14-0120 | Repair ECM | FA4664-15-R-0010 | |||||||||||||||||
| EM = E-Mail CD = CD or DVD HC = Hard Copy of analysis/specifications FS = Full size hard copy drawings HS = Half size hard copy drawings OB = Originals Bound | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||
| Submittal Number | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | EM | CD | HC | FS | HS | OB | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||
| NUMBER OF COPIES REQUIRED | APPROVED | DIS-APPROVED | |||||||||||||||||
| Notice to Proceed (NTP) | Start | ||||||||||||||||||
| 1 | Meeting Minutes (Kick-off Meeting) SOW Section(s) 2.2 | 1 | As Required | ||||||||||||||||
| 2 | 35% Design SOW Section(s) 3.1.2.1 | 3 | 2 | 2 | 2 | 2 | + | 21 | |||||||||||
| 3 | 35% Design Review Comments SOW Section(s) 3.1.2.1 | 1 | + | 14 | |||||||||||||||
| 4 | 35% Comment Responses SOW Section(s) 3.1.2.1 | + | 3 | ||||||||||||||||
| 5 | 35% Design Review Meeting SOW Section(s) 3.1.2.1 | 1 | + | 3 | |||||||||||||||
| 6 | 65% Design SOW Section(s) 3.1.2.2 | 3 | 2 | 2 | 2 | 2 | + | 14 | |||||||||||
| 7 | 65% Design Review Comments SOW Section(s) 3.1.2.2 | 1 | + | 14 | |||||||||||||||
| 8 | 65% Comment Responses SOW Section(s) 3.1.2.2 | + | 3 | ||||||||||||||||
| 9 | 65% Design Review Meeting SOW Section(s) 3.1.2.2 | 1 | + | 3 | |||||||||||||||
| 14 | 95% Design SOW Section(s) 3.1.2.3 | 3 | 2 | 2 | 2 | 2 | + | 14 | |||||||||||
| 15 | 95% Design Review Comments SOW Section(s) 3.1.2.3 | 1 | + | 14 | |||||||||||||||
| 16 | 95% Comment Responses SOW Section(s) 3.2.2.4 | + | 3 | Attachment 3 to |
FA4664-15-R-0010
| 17 | 95% Design Review Meeting SOW Section(s) 3.1.2.3 | 1 | + | 3 | |||||
| 18 | 100% Design Submittal SOW Section(s) 3.1.2.4 | 3 | 2 | 2 | 2 | 2 | + | 3 | |
| 19 | Meeting Minutes (General Meetings) SOW Section(s) 2.2 | 1 | As Needed |
&R&8Page &P of &N
Sheet2
Sheet3
File details come from the government source that posted it. Updated .