Scope of Work Revision A.pdf
PDF 97 KB Posted
- Attached to
- Construct Fence Around Child Development Center Federal contract opportunity
- Solicitation number
- FA4661-10-T-0037
About this file
Scope of Work Revision A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Questions MFR.pdf | ||
| Questions MFR.pdf | ||
| Fence CDC Solicitation.pdf | ||
| Fence CDC Statement of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
FOR
CONSTRUCT FENCE AROUND CDC PERIMETER
BLDG 8150
SOW (20 APR 2010) Page 1 of 5
1. DESCRIPTION OF SERVICES: The contractor shall provide all labor, equipment, tools, material, supervision, and all other necessary items to install a concrete footer wall and 48 in high chain link fence and attach a 48 in wire mesh fabric to the chain link around the perimeter of the Child Development Center, building 8150. The contractor will be provided a drawing of the proposed layout.
1.1 The contractor shall be responsible to verify all measurements.
1.2 The contractor shall be responsible for clearing and grubbing out brush in highlighted area of map.
The contractor shall clear out the brush to leave a 4ft clear zone west and south of proposed fence line.
The contractor shall be responsible for proper disposal of all brush in an off base location.
1.3 The contractor shall be responsible for leveling the ground where concrete wall and chain link/wire mesh fence will be constructed.
1.4 The contractor shall install a concrete footer wall. The wall shall be 1 foot above finished grade and
1 foot below finished grade. Thickness of concrete wall shall be 6 inches. The contractor shall use #4 re-bar in concrete footer for reinforcement. The contractor shall put a 45 degree angle on all edges of the concrete footer. Fence post shall be installed in center of concrete base and spaced 8ft on center.
See drawing for detail.
1.5 The contractor shall install a 9 gauge chain-link fence. The contractor shall have the fence extend 4ft above the concrete footer. The contractor shall ensure no more than a ¼ in gap between chain link fence and base of footer. The contractor shall install a tension wire at bottom of the chain link fence.
1.6 The contractor shall install a galvanized wire mesh material with holes in the mesh no bigger than 1/4
in. The contractor shall attach wire mesh material to chain link such that base joins concrete wall with gaps not to exceed ¼ in. The contractor shall extend wire mesh 48in above top of concrete base.
1.7 The contractor shall install the fence from the sidewalk of Fourth Street, behind the playground by building 8150, and through to the sidewalk at Avenue D.
1.8 The contractor shall be responsible for any damages that may occur in the work area during the installation of concrete wall and chainlink fence.
1.9 The contractor shall provide a material submittal for approval by the QAE before work commences.
1.10 The contractor shall have 45 days to complete this job.
1.11 The contractor shall warranty the wall and fence, including both labor and material, for a period of
1 year from the date of acceptance by the government.
2. HAZARDOUS CONDITIONS. During the course of performing work under this contract, should the contractor find conditions existing that prevent the performance of task specified; the Contracting Officer shall be immediately notified. A confined-space permit must be obtained through the proper authorities before entering any confined space.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide reasonable utilities and work space for the contractor to perform the requested duties. There are no covered or secure storage areas available. The contractor will provide all equipment and storage media necessary to perform tasks.
3.1. Toilet Facilities. Use of existing toilet facilities in the immediate work area only will be permitted.
Contractor personnel will ensure facility cleanliness is maintained at all times.
3.2 Security Police and Fire Protection. The government will provide general on-base security police and fire protection service. Security police phone extension is 696-2131 for emergencies, and 696-4100 for routine calls. Fire protection emergency phone is 117 (from on-base phone only), or 696-2486.
3.3. Telephone. The government shall not provide telephone services. If available, contractor may use government phones in a case of emergencies or during field and site work. No long distance telephone calls will be authorized.
4. HOURS OF OPERATION. Working hours for the contractor will normally be between the hours of 7:30
AM and 4:30 PM excluding Saturdays, Sundays, and Federal holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer five (5) calendar days in advance of his/her intention to work during
SOW (20 APR 2010) Page 2 of 5 other periods to allow assignment of additional inspection forces. If such force is reasonably available, the
Contracting Officer may authorize the contractor to perform work during periods other than normal duty hours/days.
5. SAFETY AND HEALTH. All holes/pits/trenches/manway openings, etc, that are to be left open shall be surrounded with a 48 inch high mesh fence with highly visible orange plastic coating. The fence shall be securely anchored with tension wires and posts as required to prevent sagging and located a minimum of 3 feet from the opening so as to prevent an individual, should they fall across the fencing, from falling into the opening. Holes shall also be covered, when not being worked in, with three quarter inch plywood or a metal grating that will prevent small children from entering the hole.
5.1. OSHA Requirements. All Contractor operations shall be conducted and performed in accordance with
Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and with the
Corps of Engineers (COE) Safety Manual 385-1-1, dated 03 Sep 96.
5.2. State Requirements. All companies who conduct business within the state of Texas must, in accordance with Texas Workman Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Workman Compensation
Commission (TWCC), shall be submitted For Information Only (FIO) in accordance with paragraph
SUBMITTAL REQUIREMENTS. In addition to meeting the TWCC requirements; the plan must also include the requirements of COE Safety Manual 385-1-1.
6. Disposition of Waste, Excess, Scrap, and Salvage Materials. The title to all waste, excess, scrap, and salvage materials generated as a direct result of this contract is vested in the Contractor - unless specifically excepted below. Further (unless listed below in exceptions), these materials shall be disposed of off the Base by the Contractor in accordance with all applicable Federal, State, and Local Regulations. Following is a list of materials (Exceptions) that will be generated as a result of this contract and shall be turned-into the Government at a location at Dyess AFB designated by the Contracting Officer:
Exceptions: None.
7. Radiation Permits and Authorizations. Contractors contemplating the use of devices containing radioactive materials (i.e., soil moisture/density probes) or non-ionizing radiation producing equipment (radio frequency radiation emitters or lasers) while performing work on this contract must obtain written authorization/permit from the Dyess AFB Radiation Safety Officer (RSO), 7 ADOS/SGGB. To obtain the required authorization permit, an application to bring a radioactive device on Dyess AFB must be forwarded to
7 ADOS/SGGB, 697 Hospital Road, Dyess AFB, TX 79607-1367 (this is mailing address, physical address is
880 Third St.) or (915)696-2325/3289, at least 45 days prior to the anticipated use. Without the proper authorization, Contractors will not be allowed to bring these devices on base. Also, Contractor shall provide
Bioenvironmental Engineering (7 ADOS/SGGB) a copy of contractor’s radioactive materials permit and training certificates, if radioactive material will be brought onto Dyess AFB.
8. Security Requirements.
8.1. Levels of Security. Dyess AFB security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Dyess AFB in question.
8.1.1. The lowest level of security exists in “GENERAL ACCESS” areas. These areas are all of Dyess
AFB outside of the "USAF Controlled" and "USAF Restricted" areas.
8.1.2. “USAF Controlled” access areas are the mid-level security areas. Presence within the
CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded.
SOW (20 APR 2010) Page 3 of 5
8.1.3. The highest level of security on Dyess AFB is that within the “USAF RESTRICTED AREAS”.
These areas are subdivided to be known as Protection Level 1, 2 or 3 AREAS. Work schedule requests or changes to existing schedules for work to be performed in a “USAF RESTRICTED
AREA” shall be submitted at least 7 calendar days in advance for approval and coordination of
Dyess AFB Security Forces.
8.2. Closed Base. Dyess AFB is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. The Contracting Officer will provide information necessary to obtain identification cards. The contractor shall be responsible to ensure that all of its employees obtain, and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the contractor shall be responsible for turn in of identification cards to the Contracting Officer or to the Pass and Registration Office of the Security
Forces.
NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.
8.2.1. Dyess Form 173. The Dyess AFB Form 173 is subject to the privacy act of 1974, Authority: 10
U.S.C. 8012 and 5 U.S.C. 552a (b) (7). Disclosure is Mandatory: Failure to provide the information and Social Security Number (SSN) could result in denied access to the Dyess AFB installation.
8.2.1.1. Effective 1 Nov 04, a completed signed original Dyess Form 173 (Mar 04) must be delivered to Pass & ID by 0900 on the duty day prior to the desired day of entry onto Dyess AFB. The
Visitor Control Center no longer issues temporary passes to contractor personnel unless they have already been previously identified on an executed Dyess Form 173. All information on the Dyess Form 173 must be typed and the authorizing signature must be in blue or black ink. Personal information provided on the Dyess Form 173 will be cross-referenced against state and federal criminal databases to identify those individuals possessing outstanding warrants. Those individuals with outstanding warrants will be detained at the Visitor
Control Center on the desired day of entry, and turned over to Abilene Police Department.
8.2.1.2. The approving authority (individual on the 577) can make “ink changes” in red ink to correct any errors noted on the form. All changes have to be initialed by the approval authority.
8.2.1.3. All individuals with Dyess Form 173’s will still continue to be processed via the Texas Law
Enforcement Terminal System (TLETS—police wants/warrants check). Once it is determined the individual is cleared from any wants or warrants, a copy of the Dyess Form
173 will be placed at the Tye Gate entry point. The Tye Gate Guard will use this form as an
Entry Authority List (EAL) allowing contractors onto the installation. The contractor will then be able to go to the Gate directly (not the Visitor Control Center (VCC) or Arnold Gate) and verify if their Dyess Form 173 is there. Should their Dyess Form 173 not be there, they will be directed to the VCC for issuance of an AF Form 75. At this time, someone will physically have to meet them to sponsor them onto the installation. (Reasons why the form would not be at the guard shack would be erroneous driver’s license number, erroneous information, warrant, or identified as illegal alien).
8.2.1.4. Should their Dyess Form 173 be at the Tye Gate entry point, the contractor will be told to proceed directly to the Pass and Registration Section for the 7 SFS Contractor Badge issue.
The Pass Section will have the original Dyess Form 173. Once a badge is obtained, they need only show the badge at the installation gate for entry onto the installation. Please note that neither the Security Forces Control Center nor the Tye Gate Guards will check the
Dyess Form 173 for errors. This is the responsibility of the Pass and Registration Section.
8.2.1.5. The Dyess Form 173 will be maintained at the Tye Gate entry point for 48 hours (two business days). After the specified time has expired, it will be destroyed. Should the contractor not process through Tye Gate in that 48-hour period, the contractor will require
SOW (20 APR 2010) Page 4 of 5 someone to physically vouch them on base to get a one day pass at the VCC so they may proceed to the Pass and Registration office for their badge. The hold period for these forms at the gate can and will be extended should rain days occur or through prior coordination with any affected agency.
8.2.2. Trusted Agent Letter for Day Labor Requests.
8.2.2.1. Purpose of Letter: To provide sponsoring authority to specific contractor individuals as identified by their sponsoring agency (7 CONS, Army Corp of Engineers, etc) to sponsor day laborers on for one day periods.
8.2.2.2. The Letter Process:
8.2.2.2.1. The sponsoring agency, in coordination with their contractor, will identify contractor individuals that require sponsoring/vouching authority. This authority is given to the contractor for the purpose of sponsoring day laborers/job site personnel sub-contracted as a result of an unexpected or new requirement not previously identified in the current contract. This authority will not be given to contractors for convenience only, but should be limited to the smallest group of manager or foreman contractor personnel needed to complete their assigned contract. It is the responsibility of the sponsoring agency to ensure the Trusted Agent Letter remains current. Additionally, all reasonable actions should occur to prevent use of this process when a known laborer/sub-contractor was required well in advance of the day labor/sub-contractor request. (Effective Date: Immediately)
8.2.2.2.2. The sponsoring agency will provide this letter to the Pass and Registration Section who will maintain it on file. The Pass and Registration section shall post a copy of the letter at the VCC, as a reference, to verify which contractor personnel have sponsoring/vouching authority.
8.2.2.3. The Process to get Day Labors/Job Site Personnel Sub-Contracted onto the
Installation:
8.2.2.3.1. The contractor individuals identified in the Trusted Agent Letter will provide a typed or hand-written form (form will be provided by the 7 SFS) with all individuals they will sponsor onto the installation to the VCC Guard. The VCC Guard will verify the identity of all individuals on the form by checking the information against a valid
State/Federal Identification card. The VCC Guard will randomly check a percentage of the individuals via the TLETS. Should any individual not possess a valid identification card, they will be turned away at the VCC and entry to the installation denied. Pen and ink changes can be made to the form, but all information must be validated by the guard before the contractor will be allowed to proceed onto the installation with the sponsored individuals. No AF Form 75/Visitor Pass will be issued to any individual who is sponsored by the Trusted Agent Contractor, unless the sponsored individual will be driving a vehicle onto the installation. Trusted Agent Contractors are encouraged to consolidate all sponsored individuals into the smallest number of vehicles as possible to avoid the issuance of multiple AF Forms 75. Should an AF Form 75 be issued, the driver will be required to produce a valid driver’s license, current insurance card, and current registration for the vehicle being operated. Once on the installation, the
Trusted Agent Contractor will be responsible for the actions of the sponsored individuals. Should an incident occur with a sponsored guest, and negligence be proven on the part of the Trusted Agent Contractor, their vouching/sponsoring authority will be revoked. The Trusted Agent Letter can be adjusted to add and delete names of Trusted Agent Contractors as needed, as long as the provisions of this paragraph are followed. Although the 7 SFS form is used in lieu of the AF Form 75, it carries the same authority and responsibilities. Additionally, the 7 SFS Form will expire at 0001 daily or at the end of the contractor duty day, whichever occurs first. At
SOW (20 APR 2010) Page 5 of 5 no time will the Trusted Agent Contractor depart the installation and leave any of his/her sponsored individuals with another contractor that does not have the same vouching/sponsoring privileges.
8.2.2.3.2. All contractors must attend a contractor briefing given to the contractors by Pass and
Registration who will provide a more detailed explanation regarding contractor badges and their uses. Pass and Registration reserves the right to not issue a contractor badge due to erroneous information or failure to disclose information on the Dyess Form 173.
Any derogatory information received from the background check will result in the non-issuance of the contractor badge.
9. Identification of Contractor Vehicles. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage.
10. Digging permit. The contractor will need an approved AF Form 103, construction/digging permit before any grounds work can be started.
File details come from the government source that posted it. Updated .