Attch_2_Submittal_Schedule.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Fire Suppression System Federal contract opportunity
Solicitation number
FA4626-15-R-0003
Issued by
Department of the Air Force Global Strike Command

About this file

Attch 2 Material Submittal

View the file

Other files for this federal contract opportunity

Other files attached to Fire Suppression System, newest first.
File Type Posted
SKMBT_42315030317050.pdf PDF
PreProposal_SiteVisit_Minutes.doc DOC document
Attch_4_Drawings.zip ZIP file
Solicitation.doc DOC document
Attch_6_Base_Entry_Policy_Letter.pdf PDF
Attch_5_Wage_Determination.pdf PDF
Attch_3_Schedule_of_Drawings.docx DOCX document
Attch_1_Specs.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 10-1024Fire Protection Building 1082FA4626-xx-x-xxxx
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1Section 01 00 00 - General Requirements
13.5 A. Red Lines4PTFI
23.5 B. As Built Field Data43 PTFA
33.7 Operating and Maintenance Instructions43 PTFA
43.8 B. Contractor Furnished Equipment List43 PTFA
53.8 C. Guarantees410 PTFA
63.9 Shop Drawings as Required by Technical Specifications410 PTSA
73.10 Start of Work Notification1PTSW
83.11 Notice of Final Inspection114 PTFI
93.12 Construction Near Utility Systems (AF Form 103)1PTSW
103.13 Utility Outage Notices114 PTO
113.17 B. Quality Control Plan4PTSW
123.17 D.Quality Control Records1EWD
1313.18 1354 Checklist (Property Inventory Checklist)4PTFI
153.20 Nuclear Densometers4PTSW
163.21 Project Sign4PTSW
17
18Section 01 00 10 - Security
191.1 A. Entry Authorization List4PTSW
20
21Section 01 30 00 - Administrative Requirements
223.1 D. Preconstruction Meeting MinutesPTSW
233.2 E. Progress MeetingsPTSW
243.3 A. Construction Progress Schedule (AF Form 3064)PTSW
25
26Section 01 36 00 - Environmental Protection
271.5 B. Demolition Activities Notification4PTSW
281.6 A. Environmental Protection and Waste Management Plan4PTSW
281.6 B. Monthly Report of Solid Waste Generation and Disposal4Monthly
291.6 C. Noise Level Report4Monthly
303.3 A.1. Construction Storm Water Notice of Intent4PTSW
313.3 A.2. Construction Storm Water Polution Prevention Plan4PTSW
323.3 B.3.Construction Storm Water Notice of Termination4PTSW
333.3 D. Construction Dewatering Permit4PTSW
343.6 and 3.7 Hazardous Materials Report EESOH-MIS 39524PTSW
353.10 C. Divert/Recycle Material Report4PTSW
363.11 E. and F. Recovered Materials Written Determination Form - 01 36 00 - 12.44PTSW
373.14 A.1 MDEQ Certification Letter for operation of a Public Water Supply or Wastewater System4SRO
383.14 A.2 Certified As-Builts Accepted by MDEQ4PTSA
39
40Section 03 31 00 - Structural Concrete
411.6 A. Product Data415 ANP
421.6 B. Samples43 PTP
431.6 C. Concrete Mix Design121 PTFU
441.6 D. Concrete Test Results436 HR ATT
45
46Section 21 13 13 - Wet Pipe Fire Sprinkler System
471.6 B. As-Built Plans1PTFA
483.3 C. Test Certificates4PTFA
491.7 A. Operation and Maintenance Manual4PTFA
50As-Built Drawings4PTFA
51As-Built Calculations4PTFA
52NFPA #254PTFA
53Materials4PTFA
54Manufacturers Instructions4PTFA
55Test Certificates4PTFA
56As-Built CD4PTFA
571.8 Training4AFI
581.9 Warranty4AFI
59
60Section 21 13 17 - Dry Pipe Fire Sprinkler System
611.6 B. As-Built Plans1PTFA
623.3 D. Test Certificates4PTFA
631.7 A. Operation and Maintenance Manual4PTFA
64As-Built Drawings4PTFA
65As-Built Calculations4PTFA
66NFPA #254PTFA
67Materials4PTFA
68Manufacturers Instructions4PTFA
69Test Certificates4PTFA
70As-Built CD4PTFA
711.8 Training4AFI
721.9 Warranty4AFI
73
74Section 26 42 00 - Cathodic Protection
754.4 Test Results and Drawing4PFI
76
77Section 28 31 74 - Interior Addressable Fire Alarm System
781.4.C., 1.4.I.a. Manufacturer's Authorization4PTSW
791.4.G., 1.4.I.b. Contractor License4PTSW
801.4.G., 1.4.I.c. Installers Licenses4PTSW
811.4.F., 1.4.J.a., 1.6 Red Line Asbuilt Drawings1PTFA
821.4.D., 1.4.J.b. Device List4PTFA
831.4 J.c., 3.4 Preliminary Test Report4PTFA
841.4.K.a., 1.8 Spare Parts4AFI
853.4 Final Test Reports4AFI
861.4.L.b., 1.7 Operation & Maintenance Manuals4AFI
871.4.L.c., 1.9 Training Attandance Record4AFI
881.4.L.d., 1.10 Letter of Warranty4
89
90Section 28 31 76 - Interior Mass Notification System
911.4.C., 1.4.I.a. Manufacturer's Authorization4PTSW
921.4.G., 1.4.I.b. Contractor License4PTSW
931.4.G., 1.4.I.c. Installers Licenses4PTSW
941.4.F., 1.4.J.a., 1.6 Red Line Asbuilt Drawings1PTFA
951.4.D., 1.4.J.b. Device List4PTFA
961.4 J.c., 3.4 Preliminary Test Report4PTFA
971.4.K.a., 1.8 Spare Parts4AFI
983.4 Final Test Reports4AFI
991.4.L.b., 1.7 Operation & Maintenance Manuals4AFI
1001.4.L.c., 1.9 Training Attandance Record4AFI
1011.4.L.d., 1.10 Letter of Warranty4
102
103Section 31 23 00 - Trench Excavation and backfill for Pipelines and Appurtenant structures
1041.4 Bedding Gradation and Atterberg Limits Lab Tests47 BD
1051.4 Native Soil Moisture Density Lab Tests47 PTFU
1061.4 Import Soils Moisture Density Lab Tests47 BD
107
108Section 31 23 23 - Flowable Fill
1091.6 A. Product Data415 ANP
1101.6 B. Material Sampling13 PTP
1111.6 C. Mix Design121 PTFU
112
113Section 31 23 25 - Excavation, Embankment, Fill, Backfill, and Compaction
1141.4 Native Soil Moisture Density Lab Tests4PTFU
1151.4 Sub-Excavation Replacement Soil Gradation and Atterberg Limits Lab Tests4BD
116
117Section 32 12 14 - Gravel Base Course (Crushed)
1181.4 Certified Gravel Gradation & Atterberg Limits415 PSW
1191.4 Gravel Moisture Density Lab Tests415 PSW
120
121Section 32 12 16 - Asphaltic Concrete Pavement
1221.4 A. Job Mix Formula415 ANP
1231.4 B. Bitument Test Reports43 PTFU
1241.4 C. Field Sample and Core Test Reports42 ATT
125
126Section 32 92 23 - Sodding
1273.2 Sod Certification4PSW
128
129Section 33 11 00 - Water Distribution
1301.4 Catalog Data415 ANP
131
Schedule of Abbreviations:
D - DaysATT - After Test is TakenPBC - Prior to Beginning ConstructionPT - Prior to Testing
AA - After AwardPSW - Prior to Start WorkPFI - Prior to Final InspectionPTP - Prior to Placement
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPNP - Prior to Notice to ProceedPTFU - Prior to First Planned Use
ANP - After Notice to ProceedBD - Before DeliveryPPC - Prior to Project CompletionPTE - Prior to Event
AR - After Receipt

&"Times New Roman,Regular"&12Attachment 2 &"Times New Roman,Regular"&12Title: Fire Protection-Building 1082 &"Times New Roman,Regular"&12FA4626-15-R-0003

&"Times New Roman,Regular"&12This list is not all inclusive. If needed, additional items may be added.

AF Form 66 &D &"Times New Roman,Regular"&12

SS-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .