6 Pricing Worksheet (SOW att G).xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Dyess AFB MACC Federal contract opportunity
- Solicitation number
- FA4661-20-R-0001
About this file
This document contains a pricing worksheet and related federal contract opportunity notice. The pricing worksheet is a template for contractors to provide labor, material, equipment, and subcontract pricing by construction division for renovating building 6030A and B at Dyess Air Force Base in Texas, including relocating and storing furniture during construction. The total proposed construction cost is $4. The related federal contract opportunity is a pre-solicitation notice for an upcoming multiple award construction contract at Dyess AFB with a ceiling of $150 million over a seven-year period including two one-year options. The initial task order is expected to be between $1-5 million for repairs to building 6030. The 100% small business set-aside solicitation will be issued on or around February 28, 2020 by the Department of the Air Force Global Strike Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 11 Site Visit Registration Form.doc | DOC document | |
| 7 FACTS Sheet.docx | DOCX document | |
| 8 PPQ.docx | DOCX document | |
| 1 MACC solicitation sections F-H.docx | DOCX document | |
| 10 Subcontractor Consent Form.doc | DOC document | |
| 12 Question Submission Form.doc | DOC document | |
| 3 MACC Blanket Special Conditions.pdf | ||
| 4 Seed Project SOW Bldg 6030 v3.pdf | ||
| 5 WD 18 Feb.pdf | ||
| 0 Solicitation - FA466120R0001.pdf | ||
| 9 Financial Reference Sheet.docx | DOCX document | |
| 2 MACC solicitation sections L and M.docx | DOCX document | |
| MACC Synopsis memo.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT 6 | DRAFT DOCUMENT | |||||||||||
| PRICE BREAKDOWN BY DIVISION | Contractor: | |||||||||||
| Date: | ||||||||||||
| Dyess AFB, TX | Note: Due no later than 2 hours after official bid time. | |||||||||||
| FNWZ 13-0068 | Color Legend: | Formula Areas | Gov't Numbers | |||||||||
| Division Line Items Include the Items Below: | ||||||||||||
| 0001 Base Pricing, Item 1 – Renovate 6030A & B | CONTRACTOR BID | GOVERNMENT ESTIMATE | Division 1: typically bonds, general liability, builders risk, O&P | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | Notes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc. | |||
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) | Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage, |
bulletin board, plan sets, temporary fencing, cleanup, etc.
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc. | |
| Division 3 - Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor | |
| Division 4 - Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 4: masonry, grout, labor | |
| Division 5 - Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control | |
| Division 6 - Woods & Plastic | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 6: rough & finish carpentry, casework | |
| Division 7 - Thermal/Moisture | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers | |
| Division 8 - Doors & Windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing | |
| 9 | Division 9 - Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings |
| Division 10 - Miscellaneous Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage | |
| Division 11 - Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 11: loading dock equipment, residential equipment | |
| Division 12 - Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 12: manufactured casework | |
| Division 13 - Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control, | |
| Division 15 - Plumbing & HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing | |
| Division 16 - Electrical, Communication, & Fire Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications | |
| 100.00% | ERROR:#DIV/0! | ||||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||||
| 0001 Base Pricing, Item 1 – Renovate 6030A & B Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0002 Base Pricing, Item 2 - Furniture Relocation, Storage during construction and reinstallation | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0002 Base Pricing, Item 2 - Furniture Relocation, Storage during construction and reinstallation Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0003 Pricing Option, Item 3 - Lightning Protect System | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| Division 13 - Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0003 Pricing Option, Item 3 - Lightning Protect System Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0004 Pricing Option, Item 4 - Photo-Voltaic System | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| Division 16 - Electrical, Communication, & Fire Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0004 Pricing Option, Item 4 - Photo-Voltaic System Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
Total Construction Cost: $ 4.00 $ - 0
File details come from the government source that posted it. Updated .