QUESTIONS AND ANSWERS 2.pdf
PDF 74 KB Posted
- Attached to
- DFAC Serving Line Equipment
- Solicitation number
- FA466124Q0151
About this file
This document is a set of Questions and Answers related to a federal contract opportunity for DFAC Serving Line Equipment. The key details are:
The contract opportunity is a Request for Quote (RFQ) for Firm-Fixed Price (FFP) contract to provide DFAC serving line equipment. It has a socio-economic set-aside for small disadvantaged businesses and/or SBA certified woman-owned small businesses. An optional site visit will be scheduled, and interested contractors must RSVP. Quotes are due by 28 August 2024, 10:00 a.m. (CST) and should be submitted via email. The evaluation will be based on best value for technically acceptable items. The contracting agency is the Department of the Air Force Global Strike Command.
The Questions and Answers cover details such as equipment specifications, utility requirements, storage locations, installation timelines, and other logistical considerations. Several responses indicate the need to coordinate with the Contracting Officer and Civil Engineering for additional information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ COMBO v3.docx | DOCX document | |
| Attachment 4- DFAC Serving Line specs V3.pdf | ||
| Attachment 4- DFAC Serving Line specs v2.docx | DOCX document | |
| Attachment 3- Floor Plan v2.xlsx | XLSX spreadsheet | |
| RFQ COMBO v2.docx | DOCX document | |
| Attachment 5- SOO - DFAC Serving Line.docx | DOCX document | |
| Site Visit Questions and Answers (updated).pdf | ||
| RFQ COMBO.docx | DOCX document | |
| Attachment 1- FA466124Q0150 Provisions and Clauses (1).pdf | ||
| Attachment 2- FA466124Q0150 FAR 52.212-5 (1).pdf | ||
| Attachment 3- Floor Plan.pdf | ||
| RFQ COMBO.docx | DOCX document | |
| Attachment 4- DFAC Serving Line specs (1).pdf | ||
| Attachment 5- SOO - DFAC Serving Line (1).pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS 2
1. Does the salad bar require a drop-in plate freezer?
Drop in plate chiller.
2. Where are the load centers to be located?
Outside of my knowledge, Getting with CE. Only preference is that is easy to access if work on equipment is needed.
3. Does a “deli refrigerator top” refer to a frigerated shelf OR a roll-in prep unit?
Roll-in. I think it’s line 024 in spec sheet
4. Where are utility outlets required on the line-up?
Near any standalone equipment or flat surface. More the better.
5. Do both griddles require a refrigerated base?
yes lines 019 / 020
6. Referencing the floor plan – the rectangular piece that is labeled by 4x20 amps…
With moving the dessert and freezer in the “U” area, that’s going to be a flat surface with power drops holes as we will use it odds and ends.
7. Regarding “pizza warmer area” is that to be a heated shelf? Single or double tier?
Since we have the room, I was thinking we can keep what we currently have and make it two heated singles side by side. Top and bottom heat.
8. Where will the load centers be located?
Please call out specific locations for each counter. Outside of my knowledge, Getting with
CE
9. What are the sizes (capacity) of the soup wells?
11 Qt
10. Are all the wells to quick switch hot/cold? Will they all need to be waterless as well?
Only ones that don’t need to be hot/cold is Salad bar. All dry wells.
11. Where are utensils to be stored?
Condiment counter
12. Where are plates and trays to be stored?
Plates on the dispenser. They will be at the end of the counters. Trays we want cubbies in the counter on customer side.
13. The piece specified “countertop space/or cart for plates and tray” – will this be countertop space OR do we need to build it with a cart leaving a gap between the counters?
So we would like the roll in dish dispenser line 032, then a floating shelf or if the depth is enough, counter space so we can fit to-go tray on it.
14. Need details on specs for “omlet bar” – is that a refrigerated prep unit rolled in?
roll-in, either line 023 or 025. I cant remember that size available. If both area can fit 48 inch we will go with that, if not biggest we can fit.
15. The current written specs (in the attachment breaking down line items) do not match the current floor plan at all. Will these revised/re-written to match? Example: Dessert bar is still called out as a counter “Approx. 108" L. X 55" W.”, while the floor plan has it integral to the “U” shaped main counter.
Yes line 005 should be just counter. As dessert is merged with 001. This was pointed out in question 6.
16. Where is the storage location for the unit being removed?
(loading dock of building 6132, there is a storage area off the dock
17. What are the exact dead times between meal service?
We are open for grab and go options between meals. Meal hours are 0600-0900/1030- 1330/1630-1830
18. What is the proposed date of substantial completion?
The quickest they can do it. We don’t want to have to wait for over 6 months if possible.
19. “The Contractor shall provide a layout plan that the longhorn dining facility management agrees on before construction can start” Is this referencing shop/submittal drawings for the equipment being replaced or CAD drawings for entire facility?
Anything so we can understand what items go where and how it will look.
20. Will the installation team be required to provide an on-site dumpster for the debris from install/removal?
yes
21. The normal hours of operation are stated with the notation that work may be performed out of those with prior agreement – considering the scope of the project has weekend work been pre-approved for this project?
As long as it doesn’t change cost, we have personnel here on the weekend. Hours for weekend is slightly less.
22. Has the total amperage load been calculated for the revised floor plan? Will the project require electrical upgrades? Have those been pre-approved?
Per contracting we were told no electrical work. Amperage was provided by CE based off of current draw.
23. Is the estimated 14 day to completion timeline a true timeline? It may take longer than 14 days if we have to work around the operation hours.
Timeframe was a estimate.
24. Based on the answers to all the questions, extra time to prepare this bid will be needed. Will you be extending the bid deadline?
No. Due to end of year timeline