Attach_3_Material_Submittal_Schedule.pdf
PDF 39 KB Posted
- Attached to
- Base Pavements Basic Contract Federal contract opportunity
- Solicitation number
- FA4659-13-R-0001
About this file
Material Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| JFSD201257_Drawings.pdf | ||
| Solicitation_Cover_Letter.pdf | ||
| JFSD201257_Specification_2_Jul_13.pdf | ||
| Attch_4_Climatological_Data.pdf | ||
| 1442_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL SUBMITTAL SCHEDULE
JFSD 201257, Base Pavements Basic Contract
NOTE: Submittals required by specifications and/or drawings shall be made, regardless of whether or not they are listed below.
I T E M
SECTION
AND
PARAGRAPH
NUMBER
ITEM
P R O O F
C
M P L I A N
R O C E D U
S H
D
A W I N G
M
A
R T I F I C A T
P O
U A R A N T E
M P L
U
C E I V
P R O V E D
1 01000/5.1 & 12.1 Utility Outage Notifications & Materials X X X X X 2 0100/12.5 & 12.6 As-Builts & GIS X 3 01000/13.2 & 13.5 Permit & Storm Water Protection Plans X X 4 01000/13.4 & 13.6 Precon Surveys & Waste Disposal Plan X 5 01000/13.8&13.12 Dust Control Plan & Spill Control Plan X 6 01000/13.13 Erosion and Sediment Control Plan X 7 01000/13.12 Spill Control Plan X 8 02551/2.2 Asphalt Job Mix Formula X X 9 02551/2.3 Concrete Mix Design X X
10 02551/2.5 Geotextile X X 11 02551/2.6 Joint Sealant X X 12 02551/3 Asphalt Mix and Concrete Mix Test Reports X 13 02784/1.3 Concrete Paver Stones X X 14 02784/1.3 Cast Iron Tree Grates X X X 15 02832/1.5 Segmental Retaining Walls X X 16 02922/2.1 Manufacturer’s Data X 17 02922/2.2 Work Plan X 18 02922/2.3 Certificates of Compliance for Soil
Amendments/Fertilizers, Sod X X X
19 16375/2.1.1.2 Medium-Voltage Cables X 20 16375/2.1.2.1 Medium-Voltage Cable Joints X 21 16375/2.1.2.2 Medium-Voltage Terminations X 22 16375/2.1.2.3 Medium-Voltage Separable Insulated Connectors X 23 16375/2.2.3.1 Luminaries X 24 16375/2.2.6 Poles X 25 16375/2.2.8 Switches X X 26 16375/2.2.12 Pad-Mounted Switchgear X X 27 16375/2.2.13 Pad-Mounted Switches X X 28 02551/7 Soil Density X
MATERIAL SUBMITTAL SCHEDULE
File details come from the government source that posted it. Updated .