Appendix C Serenity Gardens Site Plan.ppt
PPT presentation 9 MB Posted
- Attached to
- Serenity Garden Demolition Federal contract opportunity
- Solicitation number
- FA4661-12-T-0055
About this file
These are the Appendixes referred to in the PWS.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix B Bed and Rock Garden Site Plan.ppt | PPT presentation | |
| Solicitation for Serenity Garden Demo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C
SERENITY GARDEN
Remove all rose bushes around memorial and repair bed.
REMOVE DEAD BUSHES/TREES AROUND FOUNTAIN AREA.
2. Repair bed and add rock as needed.
Remove all rose bushes along wall and turn to rock bed.
From East corner to Coffee Entry.
Turn dirt areas into rock beds. Replace dead trees and bushes.
APPENDIX C
Area between coffee shop and Tricare entry.
Replace dead trees. Redo bed by removing rock, grass and bushes. Replace bushes with same number and pattern. Cap drip irrigation and leave existing heads.
From East side of Coffee Shop entry.
Remove existing bed (leave tree) and turn to rock bed. Cap drip irrigation.
File details come from the government source that posted it. Updated .