Amendment #2 - FA4659-09-R-0005-0002.doc
DOC document 69 KB Posted
- Solicitation number
- FA4659-09-R-0005
About this file
The purpose of this amendment is to: 1. Remove and replace the pricing schedule on page 3 of 36, and remove and replace clause 52.212-2 with the options. 2. Provide questionis and answers from the site visit, see attached document Site Visit Q&A.doc. 3. Extend the offers due date from 25 March 2009 to 1 April 2009.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 5 Nat Gas Lines.doc | DOC document | |
| Amend 4 locate Nat Gas Lines.doc | DOC document | |
| Q&A Letter.pdf | ||
| Amendment 3 Nat Gas Lines.doc | DOC document | |
| Site Visit Q&A.doc | DOC document | |
| Cover Letter.pdf | ||
| RFP.doc | DOC document | |
| Natural Gas Map.pdf | ||
| Design Package Revised.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 25-Mar-2009 01:00 PM to 01-Apr-2009 01:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from Locate Natural Gas Dist - Base to Locate Natural Gas - Option #1.
The CLIN extended description has changed from
The contractor is to furnish all plant, labor, materials, equipment, supplies, and supervision necessary for JFSD200421 LOCATE NATURAL GAS DISTRIBUTION-BASE (S/M) in accordance with the statement of work.
to
The contractor is to furnish all plant, labor, materials, equipment, supplies, and supervision necessary for JFSD200421 LOCATE NATURAL GAS DISTRIBUTION-BASE (S/M) in accordance with the statement of work.
Gas lines shall be exposed by means of non-destructive vacuum exposure (hydro or air) every 1250 feet at a minimum unless there is a change in direction or an intersection in the line. At this point, the line shall be exposed and surveyed at the midpoint of this change in direction/intersection to minimize the frequency of non-destructive digging. If a valve is located in the path of the line, the valve shall be used to mark XY instead of exposing the pipe and marking XYZ. This may eliminate a test hole in some cases, and the minimum distance from test hole to test hole would then reset. For areas directly around buildings, if there is adequate signal from the tracer wire, the contractor will not be required to expose the pipe within 20 feet of the building as the service line will have an XYZ from exposure and there will also be an XY from where the gas piping emerges to enter the outside of the building. Using the tracer signal, XYZ, and XY, this should be sufficient information to map the line. For all other areas, if tracer wire is not available, the line shall be exposed every 500 feet. For additional information, refer to section 2 - Project Description, of the Technical Specifications..
CLIN 0002 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Locate Natural Gas - Option #2
FFP
The contractor is to furnish all plant, labor, materials, equipment, supplies, and supervision necessary for JFSD200421 LOCATE NATURAL GAS DISTRIBUTION-BASE (S/M) in accordance with the statement of work.
Gas lines shall be exposed by means of non-destructive vacuum exposure (hydro or air) every 1000 feet at a minimum unless there is a change in direction or an intersection in the line. At this point, the line shall be exposed and surveyed at the midpoint of this change in direction/intersection to minimize the frequency of non-destructive digging. If a valve is located in the path of the line, the valve shall be used to mark XY instead of exposing the pipe and marking XYZ. This may eliminate a test hole in some cases, and the minimum distance from test hole to test hole would then reset. For areas directly around buildings, if there is adequate signal from the tracer wire, the contractor will not be required to expose the pipe within 20 feet of the building as the service line will have an XYZ from exposure and there will also be an XY from where the gas piping emerges to enter the outside of the building. Using the tracer signal, XYZ, and XY, this should be sufficient information to map the line. For all other areas, if tracer wire is not available, the line shall be exposed every 500 feet. For additional information, refer to section 2 - Project Description, of the Technical Specifications.
FOB: Destination
PURCHASE REQUEST NUMBER: F2A3E19049A002
SIGNAL CODE: A
NET AMT
CLIN 0003 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Locate Natural Gas - Option #3
FFP
The contractor is to furnish all plant, labor, materials, equipment, supplies, and supervision necessary for JFSD200421 LOCATE NATURAL GAS DISTRIBUTION-BASE (S/M) in accordance with the statement of work.
Gas lines shall be exposed by means of non-destructive vacuum exposure (hydro or air) every 750 feet at a minimum unless there is a change in direction or an intersection in the line. At this point, the line shall be exposed and surveyed at the midpoint of this change in direction/intersection to minimize the frequency of non-destructive digging. If a valve is located in the path of the line, the valve shall be used to mark XY instead of exposing the pipe and marking XYZ. This may eliminate a test hole in some cases, and the minimum distance from test hole to test hole would then reset. For areas directly around buildings, if there is adequate signal from the tracer wire, the contractor will not be required to expose the pipe within 20 feet of the building as the service line will have an XYZ from exposure and there will also be an XY from where the gas piping emerges to enter the outside of the building. Using the tracer signal, XYZ, and XY, this should be sufficient information to map the line. For all other areas, if tracer wire is not available, the line shall be exposed every 300 feet. For additional information, refer to section 2 - Project Description, of the Technical Specifications.
FOB: Destination
PURCHASE REQUEST NUMBER: F2A3E19049A002
SIGNAL CODE: A
NET AMT
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item has been added to CLIN 0002:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 120 dys. ADC |
| 1 |
| 319 CES/CEC - F2A3E1 |
GLORIA DARBY
575 TUSKEGEE AIRMEN BLVD, BLDG 410, RM 15
GRAND FORKS AFB ND 58205-6219
701-747-4783
FOB: Destination F2A3E1
The following Delivery Schedule item has been added to CLIN 0003:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 120 dys. ADC |
| 1 |
| 319 CES/CEC - F2A3E1 |
GLORIA DARBY
575 TUSKEGEE AIRMEN BLVD, BLDG 410, RM 15
GRAND FORKS AFB ND 58205-6219
701-747-4783
FOB: Destination F2A3E1
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0002:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
The following Acceptance/Inspection Schedule was added for CLIN 0003:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. Price
2. Technical Acceptance (pass/fail)
Contractor must provide evidence of similar work they completed satisfactorily.
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer, whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
ADDENDUM to FAR 52.212-2:
BASIS FOR CONTRACT AWARD: This is a competitive selection. By submission of its offer in accordance with the instructions provided in clause FAR 52.212-1, Instructions To Offerors, the offeror accedes to the terms of this model contract. All technically acceptable offers shall be treated equally except for their prices. Failure to meet a requirement may result in an offer being determined technically unacceptable. Offerors must clearly identify any exception to the solicitaiton terms and conditions and provide complete accompanying rationale. The evaluation process shall proceed as follows:
A. Technical Acceptability: Initially, the government evaluation team shall evaluate the technical proposals on a pass/fail basis, assigning ratings of Acceptable, Reasonably Susceptible of Being Made Acceptable, or Unacceptable.
B. Price Evaluation: Next, all Technically Acceptable and Reasonably Susceptible of Being Made Acceptable offers shall be separated by OPTION (i.e. – OPTION 1 proposals and OPTION 2 proposals and OPTION 3 proposals). Proposals for each OPTION will then be ranked according to price.
C. The government recognizes that the offeror for the best value OPTION 1 proposal may not be the same offeror for best value OPTION 2 proposal or for best value OPTION 3 proposal. However, the government reserves the right to award to any of these offeror based on the government’s determination of which option provides the best value. Award shall be made to that offeror without further consideration of any other offers.
(End of provision) (End of Summary of Changes)