This document is a set of Questions and Answers related to Solicitation FA4626-24-Q-0041 for Water Sediment Removal services at Malmstrom Air Force Base in Montana.

The key details are:

  • The contract will be a base year plus four option years, for a total of five years.
  • The work involves oil and water sediment removal from approximately 6 oil separators and 7 pits/concrete cavities on the base.
  • The largest site is Building 1448, which has an 8ft x 3ft oil-water separator that is 14ft deep and holds 250 gallons.
  • The government estimates 8-12 unscheduled service visits per year will be required, and provides details on the frequency of pumping the sand pits.
  • Contractors are advised that the pits are not lined, and limited information is available on the type of sediment or oil that may be encountered.
  • The government indicates an incumbent contractor currently provides these services under Contract FA462619CA009, but does not provide additional details on the incumbent.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Sediment Removal FA4626-24-Q-0041 Questions and Answers

Question # Question Answer 1 Would you happen to have any information on how many service visits would be anticipated per year to arrive at the proposed quantities? Non scheduled visits 8 to 12 times 2 Do you know what the sizes are for the oil-water separators at the facility? No, Oil removal will be rare and not over 300 gallons 3 Are there any pictures of the areas/sites that need sediment & oil removed from? No 4 Knowing if the sediment, for example, is in a lined cavity will allow us to select the best equipment for the job. Concrete pits not lined 5 Is there any information/description available on the type of oil, etc.? This will help us put together our materials & disposal lists. No 6 I was wondering if you would be able to provide a sample sheet of the sediment water lab results. Or could you provide the name of the center that does the analysis? Attachments 2-5 have been provided for reivew.

7 How many buildings have sand pits? 11 8 How many times/year are they pumped? Attachment 1 has been provided for review.

9 How many gallons is water/oil separator? 350 10 What building is the largest requiring service and how large is it? Building 1448 is the largest building requiring services. It is around 8 ft by 3ft.

11 What type of truck was used for the service? 3000-gallon vac truck.

12 How deep is the oil water separator (for building 1448)? 14 ft deep, 250 gallons.

13 How many oil separators exist? Estimated 6 oil separators.

14 How many pits are needed to be serviced? Estimated 7 pits.

15 What type of contract will this be? It is a base year plus four option years, totaling five years.

16 How many times will removal be needed? Attachment 1 has been provided for review.

17 How many pits are in the second location (auto hobby car wash)? Two of them around 5 ft deep.

18 Will the government please clarify if there is an incumbent providing service on this contract or is this level of effort a new need? This information can be accessed via FPDS-NG under contract number FA462619CA009.

19 If there is an incumbent, can the government please provide the most recent contract award number & contract value? This information can be accessed via FPDS-NG under contract number FA462619CA009.