Att 6_Task Order Bid Schedule.pdf

PDF 691 KB Posted

Attached to
Repair LF Gates Requirements Federal contract opportunity
Solicitation number
FA4626-24-R-0008
Issued by
Department of the Air Force Global Strike Command

About this file

This document is an attachment titled "Att 6_Task Order Bid Schedule" related to Solicitation FA4626-24-R-0008 for the "Repair LF Gates Requirements" project at the Malmstrom Air Force Base missile complex. The attachment provides a bid schedule for the required work, which includes demolishing existing gates, drop rod catches, gatekeeper posts, and hinges, and installing new gates, hinges, drop rod, drop rod guide assembly, gatekeepers, gate latch assemblies, and drop rod catches per the drawings and specifications. The bid schedule includes CLINs for bonding, government delays, and the repair of the LF gates. Pricing is required on a unit basis for the 50 LF sites included in the initial task order. This is an informational CLIN only, and the actual pricing will be determined through the competitive bidding process for this solicitation.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Contractor Name)

CLIN No. SLIN No. Description Unit Unit QTY Unit Price Total Evaluated Price

CLIN 0001

INFORMATIONAL ONLY - INFORMATIONAL CLIN ONLY

Launch Facilities (LFs) included in initial Task Order: K-02 through K-11, L-02 through L-11, M-02 through M-11, N-02 through N-11, and O-02 through O-11 (50 sites)

0001AA

Bonding - Shall be paid for as a Lot per Task Order at the amount per Government contract requirements. Profit and Overhead are not applied to this SLIN and will be paid on a reimburseable cost basis.

Each 1 -$ -$

0001AB

Government Delays - Refer to Specifications (Attachmen 1) Section 01 10 00, 1.9 "Government Delays" for items included in this SLIN. Hours 150 -$ -$

0001AC

Repair LF Gates - Includes the work to demolish existing gates, drop rod catch, gatekeeper posts, and hinges. Also includes the installation of new gates, hinges, drop rod, drop rod guide assembly, gatekeepers, gate latch assemblies, and drop rod catches per drawings and specifications. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract costs for “Repair LF Gates”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, utility locates, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract price for “Repair LF Gates”.

Each 50 -$ -$

-$ Total Evaluated Price CLIN 0001

FA4626-24-R-0008 Repair LF Gates Requirements