Appendix C Serenity Gardens Site Plan.ppt

PPT presentation 9 MB Posted

Attached to
Serenity Garden Demolition Federal contract opportunity
Solicitation number
FA4661-12-T-0055
Issued by
Department of the Air Force Air Combat Command

About this file

These are the Appendixes referred to in the PWS.

View the file

Other files for this federal contract opportunity

Other files attached to Serenity Garden Demolition, newest first.
File Type Posted
Appendix B Bed and Rock Garden Site Plan.ppt PPT presentation
Solicitation for Serenity Garden Demo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix C

SERENITY GARDEN

Remove all rose bushes around memorial and repair bed.

REMOVE DEAD BUSHES/TREES AROUND FOUNTAIN AREA.

2. Repair bed and add rock as needed.

Remove all rose bushes along wall and turn to rock bed.

From East corner to Coffee Entry.

Turn dirt areas into rock beds. Replace dead trees and bushes.

APPENDIX C

Area between coffee shop and Tricare entry.

Replace dead trees. Redo bed by removing rock, grass and bushes. Replace bushes with same number and pattern. Cap drip irrigation and leave existing heads.

From East side of Coffee Shop entry.

Remove existing bed (leave tree) and turn to rock bed. Cap drip irrigation.