Q&A.pdf
PDF 9 KB Posted
- Attached to
- Crosswalk Lights
- Solicitation number
- FA462619Q0073
About this file
Q&A Document
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_CrosswalkLights.pdf | ||
| Amendment_0003.pdf | ||
| Malmstrom_Crosswalk_Location.pdf | ||
| Malmstrom_Crosswalk_Lighting_Utilities.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| COMBO_CrosswalkLights.pdf | ||
| PWS_CrosswalkLights.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER DOCUMENT
Requirement: Crosswalk Lights
22 August 2019
Q1: Is the system solar or utility powered?
A1: The system shall be utility powered.
Q2: If the system is utility powered, please provide electrical drawings detailing how and where the crosswalk beacons are to be powered.
A2: Please see attached to this posting. The electricity will tie into the electrical supply at the point in the bottom left corner of the drawing and run it along Goddard Drive and under the pavement entrance to the Malmstrom Fitness Center parking lot to supply the crosswalk on that corner of the street.
Q3: Are site drawings available showing the porposed location?
A3: Please see attached to this posting.
Q4: Are there any underground or above ground utility conflicts at the site?
A4: Please see attached to this posting for all current utilities surrounding the location.
File details come from the government source that posted it.