PWS_CrosswalkLights.pdf
PDF 68 KB Posted
- Attached to
- Crosswalk Lights
- Solicitation number
- FA462619Q0073
About this file
Performance Work Statement (PWS)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_CrosswalkLights.pdf | ||
| Amendment_0003.pdf | ||
| Malmstrom_Crosswalk_Location.pdf | ||
| Q&A.pdf | ||
| Malmstrom_Crosswalk_Lighting_Utilities.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| COMBO_CrosswalkLights.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Crosswalk Lights Malmstrom AFB, MT
10 July 2019
NEED:
Lighted, motion activated crosswalk bollards. A crosswalk lighting system consisting of bollard posts on each side of the road that will activate attached strobe lights and crosswalk illuminating lights using a motion sensor. The lighting will be activated when a person walks up next to the bollard prior to crossing the roadway. An example picture is at the bottom of this document for reference purposes only.
REQUIREMENTS:
• Two (2) motion activated bollards installed at one crosswalk on Goddard Drive at Malmstrom Air Force Base, Montana
• Bollards shall be installed one on either side of the roadway/crosswalk
• Each bollard shall be approximately six feet or more in height and approximately one foot in width on each side
• “XING”, “CROSSWALK”, or similar verbiage shall be visible in large, six to eight inch letters on the sides of the bollards facing motor vehicle traffic
• Motion activated flashing lights must activate whenever a person walks within the motion sensing range, and lights shall be approximately three-four inches in width
• Bollards shall have functionality in all lighting and weather conditions o I.E. dawn, daylight, dusk, and nighttime o To include any and all incliment weather conditions
• Strobe lighting must be highly visible to motorists in the roadway
• Flood style lights must illuminate the crosswalk completely during hours of darkness
• Bollard posts shall be synchronized so when one is activated, the other across the roadway activates as well
• A minimum three year warranty shall be provided by the contractor
INSTALLER RESPONSIBILITIES/DELIVERY:
• Delivery and installation of bollards shall be completed within 45 days After Date of Contract (ADC)
• Contractor shall install the system per the manufacturer guidelines
• Contractor shall provide training on basic troubleshooting of the system to the base Civil
Engineering Squadron personnel once installation has been completed o A training document/booklet shall suffice for this requirement o Reach-back technical support from the contractor shall be provided as needed
File details come from the government source that posted it.