Q&A_11_July_18.pdf
PDF 57 KB Posted
- Attached to
- Repair Bldg 3080 Walls and Asbestos Removal
- Solicitation number
- FA4626-18-R-0022
About this file
Questions and Answers 11 July 2018
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1: I do not think 60 days is enough time to complete this project can it be 90-120 days?
Answer: The project timeline could be extended to 100 days.
Question 2: Can the owner move the shelving at the mezzanine next to the walls as discussed @ the walk thru.
Answer: Yes the owners will move the shelving on the mezzanine next to the wall as discussed.
Question 3: Will we have access to both areas at the same time.
Answer: Yes the contractor can have access to both areas at once.
Question: Does the CMU walls have to be patched even though they are being reframed and finished.
Answer: The intent of the patching of the CMU wall is to provide a good substrate to anchor to.
Any damage to the existing CMU greater than 3" in diameter created during the removal of the existing furring must be repaired.
Question: Are the existing CMU walls that do not have framing and drywall going to be repainted.
Answer: No, the intent is to color match.
Question: How are we to address overhead door coils attached to the walls, ductwork, plumbing & fire sprinklers that are surfaced mounted and not called out to be moved Answer: Any existing surface mounted ductwork, plumbing and fire alarm apparatus shall be temporarily suspended and re-installed after the sheetrock, insulation and furring strips have been replaced. Any item that cannot be temporarily suspended shall be removed, and reinstalled in its original location.
SARAH R. MARKOVICH
Contract Administrator
11 July 2018
File details come from the government source that posted it.