Design Package Revised.pdf

PDF 2 MB Posted

Attached to
RECOVERY - Locate Natural Gas Distribution-Base (S/M)
Solicitation number
FA4659-09-R-0005
Issued by

About this file

Performance Work Statement

View the file

Other files

File Type Posted
Amend 5 Nat Gas Lines.doc DOC document
Amend 4 locate Nat Gas Lines.doc DOC document
Q&A Letter.pdf PDF
Amendment 3 Nat Gas Lines.doc DOC document
Amendment #2 - FA4659-09-R-0005-0002.doc DOC document
Site Visit Q&A.doc DOC document
Cover Letter.pdf PDF
RFP.doc DOC document
Natural Gas Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JFSD200421 LOCATE NATURAL GAS

DISTRIBUTION-BASE (S/M)

Grand Forks AFB, North Dakota March 2009

Technical Specifications

01000 - 1 of 28 JFSD200421

JFSD200421

LOCATE NATURAL GAS DISTRIBUTION-BASE (S/M)

Section 01000 Technical Provisions

1. SCOPE OF WORK:

1.1. Work to Be Done: The work consists of furnishing all plant, labor and materials to perform all work in strict accordance with these technical provisions and the project drawings.

1.2. Location: The site of the work is Grand Forks Air Force Base (GFAFB), ND.

2. PROJECT DESCRIPTION: The work to be performed includes but is not limited to the following:

2.1. Perform a comprehensive survey of the entire natural gas system at GFAFB excluding military family houseing (MFH). This survey involves approximately 105,000 linear feet of natural gas lines and associated valves.

2.1.1. The survey shall follow the American Society of Civil Engineer’s (ASCE) standard of subsurface utility engineering (SUE), quality D for the survey.

2.1.2. The survey shall be done in accordance with section 8.7. Geographic Information System

(GIS) and Computer Aided Drafting and Design (CADD), survey grade GPS as a minimum.

2.1.3. The final survey results shall be provided in GIS format to the government in raw data form.

2.1.4. In addition, the contractor shall compile survey results in a report to the government detailing task, procedure, findings, and open issues. This report shall also include a final updated as-built of the natural gas system. The contractor shall provide the government three hard copies and one electronic copy of this report.

The as-built drawing shall be provided electronically as detailed in section 13.10, Geographic Information System (GIS) and Computer Aided Drafting and Design (CADD).

2.2. All work not specifically addressed in this specification or specifications there after shall be installed in strict accordance with the latest National Electric Code, Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, NFPA 101 Life Safety Code, and Grand Forks AFB Architectural Compatibility Guide. The GFAFB Architectural Compatibility Guide is not included in the specifications package, but will be provided upon request.

2.3. The performance period for this service shall be 120 calendar days after Notice to Proceed.

Service Summary Perfomance Objective SOW Ref. Performance Threshold

Natural Gas Line Survey 2.1 6 weeks post award RAW GIS Data 2.1.3 4 weeks prior to contract end date Final Report/As-builts 2.1.4 1 week prior to contract end date Work Clearance Request 3.0 Prior to any onsite work Health Safety Plan 4.1.1 Prior to any onsite work Start Work Notification Letter 7.0 7 days prior to any onsite work Project Schedule 8.2 14 days post award Storm Water Protection Plan 9.5 14 days post award Spill Control Plan 9.10 14 days post award Erosion and Sediment Control Plan 9.11 14 days post award

01000 - 2 of 28 JFSD200421

Contractor Quality Control Plan 10.0 14 days post award

3. BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST: Prior to any work activity, the contractor shall initiate, prepare, and personally hand carry through an AF Form 103, Work Clearance Request. The Base Civil Engineering Work Clearance Request must be approved by the Chief of Operations, building 418. Existing utility lines to remain in place, both Government-owned and private or leased, shall be protected from damage during excavation and backfilling. If damaged, lines shall be repaired in a timely manner by the contractor at no expense to the Government. A minimum of 72 hours should be allowed for agency response to contractor requests for identifying and marking buried utility line routes. The quality assurance (QA) inspector will assist the contractor by providing points of contact, however, the sole responsibility for executing the digging permit and coordinating utility markings with the Civil Engineer shops/private utility companies is that of the contractor. The contractor shall provide drawings and details showing the exact location and description of the intended type of excavation. The contractor shall also stake and define the boundaries of all required utility locates. The contractor shall allow ten (10) working days for processing the digging permit between the various activities that must coordinate on the request.

The contractor shall provide the QA Inspector with a copy of the completed AF Form 103 and shall maintain the coordinated AF Form 103 at the job trailer. The contractor shall comply with all instructions for hand excavation and other methods of safeguarding the buried utilities. The contractor shall promptly repair any damage created by his/her work force or subcontractors to items indicated on the contract drawings or identified by the coordinating agencies, back to its original working condition. The contractor should take caution at the five (5) foot mark on any side of a utility pre-identified to the contractor. Mechanical digging shall not commence, within 5 ft of buried utility lines, until locations of those lines have been established and properly verified by hand digging. If the contractor damages the marked utility within this area, he/she is responsible for replacing the utility back to its original working condition. Work to repair the damaged utility will commence immediately and will continue uninterrupted until the utility is restored. If the contractor damages a utility that was not identified or is outside 5 feet either side of the utility marking, the contractor shall notify the CO and the QA inspector to determine the method of repair (i.e., in-house or by contract). If the damaged utility requires an outside source (e.g., someone to repair fiber optic lines) to accomplish the repairs, and the contractor is responsible for the damage, and the contractor shall be liable to pay for such repairs.

4. INTERRUPTION TO UTILITIES: Shall (Electric, gas, water, heat, sewer, traffic, telephone, etc.,) be coordinated 10 days prior to start. The contractor shall provide an estimate of time duration to complete the task to the Contracting Officer. The contractor shall restore the utilities to service before leaving the site unless prior approval has been obtained by the base Utility Superintendent and the Contracting Officer. Whenever interruptions are restricted to weekends or holidays the contractor shall perform required work at no additional cost to the Government.

4.1. PLANS

4.1.1. Health & Safety Plan: The contractor shall submit a complete health and safety plan for the proposed work. Plan/Program shall be in compliance with EM 385-1-1, OSHA, 29 CFR 1910, and other occupational health and safety requirements of the contract. Plan shall provide a detail description of procedures to comply with health and safety requirements.

4.2. CONTRACTOR’S TEMPORARY FACILITIES

4.2.1. Administrative Field Offices: Contractor’s administrative field office and storage trailers shall be in like new condition and the exterior must be clean. Contractor

01000 - 3 of 28 JFSD200421 shall be responsible for all temporary utility connections to their trailers. Storage of material/debris under the trailers is prohibited. Only minimal storage (for short term work) will be allowed at the project site.

4.2.2. Temporary Sanitation Facilities: All temporary sewer and sanitation facilities shall be self-contained units with both urinals and stool capabilities. Ventilate the units to control odors and fumes and empty and clean them at least once a week or more often if required by the Contracting Officer. The doors shall be self-closing. The exterior of the unit will match the base standard (Fed Standard 595A, color 03578), unless the facility is out of the public view.

4.2.3. Site Clean Up and Safety Fence:

4.2.3.1. The service site must be kept neat, clean, and free of debris. Clean up shall be performed at the end of each work day in conjunction with a complete general clean up at the end of the project.

4.2.3.2. A safety fence will enclose those areas not within the construction fence.

The safety fence will match the base standard (Federal Color Standard #23531) (or bright orange where it protects excavated areas), high density polyethylene grid or approved equal, a minimum of 1.1 m (42 inches) high, supported and tightly secured to steel posts located on minimum 3 m (10 feet) centers. The contractor must remove the fence from the work site upon completion of the contract.

5. UTILITY AVAILABILITY: All reasonable quantities of utilities (water and electricity) will be made available to the contractor without charge. The Government may not be held responsible for interruptions of utility service and shall not be liable for contractor delays, damages, or increased costs occasioned by any such interruption of service.

5.1. A centrally located water filling station for contractors is located at Facility 537.

Government provided water is only available at this location. For more information regarding filling station, contact designated construction inspector.

5.2. The contractor shall modify source points to meet specific needs for utility use.

6. ADMINISTRATION REQUIREMENTS

6.1. CONTRACTOR PERSONNEL REQUIREMENTS

6.1.1. Subcontractors and Personnel: Furnish a list of contact personnel of the contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

6.1.2. Supervision: Have at least one qualifying supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills. Contractor shall submit a letter to the CO designating site superintendent/project manager for the duration of contract.

01000 - 4 of 28 JFSD200421

6.2. AVAILABILITY OF CADD DRAWING FILES: After award and upon request, the electronic “Computer Aided Drafting and Design (CADD)” drawings files will be made available to the contractor for use in preparation of service data related to the referenced contract subject to the following terms and conditions. Data contained on these electronic files shall not be used for any purpose other than as a convenience in the preparation of service data for the referenced project. Any other use or reuse shall be at the sole risk of the contractor and without liability or legal exposure to the Government. The contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney’s fees and defense costs, arising out of or resulting from the use of these electronic files. These electronic CADD drawing files are not service documents. Differences may exist between the CADD files and the corresponding service documents. The Government makes no representation regarding the accuracy or completeness of the electronic CADD files and the corresponding service documents. In the event that a conflict arises between the signed and sealed service documents prepared by the Government and the furnished CADD files, the signed and sealed service documents shall govern. The contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project. If the contractor uses, duplicates and/or modifies these electronic CADD files for use in producing service data related to this contract, all previous indicia of ownership (seals, logos, signatures, initials and dates) shall be removed.

7. NOTIFICATION TO THE CONSTRUCTION MANAGEMENT OFFICE (CMO): The contractor shall notify CMO (747-4939) at least seven days in advance of starting all work. This shall include, but is not limited to, notification when the initial work shall begin; when work shall resume after stoppage exceeding three work days; and when work shall begin following all specified exclusion periods. The official Notice to Proceed does not constitute sufficient notification to CMO that work shall begin.

7.1. Work Schedule: Working hours for the contractor will normally be between the hours of

7:30 a.m. and 4:30 p.m. excluding Saturdays, Sundays, and Federal holidays. If the contractor desires to work during periods other than above, additional Government inspection forces may be required. The contractor must make a request to the Contracting Officer three days in advance of the intention to work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of normal duty hours/days solely for the benefit of the contractor, the actual cost of inspection at overtime rates will be charged to the contractor. These adjustments to the contract price may be made periodically as directed by the Contracting Officer.

8. SUBMITTALS:

8.1. Submittal Preparation: In preparing submittals it shall be incumbent upon the contractor to clearly and fully demonstrate that proposed materials, systems, or methods meet or exceed all applicable specific requirements of the Technical Provisions. Whenever possible, parameters such as units of measurement, testing protocols and technical vernacular specified in the text will be those employed or referenced by the contractor or his agent in demonstrating compliance. When not possible, the contractor will clearly and fully demonstrate, by written notation, how other parameters, employed or referenced, compare with those specified.

01000 - 5 of 28 JFSD200421

8.2. Project Schedule: Prepare for approval a Project Schedule. Show in the schedule the sequence in which the contractor proposes to perform the work and dates on which the contractor contemplates starting and completing all schedule activities. The scheduling of the entire project, on-site and off-site work, is required. The schedule must be a forward planning as well as a project monitoring tool. Make the schedule cost loaded and activity coded. The schedule will provide the basis for all progress payments. If the contractor fails to submit any schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the contractor submits the required schedule.

8.3. As-Built Drawings:

8.3.1. Redline Markup Drawings: The contractor shall revise 2 sets of paper drawings by red-line process to show the as-built conditions during the duration of the project.

These working as-built marked drawings shall be kept current on a weekly basis and at least one set shall be available on the jobsite at all times. Changes from the contract plans which are made in the work or additional information which might be uncovered in the course of provided services shall be accurately and neatly recorded as they occur by means of details and notes. Final as-built drawings shall be prepared after the completion of each definable feature of work (Foundations, Utilities, Structural Steel, etc., as appropriate for the project). The working as-built marked prints and final as-built drawings will be jointly reviewed for accuracy and completeness by the Contracting Officer and the contractor prior to submission of each monthly pay estimate. If the contractor fails to maintain the working and final as-built drawings as specified herein, the Contracting Officer will deduct from the monthly progress payment an amount representing the estimated cost of maintaining the as-built drawings. This monthly deduction will continue until an agreement can be reached between the Contracting Officer and the contractor regarding the accuracy and completeness of updated drawings. The working and final as-built drawings shall show, but shall not be limited to, the following information:

8.3.1.1. Utilities: In addition to record drawings, provide for each exterior utility system a set of reproducible utility drawings, stamped and signed by a registered professional civil engineer or professional land surveyor, and two copies. Submit within ten working days after each system is in place, but no later than five working days before final inspection. Indicate exterior utilities from a point five feet from a building to the termination point or point of connection to existing system. Include the following:

8.3.1.1.1. Horizontal and vertical controls for new utilities and existing utilities exposed during work. Reference to station's horizontal and vertical control system.

8.3.1.1.2. Sufficient dimensional control for all important features such as beginning and termination points, points of connection, inverts for sewer lines and drainage collection systems, top of pipe or conduit runs, manholes, cathodic protection appurtenances, valves, valve stem tops, backflow preventers, and other significant features.

8.3.1.1.3. Indicate type and size of all materials used in the construction of the system.

01000 - 6 of 28 JFSD200421

8.3.1.1.4. Indicate bearing and distance on tangent lines. On curves, indicate delta and radius of the curve, also provide X, Y, and Z coordinates at all BC and EC angle points. Indicate horizontal and vertical control for all intersecting and tangent points where utility alignment changes. Indicate X, Y, and Z coordinates at building line and point of connection for straight building laterals or services under 40 feet.

8.3.1.2. The location and dimensions of any changes within the building structure. Correct grade, elevations, cross section, or alignment of roads, earthwork, structures or utilities if any changes were made from contract plans. Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the contractor; including but not limited to fabrication, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.

8.3.1.3. The topography, invert elevations and grades of drainage installed or affected as part of the project.

8.3.1.4. Changes or modifications which result from the final inspection.

8.3.1.5. Where contract drawings or specifications present options, only the option selected for construction shall be shown on the final as-built prints.

8.3.1.6. If borrow material for this project is from sources on Government property, or if Government property is used as a spoil area, the contractor shall furnish a contour map of the final borrow pit/spoil area elevations.

8.3.1.7. Systems designed or enhanced by the contractor, such as HVAC controls, fire alarm, fire sprinkler, and irrigation systems.

8.3.1.8. Modifications (change order price shall include the contractor's cost to change working and final as-built drawings to reflect modifications) and compliance with the following procedures.

8.3.1.8.1. Directions in the modification for posting descriptive changes shall be followed.

8.3.1.8.2. A Modification Circle shall be placed at the location of each deletion.

8.3.1.8.3. For new details or sections which are added to a drawing, a

Modification Circle shall be placed by the detail or section title.

8.3.1.8.4. For minor changes, a Modification Circle shall be placed by the area changed on the drawing (each location).

8.3.1.8.5. For major changes to a drawing, a Modification Circle shall be placed by the title of the affected plan, section, or detail at each location.

8.3.1.8.6. For changes to schedules or drawings, a Modification Circle shall be placed either by the schedule heading or by the change in the schedule.

01000 - 7 of 28 JFSD200421

8.3.1.8.7. The Modification Circle size shall be 1/2 inch diameter unless the area where the circle is to be placed is crowded. Smaller size circle shall be used for crowded areas.

8.4. Final As-Built Drawing Preparation:

8.4.1. The redline markups drawings shall be submitted 10 days before the final inspection for approval by the Contracting Officer and/or his/her representative. Upon approval the redline markup drawings shall be returned to the contractor.

8.4.2. Preparer Qualifications: The contractor shall, at his own expense, provide a qualified individual or firm to transfer all revisions from the redline markup drawings to the awarded drawings to create the as-built drawings. Upon completion of the transfer both the redline markup drawings and the as-built drawings shall be submitted to the Contracting Officer for approval. The contractor has 20 calendar days to create the as-built drawings beginning from the day the approved redline markup drawings are returned to the contractor. Work shall be accomplished in a professional manner and the quality standards set forth in the following paragraphs.

8.4.3. Drawing Requirement: One complete set of full-size paper as-built drawings and one electronic set (AutoCAD.dwg format) of as-built drawings on a CD or DVD shall be provided by the contractor for each submittal requirement. Drawings, paper or electronic, shall comply with the latest version of the A/E/C CADD Standard available at: https://tsc.wes.army.mil/Products/standards/aec/default.asp Electronic drawings shall be created in model space at a scale of one to one (1 to 1).

A paper space layout will be setup for each drawing. All X-references shall be attached and bound to each affected sheet. Drawings must open in the specified Auto Cad format and be ready to plot without manipulation of files, directories, or other encumbrances. No securities or safeguards that would prevent full control of any drawing will be installed. Changes made or inserted shall be completely drawn in Auto Cad to depict changes. Clouding, notation, or photo insertion to indicate changes are not acceptable unless approved in advance and can only is used on rare occasions. Electronic as-built drawings are to be delivered in AutoCAD 2004 compatible format. The contractor shall provide one CD or DVD containing all drawings properly labeled including awarded original drawings that were not changed. Drawing names shall mirror the awarded original drawing names and identified on the index sheet and each page. Any changes to the number of sheets in the drawing set will require the renumbering /labeling of the entire set. All drawings in the set must be clearly distinguishable from service drawings. The words “AS-BUILT” or “RECORD DRAWING” must be prominently displayed in the drawing area or inside the revisions block of the border. The CD/DVD must also contain a second drawing set electronically plotted to a raster media such as .TIFF, .PDF, or JPEG for fast viewing.

8.5. Geographic Information System (GIS) and Computer Aided Drafting and Design (CADD)

8.5.1. Deliverables for Surveys & Studies Contract Services include, but are not limited to:

8.5.1.1. As-built drawings as required in paragraph 8.6 of this section.

01000 - 8 of 28 JFSD200421

8.5.1.2. Utility designs, plans, surveys and studies

8.5.1.3. Pavement, Grading, or Excavation plans

8.5.2. The contractor shall provide GIS deliverables in the following format:

8.5.2.1. All locational (point, line, and polygon feature(s)) data collected shall be delivered in ESRI-Arc/Info 9.2 format along with the original source files. The Geospatial files shall have an external spatial reference (.prj) file attached specifying the parameters of the coordinate system used (as provided by the government). All topologically correct geospatial data shall overlay on the installations latest orthorectified imagery provided by the government. All accuracy errors shall be reported to the contract program manager.

8.5.2.2. All graphic and non-graphic data will be collected in the format defined by the CADD/GIS Technology Center’s Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE) release 2.6 (or the most current version available), except where modified by the Government. This standard can be found at:

http://www.sdsfie.org/SDSFIEHome/tabid/36/Default.aspx

8.5.2.3. The contractor shall provide a quality control (QC) report that must state whether all inconsistencies in the data generated were corrected, or it must detail the remaining errors by case. The contractor shall utilize a topology build and clean routine to assure that there are no overshoots or undershoots in the line work, slivers or dangles in polygons, and that there is complete closure of polygons with a maximum fuzzy tolerance value of 10-9. The quality report must identify the software (name and version) and satisfy these conditions:

8.5.2.3.1. The edges of all digitized vector data or raster imagery must exactly match digitally with those of all adjacent maps.

8.5.2.3.2. The digital representation of the common boundaries for all graphic features must be exactly the same, regardless of feature layer. Each feature within a theme must be represented by a single graphic element (e.g., polygon, line, or line string).

8.5.2.3.3. Lines and line strings which represent the same graphic element must be continuous (i.e., not broken or segmented), unless that segmentation reflects a specific visual line type.

Lines or line strings representing the same type of data must not cross except at intersections.

8.5.2.3.4. Polygons must be closed (i.e., the first x- and y-coordinates must exactly match the last x- and y-coordinates). Each polygon must have a single unique centroid to which attributes (i.e., an attribute table) can be attached. Polygons of the same coverage must not overlap and must cover the area of interest completely (i.e., have no gaps in coverage).

8.5.2.3.5. All graphic elements that connect must exactly connect digitally, without overlaps or gaps.

01000 - 9 of 28 JFSD200421

8.5.2.3.6. Straight lines must be represented by only the beginning and ending x- and y-coordinate points. Lines strings must not cross back on themselves or be of zero length.

8.5.2.4. Feature Attributes: The contractor shall identify the classification, type, size, location, ID number, and any other necessary attributes (specified by the Government) for all surveyed, mapped, designed, or proposed features.

8.5.2.5. All symbol libraries, font libraries, text size, text format, and text placement shall be prepared in accordance with and conform to the Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE) Release 2 (or most current available).

8.5.2.6. The contractor shall not develop new libraries without prior written approval from the Government.

8.5.2.7. The contractor shall provide metadata files for all locational data produced under this contract. The metadata file shall conform to the Federal Geographic Data Committee’s “Content Standard for Digital Geospatial Metadata, Version 2.0” (or latest version) found at:

http://www.fgdc.gov/metadata/csdgm/index_html. The output from AutoCAD 2004 or ESRI ArcGIS generator software shall be the standard format for all metadata files created under this contract. In addition, the metadata data shall be provided in ASCII text format. The digital metadata files shall be provided to the Government along with each final product deliverable, unless otherwise approved in writing by the Government.

8.5.3. The contractor shall provide CADD deliverables in the following format:

8.5.3.1. Point Features

8.5.3.1.1. Point features should be digitized as points, not graticules, symbols or icons.

8.5.3.1.2. Do not use any symbol fonts to place point features.

8.5.3.2. Line Features (including Contours)

8.5.3.2.1. Lines will be used to depict linear features.

8.5.3.2.2. Lines should not be broken for text. For ArcView/ArcInfo use, each line should be continuous within its own layer. This will ensure spatial query compatibility.

8.5.3.2.3. Lines should all be continuous, i.e. do not create dashed lines with many small line segments. Instead, a dashed line font on a continuous line may be used.

8.5.3.3. Polygon Features

8.5.3.3.1. Area features (polygons) must always close (e.g. no "C" shaped areas). For ArcView/ArcInfo use, each polygon must be closed and on its own feature.

01000 - 10 of 28 JFSD200421

8.5.3.4. Text Labels and Identifiers

8.5.3.4.1. Text Labels are not required for any features

8.5.3.4.2. At a minimum, basic feature identifiers for roads and buildings as listed in the Spatial Data Standards will be used

8.5.3.5. All graphic and non-graphic data will be collected in the format defined by the CADD/GIS Technology Center’s Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE) release 2.600 (or the most current version available), except where modified by the Government. This standard can be found at:

8.5.4. The survey data shall be collected in the following matter:

8.5.4.1. The contractor shall use Global Positioning Systems (GPS) for field data collection at an accuracy level in accordance with “Geospatial Positioning Accuracy Standards, Part 3: National Standard for Spatial Data Accuracy,” published by the Federal Geographic Data Committee (FGDC), dated July 1998. This standards document can be found at http://www.fgdc.gov/standards/projects/FGDC-standards-projects/accuracy/part3/chapter3

8.5.4.2. All Survey data collected shall be provided to the Government in a digital format with an attached Survey Report identifying survey method, equipment list, calibration documentation, survey layout, description of control points, control diagrams, and field survey data.

8.5.4.3. A Survey Control Database (consisting of a survey marker database and a survey traverse database) will be produced for all survey control points established under this contract, and delivered in a .dbf or ASCII comma-delimited format.

8.5.4.4. The contractor shall use survey grade GPS, at an accuracy level of +/- 2 cm, when appropriate, to collect data to be overlaid onto the installation’s orthophotograph and/or base map.

8.5.5. The coordinate system shall be set up in the following matter:

8.5.5.1. All survey measurements and established coordinates shall be measured in feet, and sub-units of feet. The coordinate system for all survey data will be the North Dakota State Plane Coordinate System (North). The vertical datum will be North American Vertical Datum 1988 (NAVD 88). The horizontal datum will be North American Datum 1983 (NAD 83). Precise specifications of the North Dakota State Plane Coordinate System (North) are as follows:

8.5.5.1.1. Coordinate System: North Dakota State Plane

Coordinate System

8.5.5.1.2. Zone: North

8.5.5.1.3. Units: Feet

01000 - 11 of 28 JFSD200421

8.5.5.1.4. Projection: Lambert Conformal Conic

8.5.5.1.5. Spheroid: Geodetic Reference System 1980

(GRS80)

8.5.5.1.6. Origin Latitude: 47° 0 min, 0.00 sec W (47.0°)

8.5.5.1.7. Origin Longitude: 100° 30 min, 0.00 sec N

Longitude (-100.50°)

8.5.5.1.8. Northern Standard Parallel: 48o 44 min, 0.00 sec (48.73)

8.5.5.1.9. Southern Standard Parallel: 47o 26 min, 0.00 sec (47.43)

8.5.5.1.10. False Easting: 1,968,500.00 feet

8.5.5.1.11. False Northing: 0.00 feet

8.5.5.1.12. Horizontal Datum: North American Datum 1983

(NAD 83)

8.5.5.1.13. Vertical Datum: North American Vertical Datum

1988 (NAVD 88)

8.5.5.2. The GIS data shall be delivered accordingly: (Note: No deviations from the Government's established standards will be permitted unless prior written approval of such deviation has been issued by the Government.

All linkages of non-graphical data with graphic elements, relationships between data objects and attributes, and report formats shall be maintained.)

8.5.6. All data deliverables (plans, surveys, studies, imagery, designs, etc.) shall be in a digital (electronic information) format and shall be delivered in a format that is directly compatible with the CADD/GIS Technology Center’s Spatial Data Standards version 2.300 (or latest version available).

8.5.6.1. The following procedures must be performed before a file is placed on the delivery media:

8.5.6.1.1. Include all files, both graphic and non-graphic, required for the project. Make sure all files are in the same directory, and that references to those files do not include device or directory specifications.

8.5.6.1.2. Ensure all reference (external reference) files are attached and without device or directory specifications.

8.5.6.1.3. Remove all extraneous graphics/text outside the project border area, and set the active parameters to a standard setting (or the setting contained in the seed or prototype file).

8.5.6.1.4. Include any standards sheets (abbreviations, symbols libraries, font libraries, color tables, pen tables, plot configuration files, user command files, etc.) necessary for a complete project.

8.5.6.1.5. Compress and/or reduce all files using the appropriate utilities.

A digital media copy of the decompression utility should be provided with the delivered data, if necessary.

8.5.6.2. The GIS data shall be delivered with in the following Media:

8.5.6.2.1. CD-ROM: Digital Media must have an external label listing format and version of the operating system on which the media was created (e.g. Windows 2000), utility (command) https://tsc.wes.army.mil/Products/standards/aec/default.asp http://www.dtic.mil/whs/directives/infomgt/forms/eforms/dd1354.pdf http://www.hnd.usace.army.mil/techinfo/UFC/UFC1-300-08/UFC1-300-08.pdf

01000 - 12 of 28 JFSD200421 used for writing the files to the media, a short description of contents, and a sequence number if there are multiple volumes.

8.5.6.2.2. A transmittal sheet must accompany the media containing the information included on the external labels, total number of volumes being delivered, and a list of file names and file descriptions on each volume. The transmittal sheet must also include instructions for reading, restoring, or transferring the files from the media, and certification that all delivery media is free of known computer viruses - including the name(s) of the virus scanning software and the date the virus scan was performed.

8.5.7. At the contractor’s request the Government will provide the contractor with data and information concerning all necessary and pertinent functions and principal features of the identified project. These items will include:

8.5.7.1. The installation's latest georeferenced digital planimetric data and/or base map in ESRI Arc/Info 9.0 format or best format available, with associated data files.

8.5.7.2. The installation’s latest orthorectified imagery and specified geospatial parameters (coordinate system, datum, projection, distance units).

8.5.7.3. Any pertinent and necessary prototype or seed files.

8.5.7.4. A copy of CADD/GIS Technology Center’s Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE) release 2.300 (or latest version) on CD-ROM.

8.5.7.5. A copy of “Geospatial Positioning Accuracy Standards, Part 3: National Standard for Spatial Data Accuracy,” published by the Federal Geographic Data Committee (FGDC) in Adobe Acrobat Reader (.pdf) format.

8.5.7.6. Frequency settings for the Real-Time Kinematic (RTK) GPS Base Station and the preferred GPS receiver specifications.

8.5.7.7. Any other data or schematics deemed necessary for project completion, pending approval from the Government.

9. ENVIRONMENT PROTECTION:

9.1. Scope: The contractor shall perform all work in such manner as to prevent the polluting of air, water, or land, and shall follow all applicable federal, state, and local regulations and guidelines.

9.2. Applicable Publications: The publications listed below form a part of this specification to the extent referenced. The publications referred to in the text by the basic designation only.

9.2.1. United States Environmental Protection Agency: EPA 832-R-92-005 Storm Water Management for Construction Activities

01000 - 13 of 28 JFSD200421

9.3. Implementation: Within 20 calendar days after Notice to Proceed and prior to commencement of the work at the site, the contractor shall:

9.3.1. Submit in writing to the Contracting Officer (CO) the required plans for implementing the requirements for environmental pollution control specified herein. 319 CES/CEV must review and approve all plans submitted by the contractor.

9.3.2. Contractor shall follow EPA guidance 832-R-92-005 Storm Water Management for

Construction Activities. Copies are available for review at Environmental Management Flight (319 CES/CEV).

9.4. Preservice Survey: Prior to start of any on-site work activities, the contractor and the

Contracting Officer's representative shall make a joint condition survey after which the contractor shall prepare a brief report indicating on a layout plan the condition of trees, shrubs, and grassed areas immediately adjacent to the site of the work and adjacent to his assigned storage area and access route(s) as applicable. This report will be signed by both the Contracting Officer's designated representative and contractor upon mutual agreement as to its accuracy and completeness.

9.5. Storm Water Protection Plan: Grand Forks Air Force Base has been issued a National

Pollutant Discharge Elimination System (NPDES) permit for storm water runoff, permit number NDR02-0314. The contractor shall be responsible for strict adherence to the NPDES permit. The NPDES permit is available for contractor review at 319 CES/CEV, 525 Tuskegee Amn. Blvd., Grand Forks AFB, ND. The contractor shall comply with applicable Federal, State, County, and Municipal laws concerning pollution of rivers and streams while performing work under this contract. Special measures shall be taken to prevent pollutants including rock, sand, sediment, dirt, chemicals, fuels, oils, greases, bituminous materials, herbicides, and insecticides from entering public waters (this includes eliminating sediment from entering the storm drain inlets). Water used in on-site material processing, concrete curing, foundation and concrete cleanup, and other wastewaters shall not be allowed to reenter a stream if an increase in the turbidity of stream could result. A Storm Water Protection Plan must be submitted to the Contracting Officer prior to beginning work for review and approval by the CO and 319 CES/CEV. The Storm Water Protection Plan must identify all special measures proposed by the contractor to prevent storm water pollution.

9.6. Dust Control Plan: The contractor shall comply with NDAC 33-15-17-03, Reasonable

Precautions for Abating and Preventing Fugitive Particulate Emissions, and maintain all excavations, stockpiles, access roads, waste areas, and all other work areas free from excess dust in accordance with NDAC 33-15-07-03. Approved temporary methods consisting of sprinkling or similar methods will be permitted to control dust. Dust control shall be permitted as the work proceeds and whenever dust nuisance or hazard occurs. The contractor shall be responsible for performing all dust control work in accordance with EPA 832-R-92-005, Chapter 3. The methods the contractor will use to control dust in any areas affected by the project will be addressed in the Dust Control Plan. The Dust Control Plan must be submitted to the CO prior to beginning of work for review and approval by the CO and 319 CES/CEV.

9.7. Corrective Action: The contractor shall, upon receipt of a notice in writing of any noncompliance with the foregoing provisions, take immediate corrective action. If the http://www.fgdc.gov/metadata/csdgm/index_html

01000 - 14 of 28 JFSD200421 contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs of damages by the contractor unless it was later determined that the contractor was in compliance.

9.8. Materials: Lead-based paint or asbestos-containing materials shall not be used. The materials which the contractor delivers to the Government shall be in compliance with applicable Federal, State, County, and municipal laws governing pollution of rivers and streams, and waste handling. If corrective measures are required, paragraph 13.9 shall apply.

9.9. Radioactive Materials:

9.9.1. Civilian contractors bringing radioactive materials or devices containing radioactive sources onto Grand Forks AFB must have prior approval from the Wing Radiation Safety Officer (RSO), at Bioenvironmental Engineering (701) 747-5596. In addition, the contractor must submit the following documentation to the Wing RSO for review:

9.9.1.1. Copy of the Nuclear Regulatory Commission License or

Agreement State License, along with any amendments, covering the radioactive material to be used

9.9.1.2. Copy of the user’s qualification and radiation safety training

9.9.1.3. Radiation dosimeter results from the prior calendar year

9.9.1.4. Statement of expected use (use rate) of radioactive materials or devices for the length of the contract

9.9.1.5. Statement of storage and security requirements

9.9.1.6. Copies of the last two leak checks (if applicable)

9.9.2. Under no circumstances will a contractor use an unlicensed radioactive source/device on Grand Forks AFB. The contractor should direct any questions regarding his responsibility on this issue to the Wing RSO prior to the starting of any work. Because the Air Force considers contracts involving radioactive materials a hazardous items contract, the provisions of AFI 40-201, chapter 3, will also apply.

9.10. Spill Control Plan. All hazardous material/waste spills must be reported to the Contracting

Officer. Any release of a hazardous material/waste which is beyond the capability of the contractor must be reported to 911 immediately. The contractor will notify and provide complete documentation of spills to 319 CES/CEVP. Documentation will include the date and time of spill, location, quantity, and an MSDS of the spilled material. 319 CES/CEVP will file any required reports with Federal, State, and local agencies. The Spill Control Plan must be submitted to the CO for review and approval by the CO and 319 CES/CEV. The plan must include, but limited to, identifying potential spill sources, control measures, contaminated soil removal and disposal, notifications.

9.11. Erosion and Sediment Control Plan: Project activities that include digging, scraping, stockpiling, or regrading have the potential to be eroded and create sediment problems at the http://www.sdsfie.org/SDSFIEHome/tabid/36/Default.aspx http://www.fgdc.gov/standards/projects/FGDC-standards-projects/accuracy/part3/chapter3 http://www.fgdc.gov/standards/projects/FGDC-standards-projects/accuracy/part3/chapter3

01000 - 15 of 28 JFSD200421 project site as well as areas adjacent to the site. An Erosion and Sediment Control Plan must be submitted to the CO for review and approval by the CO and 319 CES/CEV. The plan must include, but not limited to, stockpile location, control methods to eliminate erosion of stockpile, identify exposed natural areas and appropriate control methods.

10. CONTRACTOR QUALITY CONTROL (CQC): The contractor shall establish and maintain an effective Quality Control Program as follows:

10.1. General: Except for isolated tests or other items of work specified to be performed by the Government, the quality of all work shall be the responsibility of the contractor. Sufficient inspections and tests of all items of work, including that of subcontractors, to ensure conformance to applicable specifications and drawings with respect to the quality of materials, workmanship, construction, finish, functional performance, and identification shall be performed on a continuing basis. The contractor shall furnish qualified personnel, appropriate facilities, instruments and testing devices necessary for the performance of the quality control function. The controls shall be adequate to cover all service operations both on and off site, shall be keyed to the proposed sequence and shall be correlated by the contractor's quality control personnel.

10.2. Preservice Planning: Prior to starting onsite service, the contractor shall submit for approval his written QC plan which shall include all the following features.

10.3. Submittal of CQC Plan: Acceptance of the contractor's quality control plan is required prior to the start of service. Acceptance is conditional and will be predicated on satisfactory performance during the service. The Government reserves the right to require the contractor to make changes in his CQC plan and operations as necessary to obtain the quality specified.

10.4. Contractor's Proposed (QC) Plan: The contractor's proposed written quality control plan shall include as a minimum:

10.4.1. Weekly Meetings

10.4.1.1. Weekly Minutes

10.4.1.2. Designated Meeting Location

10.4.2. The quality control organization

10.4.3. Names, number, and qualification of personnel to be used for this purpose

10.4.4. Authority and responsibilities of all quality control personnel

10.4.5. Schedule use of inspection personnel by types and phase of work

10.4.6. A list of tests specified to be performed with proposed test methods including specification paragraph number and names of technicians or qualified testing laboratory to be used

10.4.7. Location and availability of test facilities and equipment

10.4.8. Procedures for advance notice and coordination of special inspections and tests where required

01000 - 16 of 28 JFSD200421

10.4.9. Procedures for reviewing all shop drawings, samples, certificates, or other submittals for contract compliance and certifying these for submission to the Government

10.4.10. Method of performing, documenting, and enforcing quality control operations of both prime and subcontract work including inspection and testing both onsite and offsite. Include the proposed forms for approval, and indicate who will prepare, sign, and submit the reports.

10.4.11. Responsibilities and procedures for correcting deficiencies and corrective actions

10.4.12. A copy of a letter of direction to the contractor's representative responsible for quality control, outlining his duties and responsibilities, and signed by a responsible officer of the firm

10.4.13. Method of documenting and tracking deficiencies and corrective actions

11. FOLLOW UP INSPECTIONS shall be performed continuously as any particular feature of work progresses, to assure compliance with contract requirements including control testing, until completion of that feature of the work.

11.1. Safety Inspections: The contractor shall perform daily safety inspections of the jobsite and the work in progress to assure compliance with EM 385-1-1 and other occupational health and safety requirements of the contract. Daily Quality Control reports as required under paragraph: REPORTING shall be used to document the inspection and shall include a notation of the safety deficiencies observed and the corrective actions taken. The contractor shall use his designated Quality Control Staff to perform the required inspections and shall supplement the staff with additional personnel as required.

11.2. Quality Control Staff: The contractor's job supervisory staff may be used for quality control supplemented as necessary by additional personnel for the controls required by the specifications. The contractor's staff member designated as the QC Supervisory Engineer for the contract must be a qualified engineer or technician and be able to demonstrate ability to perform correctly the duties required to the satisfaction of the Contracting Officer and must be employed full time at the project site whenever contract work is in progress.

11.3. Reporting: All inspections and test results shall be recorded daily.

11.3.1. Daily Submittals: The attached sample "Quality Control Daily Report" form or other approved form shall be reproduced and fully executed to show all inspections and tests and submitted in duplicate to the Contracting Officer's representative on the first work day following the date covered by the report.

11.3.2. Acceptance of the contractor’s daily Control Report does not indicate or imply agreement with the contents.

12. SECURITY REQUIREMENTS:

12.1. General: Security requirements for Air Force facilities under control of Grand Forks Air Force Base are specific and rigidly enforced. Levels of security include Restricted and Controlled. Differing degrees of security are enforced at each area. Minimum security requirements, common not only to each of these secure areas, are also required for entry onto Grand Forks AFB. These minimum requirements are outlined below.

01000 - 17 of 28 JFSD200421

12.1.1. Restricted areas identified on GFAFB 207-1 include the Alert Aircraft Parking Area

(AAPA), the Weapons Storage Area (WSA), and the Mass Parking Area (MPA).

Each area is fenced and conspicuously identified by posted signs.

12.1.2. Controlled areas include more than sixty user-controlled base facilities; only a few of which include all hangars, buildings, and communications facilities located within the base aircraft flight-line controlled area. Each of these areas is identified in GFAFBR 125-37 and each is conspicuously identified by posted signs.

12.2. This contract will entail work in:

12.2.1. Areas requiring base entry only

12.2.2. Controlled areas: Contractor’s personnel must be escorted when in the controlled area. Work in this area will require the creation of a free zone so the contractor’s personnel can work in the area without security escorts. The contractor shall work with the Security Forces to establish this area. Contractor personnel may need to be escorted from the perimeter of the controlled area to the free zone and back out.

12.3. Minimum Security Requirements (All Areas Including Base Entry):

12.3.1. Vehicle…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .