JFSD200830AB Submittal Schedule.pdf
PDF 485 KB Posted
- Attached to
- Improvements to Commercial Gate Federal contract opportunity
- Solicitation number
- FA4659-11-R-0016
About this file
Attachment 3 - Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 - NDDH Summary of Asbestos Requirements.pdf | ||
| Attachment 2 - JFSD200830AB Spec Revised.pdf | ||
| Attachment 1 - Questions Answers.doc | DOC document | |
| Amendment 0002 - Q A.doc | DOC document | |
| 11-R-0016-0001 Proposal Due Date Extension.doc | DOC document | |
| Solicitation Cover Letter.docx | DOCX document | |
| FINANCIAL INSTITUTION REFERENCE SHEET.docx | DOCX document | |
| Climatological.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| JFSD200830AB Drawings.pdf | ||
| JFSD200830AB Spec.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
JFSD
200830A&B
APPROVED DISAPPROVED
1 Contractor Warranty. Sec. 01000 Para. 3.3 4
2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4
3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1 4
4 Project Site Plan. Sec. 01000, Para. 8.2.1 4
5 Dirt and Dust Control Plan. Sec. 01000, Para. 8.2.2 4
6 Contractor's Health and Safety Plan. Sec. 01000, Para. 8.2.3 4
Site Superintendent/ Project Manager Designation Letter. Sec.
01000, Para. 11.1.2
8 Site Conditions Photographs. Sec. 01000, Para. 13.5 4
Critical Path Method (CPM) Network Schedule. Sec. 01000, Para.
13.6.1
Schedule Showing Procurement Plans for Materials and
Equipment. Sec. 01000, Para. 13.6.2.1
11 Exterior Utility System Drawings. Sec. 01000, Para. 13.7.1.1 1
12 Final As-Built Drawings. Sec. 01000, Para. 13.8 1
13 Real Property Record - Form DD1354. Sec. 01000, Para. 13.9 4
14 Environmental Pollution Control Plans. Sec. 01000, Para. 14.3.1 4
15 Storm Water Protection Plan. Sec. 01000, Para. 14.5 4
NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 14.6.2
Asbestos Abatement Submittals. Sec. 01000, Para. 14.6 and
Spec. Sect. 02 82 14, if used.
18 Waste Disposal Plan. Sec. 01000, Para. 14.8 4
19 Dust Control Plan. Sec. 01000, Para. 14.10 4
20 Radioactive Materials Documentation. Sec. 01000, Para. 14.13.1 4
21 Spill Control Plan. Sec. 01000, Para. 14.14 4
22 Erosion and Sediment Control Plan. Sec. 01000, Para. 14.15 4
23 Contractor Quality Control Plan. Sec. 01000, Para. 15.3 4
24 O & M Manuals. Sec. 01000, Para. 17 3
25 Sec. 01000, Affirmative Procurement Report Form 4
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT MANAGER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
CONTRACT NO.PROJECT TITLE
CONSTRUCT ATFP IMPROVEMENTS AND
REPAIR ATFP FEATURES - COMM. GATE
GRAND FORKS AFB, ND
FA4659-09-D-A003
DATE
RECEIVED
CONTRACTING
NO. OF COPIES REQUIRED
L
IN
E N
U M
B E
R ITEM DESCRIPTION, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
P R
O O
F O
F
C
M P
L
IA
N C
E
T E
S T
D A
T A
G U
A R
A N
T E
E S
S A
M P
L E
S
REQUIRED
DATE OF
SUBMISSION
P R
O C
E D
U R
E S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
IN
G
D A
T A
C E
R T
IF
IC
A T
E S
REMARKS
DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSION
DATE
SUBMITTAL
NUMBER
DATE CONTRACTOR NOTIFIED
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
156-008 01000-1
FA
4659-11-R
-0016
A ttachm ent 3
PROJECT NO.
JFSD
200830A&B
APPROVED DISAPPROVED
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT MANAGER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
CONTRACT NO.PROJECT TITLE
CONSTRUCT ATFP IMPROVEMENTS AND
REPAIR ATFP FEATURES - COMM. GATE
GRAND FORKS AFB, ND
FA4659-09-D-A003
DATE
RECEIVED
CONTRACTING
NO. OF COPIES REQUIRED
L
IN
E N
U M
B E
R ITEM DESCRIPTION, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
P R
O O
F
F
C
M P
L
IA
N C
E
T E
S T
D A
T A
G U
A R
A N
T E
E S
S A
M P
L E
S
REQUIRED
DATE OF
SUBMISSION
P R
O C
E D
U R
E S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
IN
G
D A
T A
C E
R T
IF
IC
A T
E S
REMARKS
DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSION
DATE
SUBMITTAL
NUMBER
DATE CONTRACTOR NOTIFIED
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
1 CONCRETE REINFORCEMENT 4 03 20 00
2 CONCRETE MIX DESIGN 4 03 30 00
3 METAL FABRICATIONS 4 4 3 05 50 00
4 FINISH CARPENTRY 4 4 3 06 20 00
5 JOINT SEALERS 4 3 07 92 00
6 ALUMINUM WINDOWS AND FRAMES 4 4 3 08 11 16
7 BULLET-RESISTANT COMPONENTS 1 4 4 3 08 34 02
8 TILE 4 3 09 30 00
9 ACOUSTIC CEILING TILE AND GRID 4 3 09 51 00
10 COMPOSITE PLASTIC/PLYWOOD WALL PANELS 4 3 09 77 00
11 PAINT 4 3 09 90 00
12 O&M MANUALS 3 23 00 00
13 RECORD DRAWINGS 1 23 00 00
14 TEST & BALANCE REPORT 3 23 05 93
15 CONTROLS (ELECTRIC) 4 23 09 00
16 UNIT HEATERS 4 23 82 00
17 CABINET UNIT HEATERS 4 23 82 00
18 LIGHTING FIXTURES 4 26 51 13
19 TELECOMMUNICATION CABLING SYSTEM 4 27 10 10
20 CONCRETE MIX DESIGN 4 32 16 13
21 ASPHALTIC CONCRETE PAVING MIX DESIGN 4 32 16 13
22 FENCING AND GATES 4 4 32 31 00
Y\156_004\DOCUMENTS\SPECS\01000 PART 2.xls
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
156-008 01000-2
FA
4659-11-R
-0016
A ttachm ent 3