Question 1: I do not think 60 days is enough time to complete this project can it be 90-120 days?

Answer: The project timeline could be extended to 100 days.

Question 2: Can the owner move the shelving at the mezzanine next to the walls as discussed @ the walk thru.

Answer: Yes the owners will move the shelving on the mezzanine next to the wall as discussed.

Question 3: Will we have access to both areas at the same time.

Answer: Yes the contractor can have access to both areas at once.

Question: Does the CMU walls have to be patched even though they are being reframed and finished.

Answer: The intent of the patching of the CMU wall is to provide a good substrate to anchor to.

Any damage to the existing CMU greater than 3" in diameter created during the removal of the existing furring must be repaired.

Question: Are the existing CMU walls that do not have framing and drywall going to be repainted.

Answer: No, the intent is to color match.

Question: How are we to address overhead door coils attached to the walls, ductwork, plumbing & fire sprinklers that are surfaced mounted and not called out to be moved Answer: Any existing surface mounted ductwork, plumbing and fire alarm apparatus shall be temporarily suspended and re-installed after the sheetrock, insulation and furring strips have been replaced. Any item that cannot be temporarily suspended shall be removed, and reinstalled in its original location.