This document contains a pricing worksheet and related federal contract opportunity notice. The pricing worksheet is a template for contractors to provide labor, material, equipment, and subcontract pricing by construction division for renovating building 6030A and B at Dyess Air Force Base in Texas, including relocating and storing furniture during construction. The total proposed construction cost is $4. The related federal contract opportunity is a pre-solicitation notice for an upcoming multiple award construction contract at Dyess AFB with a ceiling of $150 million over a seven-year period including two one-year options. The initial task order is expected to be between $1-5 million for repairs to building 6030. The 100% small business set-aside solicitation will be issued on or around February 28, 2020 by the Department of the Air Force Global Strike Command.

View the file

Other files for this federal contract opportunity

Other files attached to Dyess AFB MACC, newest first.
File Type Posted
11 Site Visit Registration Form.doc DOC document
7 FACTS Sheet.docx DOCX document
8 PPQ.docx DOCX document
1 MACC solicitation sections F-H.docx DOCX document
10 Subcontractor Consent Form.doc DOC document
12 Question Submission Form.doc DOC document
3 MACC Blanket Special Conditions.pdf PDF
4 Seed Project SOW Bldg 6030 v3.pdf PDF
5 WD 18 Feb.pdf PDF
0 Solicitation - FA466120R0001.pdf PDF
9 Financial Reference Sheet.docx DOCX document
2 MACC solicitation sections L and M.docx DOCX document
MACC Synopsis memo.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT 6DRAFT DOCUMENT
PRICE BREAKDOWN BY DIVISIONContractor:
Date:
Dyess AFB, TXNote: Due no later than 2 hours after official bid time.
FNWZ 13-0068Color Legend:Formula AreasGov't Numbers
Division Line Items Include the Items Below:
0001 Base Pricing, Item 1 – Renovate 6030A & BCONTRACTOR BIDGOVERNMENT ESTIMATEDivision 1: typically bonds, general liability, builders risk, O&P
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL% of EstIGE% of BidDifferenceNotes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc.
Division 1 - General Conditions$ 1.00$ - 0$ - 0$ - 0$ 1.00100.00%$ - 0ERROR:#DIV/0!$ (1.00)Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage,

bulletin board, plan sets, temporary fencing, cleanup, etc.

Division 2 - Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc.
Division 3 - Concrete$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor
Division 4 - Masonry$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 4: masonry, grout, labor
Division 5 - Metals$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control
Division 6 - Woods & Plastic$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 6: rough & finish carpentry, casework
Division 7 - Thermal/Moisture$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers
Division 8 - Doors & Windows$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing
9Division 9 - Finishes$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings
Division 10 - Miscellaneous Specialties$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage
Division 11 - Equipment$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 11: loading dock equipment, residential equipment
Division 12 - Furnishings$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 12: manufactured casework
Division 13 - Special Construction$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control,
Division 15 - Plumbing & HVAC$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing
Division 16 - Electrical, Communication, & Fire Alarm$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications
100.00%ERROR:#DIV/0!
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL
0001 Base Pricing, Item 1 – Renovate 6030A & B Totals:1.000.000.000.00$ 1.00$ - 0$ (1.00)
0002 Base Pricing, Item 2 - Furniture Relocation, Storage during construction and reinstallation
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL% of EstIGE% of BidDifference
Division 1 - General Conditions$ 1.00$ - 0$ - 0$ - 0$ 1.00100.00%$ - 0ERROR:#DIV/0!$ (1.00)
100.00%ERROR:#DIV/0!
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL
0002 Base Pricing, Item 2 - Furniture Relocation, Storage during construction and reinstallation Totals:1.000.000.000.00$ 1.00$ - 0$ (1.00)
0003 Pricing Option, Item 3 - Lightning Protect System
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL% of EstIGE% of BidDifference
Division 1 - General Conditions$ 1.00$ - 0$ - 0$ - 0$ 1.00100.00%$ - 0ERROR:#DIV/0!$ (1.00)
Division 2 - Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0
Division 13 - Special Construction$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0
100.00%ERROR:#DIV/0!
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL
0003 Pricing Option, Item 3 - Lightning Protect System Totals:1.000.000.000.00$ 1.00$ - 0$ (1.00)
0004 Pricing Option, Item 4 - Photo-Voltaic System
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL% of EstIGE% of BidDifference
Division 1 - General Conditions$ 1.00$ - 0$ - 0$ - 0$ 1.00100.00%$ - 0ERROR:#DIV/0!$ (1.00)
Division 2 - Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0
Division 16 - Electrical, Communication, & Fire Alarm$ - 0$ - 0$ - 0$ - 0$ - 00.00%$ - 0ERROR:#DIV/0!$ - 0
100.00%ERROR:#DIV/0!
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL
0004 Pricing Option, Item 4 - Photo-Voltaic System Totals:1.000.000.000.00$ 1.00$ - 0$ (1.00)

Total Construction Cost: $ 4.00 $ - 0