Appendix B Bed and Rock Garden Site Plan.ppt

PPT presentation 4 MB Posted

Attached to
Serenity Garden Demolition Federal contract opportunity
Solicitation number
FA4661-12-T-0055
Issued by
Department of the Air Force Air Combat Command

About this file

These are the Appendixes referred to in the PWS.

View the file

Other files for this federal contract opportunity

Other files attached to Serenity Garden Demolition, newest first.
File Type Posted
Appendix C Serenity Gardens Site Plan.ppt PPT presentation
Solicitation for Serenity Garden Demo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Remove Rock bed and turn to grass.

Remove rock bed and bushes from the corner of the wall to the end of staff entry way sidewalk. Turn to grass.

Appendix B

Remove rock bed to include bushes and trees. Trim bushes on the other side of the sidewalk.

Pharmacy and Main Lobby Entry to Serenity Garden

Remove beds and turn to grass. Leave boulders.

Both sides of Pharmacy and Main Lobby Entryways

Remove all edging from sidewalk to bldg and turn to grass. Remove drip irrigation and cap where it connects to rigid PVC.

Remove old bushes down to lab stairwell and replant 6 evenly spaced bushes. Remove/cap drip irrigation as needed.

File details come from the government source that posted it. Updated .