Q and A - F5D2044086A001 09062025.pdf

PDF 77 KB Posted

Attached to
Aircraft Wash Rack, KC-135, Grissom Air Reserve Base, IN
Solicitation number
FA465425R0007
Issued by

About this file

This document is a Questions and Answers (Q&A) file for the KC-135 Wash Rack project at Grissom Air Reserve Base in Indiana, associated with Solicitation F5D2044086A001. The Q&A addresses key project details, including multiple offer submissions, project classification, performance dates, and bonding requirements. Specifically, the document confirms that the project is not classified as a construction project requiring EM-385-1-1 safety standards, no bond is required, and the current expected Period of Performance is 30 September 2025, with flexibility possible based on equipment lead times. Contractors are allowed to propose alternative performance dates and can submit multiple solutions as outlined in Section L-1.8 of the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KC-135 Wash Rack - Grissom ARB, IN 9 June 2025 Solicitation F5D2044086A001 Questions and Answers

Q: If there is more than one solution to be offered how can that be submitted?

A: See Section L-1.8 Multiple Offers.

Q: Will adherence to the "Grissom ARB Construction Contractor's Guide" be required on this project?

A: No

Q: Is this project classified as a "construction" project that will require adherence to the requirements of EM-385-1-1, including an onsite Site Safety and Health Officer at all times work is being performed?

A: No

Q: In the "Deliveries or Performance" section on page 6 of the solicitation, there is a delivery date of 30 Sep 2025. Is this the expected Period of Performance date?

A: Yes, this may be flexible based on product lead times.

Q: If 30 Sep 2025 is the current expected Period of Performance date, may Contractor propose a different date based on equipment lead times?

A: Yes

Q: Is a bond required for this project?

A: No