PWS_CrosswalkLights.pdf

PDF 68 KB Posted

Attached to
Crosswalk Lights
Solicitation number
FA462619Q0073
Issued by

About this file

Performance Work Statement (PWS)

View the file

Other files

File Type Posted
SOW_CrosswalkLights.pdf PDF
Amendment_0003.pdf PDF
Malmstrom_Crosswalk_Location.pdf PDF
Q&A.pdf PDF
Malmstrom_Crosswalk_Lighting_Utilities.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
COMBO_CrosswalkLights.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Crosswalk Lights Malmstrom AFB, MT

10 July 2019

NEED:

Lighted, motion activated crosswalk bollards. A crosswalk lighting system consisting of bollard posts on each side of the road that will activate attached strobe lights and crosswalk illuminating lights using a motion sensor. The lighting will be activated when a person walks up next to the bollard prior to crossing the roadway. An example picture is at the bottom of this document for reference purposes only.

REQUIREMENTS:

• Two (2) motion activated bollards installed at one crosswalk on Goddard Drive at Malmstrom Air Force Base, Montana

• Bollards shall be installed one on either side of the roadway/crosswalk

• Each bollard shall be approximately six feet or more in height and approximately one foot in width on each side

• “XING”, “CROSSWALK”, or similar verbiage shall be visible in large, six to eight inch letters on the sides of the bollards facing motor vehicle traffic

• Motion activated flashing lights must activate whenever a person walks within the motion sensing range, and lights shall be approximately three-four inches in width

• Bollards shall have functionality in all lighting and weather conditions o I.E. dawn, daylight, dusk, and nighttime o To include any and all incliment weather conditions

• Strobe lighting must be highly visible to motorists in the roadway

• Flood style lights must illuminate the crosswalk completely during hours of darkness

• Bollard posts shall be synchronized so when one is activated, the other across the roadway activates as well

• A minimum three year warranty shall be provided by the contractor

INSTALLER RESPONSIBILITIES/DELIVERY:

• Delivery and installation of bollards shall be completed within 45 days After Date of Contract (ADC)

• Contractor shall install the system per the manufacturer guidelines

• Contractor shall provide training on basic troubleshooting of the system to the base Civil

Engineering Squadron personnel once installation has been completed o A training document/booklet shall suffice for this requirement o Reach-back technical support from the contractor shall be provided as needed

File details come from the government source that posted it.