FA4664-13-R-0006_-_Atch_2_SOW_Low_NOx_Heating_System_9_May_2013.doc

DOC document 55 KB Posted

Attached to
Repair Paint Booth Heater Building 2312 at March ARB CA
Solicitation number
FA4664-13-R-0006
Issued by

About this file

Attachment 2 - SOW

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 to

FA4664-13-R-0006

Air Force Reserve Command

March Air Reserve Base

Riverside, California

STATEMENT OF WORK

Replace burner at paint booth 2312 March arb, ca March Project Number: PDPG 13-0114 Prepared By

452 MSG/CECC

9 May 2013

1. INTRODUCTION

1.1. The Contractor shall provide all materials, equipment, labor and supervision necessary for the Repair of the Paint Booth Heater in Bldg. 2312 so as to be in Code Compliance of SCAQMD rule #1147 at March Air Reserve Base, California in accordance with the terms and conditions of the contract, contract statement of work, federal, state and local codes, laws and regulations.

1.2. Work shall include, but is not limited to the following:

2. SCOPE

2.1. Replace existing paint booth burner with an LNB 1000 series low NOx burner or equal for the paint booth at building 2312.

3. REQUIREMENTS

3.1. Replacement needs to meet South Coast Air Quality Management District (SCAQMD) Rule 1147.

3.2. Replacement needs to maintain an environmentally controlled paint booth at a range of 30 to 80 percent relative humidity and 60 F to 90 F.

3.3. Contractor shall perform any and all testing requirements that satisfy SCAQMD Rule 1147, which will include a NOx Emission Limit Test certifying to meet the emission limit while fueled with natural gas according to Table 1 – NOx Emission Limit, Rule 1147.

3.4. Contractor will be required to get any and all permits from SCAQMD.

3.5. Contractor is responsible for all gas connections needed to install and operate new burner.

3.6. Contractor is responsible for all wire, conduit and fittings to install and operate new burner.

4. GENERAL WORKSITE

4.1. In accordance with FAR 52.236-3 Site Investigation and Conditions Affecting the Work, the Contractor shall take all steps reasonably necessary to ascertain the nature of the work.

4.2. Contactor shall prepare a recycling report for all construction debris and for all recycled debris removed off March ARB during the course of this project. Report must include name and address of the receiving facility, tonnage and type of material disposed and recycled, if applicable. Report shall be provided to the Contracting Officer monthly and total quantities at the final inspection.

4.3. The Contractor shall conform to all base regulations and directives pertaining to security, safety, fire, traffic, and personnel clearance, insofar as they pertain to the Contractors activities on March ARB, California. The Contractor shall ensure conformance by all employees and subcontractors.

4.4. Contractor shall not order any equipment or materials and shall not begin any phase of construction until Government provides a Notice to Proceed (NTP).

4.5. In accordance with FAR 52.236-6 Superintendence by the Contractor, the Contractor shall have an authorized representative with decision making authority at the site at all times when there are workers on site or when deliveries are to be received. The representative shall be designated as such and approved by the Government Contracting Officer.

4.6. Pre-Final Inspection: The Contractor shall request a pre-final inspection with the Government Inspector. The pre-final shall be requested with sufficient performance days remaining on contract to allow for punch list item corrections and a final inspection completion within the contract performance period. The Contractor shall provide a draft DD Form 1354, Transfer and Acceptance of Real Property to the Contracting Officer for review. The Contractor shall include all O&M manuals, operating instructions, and test reports for review. The Contractor shall provide training to base personnel by manufacturer’s representatives for all HVAC equipment, control systems, and other major equipment/systems.

4.7. Final Inspection: The Contractor shall request a final inspection, in writing, with the Contracting Officer upon correction of pre-final punch list items. Final inspection shall be requested within the contract performance period.

4.8. The Contractor shall prepare a pass information sheet identifying all employees, including subcontractor employees, who will be working on March ARB. Upon completion of the contract or expiration of the passes, the Contractor shall ensure that all passes issued to employees and subcontractor employees are returned to security. Failure to comply with this requirement may result in withholding of final payment.

4.9. The Contractor shall obtain permits for work associated with hot work, welding, cutting, and brazing from the March Air Reserve Base Fire Department prior to any such work. Allow 7 days for processing of permits.

5. DELIVERABLES

5.1. The Contractor shall submit to the Contracting Officer all material submittals as identified in the contract schedule of material submittals. All submittals shall be submitted in the quantities identified on the contract schedule of materials and shall include an AF Form 3000 Material Approval Submittal. Upon approval/disapproval of the submittal a copy of the signed AF Form 3000 will be provided to the Contractor.

5.2. Contractor shall be responsible for attaining all permits and fees for the installation of the Low NOx Heating System or equivalent. The Low NOx System must be certified and meet the current Emission standards for South Coast Air Quality Management District (SCAQMD) and CARB/EPA. Note: Installation of burner will not be allowed on March ARB until all permits and fees have been completed, documented and received by SCAQMD. Contact Contracting Office for advice on completing the permit.

5.3. Contract Progress Schedule (AF Form 3064): Within 10 days after contract award or at the pre-construction conference, whichever is later, the Contractor shall submit a signed AF Form 3064, Contract Progress Schedule, depicting an overall contract progress schedule for the main elements of work for the period of performance for approval by the Contracting Officer. Once approved the contract progress schedule may only be changed by the Contracting Officer.

5.4. Contract Progress Report (AF Form 3065): At least monthly, the Contractor shall submit AF Form 3065, Contract Progress Report, signed by the Contractor’s on-site representative. The work elements and percentages for each element stated on the AF 3065 shall be identical to the work elements and percentages on the AF 3064.

5.5. Transfer and Acceptance of Real Property (DD Form 1354): Contractor shall provide the final copy to the Contracting Officer, only after as builds and final payment has been approved.

6. CONTRACT ADMINISTRATION

6.1. The Contracting Officer will be the only individual authorized to amend or modify the terms of this contract.

7. PERFORMANCE

7.1. The performance period for this contract is 60 calendar days. The Contractor shall begin work as described in the scope of work within 10 days of receiving a Notice-To-Proceed (NTP). All work, including any punch list items, must be completed no later than 60 calendar days after receipt of an NTP.