Q&A_2.pdf

PDF 47 KB Posted

Attached to
Demolition of Bldg. 1702 Federal contract opportunity
Solicitation number
FA462619Q0091
Issued by
Department of the Air Force Global Strike Command

About this file

Received questions and answers

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of Bldg. 1702, newest first.
File Type Posted
B-1702_Water_Demolition.pdf PDF
Q&A.pdf PDF
Addendum__1.pdf PDF
2013-10-18_B-1702_ACM_Survey_Report.pdf PDF
Building_Plans.pdf PDF
Tab3-COMB-Attachment_3.pdf PDF
Tab3-COMBO-Attachment_2.pdf PDF
Tab3-COMBO-Attachment_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q/A

1. Will hand carried quotes be accepted?

A. Yes, if the sealed quote arrives prior to the solicitation’s closeout deadline.

2. Will asphalt need to be repaired if it is removed?

A. Looking at the drawings, asphalt should not have to be excavated to get at the water line. However, if asphalt needs to be removed, it shall be removed with straight cuts and replaced. Place 12-inches of gravel sub-base, compact to 95%, replace with 4 inches of asphalt.

3. Who owns the transformer that is to be removed?

A. The transformer is the property of the United States

Air Force and per note 2 on page 3 of 5 of the drawings, the contractor is to dispose of the transformer.

4. Can equipment be left at the jobsite?

A. Yes, but at your own risk.

5. Can an RV or base campsite be utilized during the project?

A. 24 hour passes will not be issued and lodging arrangements are on you not the government.

Additionally, base facilities like Fam-Camp are reserved for active duty personnel, members of the Guard & Reserves, Retires, and DoD Civilians.

File details come from the government source that posted it.