Repair_Entrance_Bldg_500_Submittal_Schedule.xls

XLS spreadsheet 47 KB Posted

Attached to
Repair Entrance Bldg 500, Wing HQ
Solicitation number
FA4626-14-R-0027
Issued by

About this file

Attachment 2 Submittal Schedule

View the file

Other files

File Type Posted
Bldg_500_Questions_-_7-25-14.doc DOC document
C9.pdf PDF
Bldg_500_Questions_-_7-22-14.doc DOC document
B1.pdf PDF
Site_Visit_Minutes.pdf PDF
Attch_6_Base_Entry_Policy_Letter.pdf PDF
Attach_1_Specifications.zip ZIP file
FA4626-14-R-0027.doc DOC document
Attach_5_Wage_Determinations.pdf PDF
Attach_3_SCHEDULE_OF_DRAWINGS.doc DOC document
Attach_4_Drawings.zip ZIP file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 14-0020Repair Entrance Bldg 500, Wing HQFA4626-14-R-0027
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1GENERAL REQUIREMENTS 01 00 00 - 3.5; As Built Field Data23d PTFI
2GENERAL REQUIREMENTS 01 00 00 - 3.7; O & M Manuals3PTFA
3GENERAL REQUIREMENTS 01 00 00 - 3.8.1; Contractor Furnished Equipment List210d PTFI
4GENERAL REQUIREMENTS 01 00 00 - 3.8.2; Contractor Guarantees210d PTFI
5GENERAL REQUIREMENTS 01 00 00 - 3.11; Start of Work Notification15d PTSW
6GENERAL REQUIREMENTS 01 00 00 - 3.12; Notice of Final Inspection114d PTFI
7GENERAL REQUIREMENTS 01 00 00 - 3.13; Construction Near Utility Systems13d PTSW
8GENERAL REQUIREMENTS 01 00 00 - 3.14; Utility Outages114d PTSW
9GENERAL REQUIREMENTS 01 00 00 - 3.18.5; Quality Control Plan315d APA
10GENERAL REQUIREMENTS 01 00 00 -3.20; Form 1354 Checklist (Property Inventory Checklist)310d PTFI
11GENERAL REQUIREMENTS 01 00 00 -3.22; Nuclear Densometers130d PT use
12ENVIRONMENTAL PROTECTION 01 36 00 - 2.3 Environmental Permit Deliverables35d SRO
13ENVIRONMENTAL PROTECTION 01 36 00 - 4.3.A Stormwater Discharge Permit Compliance310d PTSW
14ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1 Hazardous Materials List Attachment 5310d SRO
15ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.2 Authorization Request Worksheets, AF Form 3952310d SRO
16ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4 Hazmat Final Report3PTFA
17ENVIRONMENTAL PROTECTION 01 36 00 - 11.3 Monthly Report of Solid Waste Disposal & Diversion Attachment 4310d SRO
18ENVIRONMENTAL PROTECTION 01 36 00 - 11.1.6 Non-Hazardous Solid Waste Diversion Report Attachment 1310d ANTP
19ENVIRONMENTAL PROTECTION 01 36 00 - 12.1.4 Recovered Materials Written Determination Form Attachment 2310d SRO
20ENVIRONMENTAL PROTECTION 01 36 00 - 12.5 Recycled Material Use Report Attachment 3310d SRO
21Standing Seam Metal Roof - Submittal #1 System Summary Sheet 07410-263333315d ANTP
22Standing Seam Metal Roof - Submittal #2 System Summary Sheet 07410-273333315d ANTP
23Standing Seam Metal Roof - Submittal #3 Appointment of Quality Controller Sheet 07410-29315d ANTP
24Standing Seam Metal Roof - Submittal #4 Labor and Material Warranty Sheet 07410-30315d ANTP
25Standing Seam Metal Roof - Submittal #5 Roof Panel Sample Identification Tags Sheet 07410-34115d ANTP
26Standing Seam Metal Roof - Submittal #6 As-Built Roof System Summary Sheet 07410-35315d ANTP
27Joint Sealer, 0790053315d ANTP
28Expansion Joint Cover Assemblies, 079513333315d ANTP
29Aluminum-Framed Storefronts, 084313333315d ANTP
30Glazed Aluminum Curtain Walls, 0844133333315d ANTP
31Glazing, 0880003315d ANTP
32Safety and Security Glazing Films33315d ANTP
33Painting and Coating33315d ANTP
34Painting and Coating33315d ANTP
35Cast-in-Place Concrete 033000, 1.3.C. Test Results315d ANTP
36Structural Steel 051200, 1.3.A. through E - Shop Drawings, Product Data, Mill Certs, Welder Certs33315d ANTP
37Helical Piers 056000, 1.3 A. through E. Installer Qualifications, Product Data, Certifications333315d ANTP
38Helical Piers 056000, 1.2 F. Installation record315d ANTP
39Helical Piers 056000, 1.2 J. Load Test3PTFI
40RACEWAYS AND FITTINGS 26 11 00 - 1.2315d ANTP
41CONDUCTORS 26 12 00 - 1.2315d ANTP
42BOXES 26 13 00 - 1.3315d ANTP
43CATHODIC PROTECTION 26 42 00 - 1.43333333*15d ANTP*Field quality report
44LIGHTING FIXTURES 26 50 00 - 1.1.D.315d ANTP
Schedule of Abbreviations:
AWC= After Work CompletedEWD= Each work day AF Form 3000 not requiredPTFP=Prior to Final Payment
PTSW= Prior to Starting WorkPTFA= Prior to Final AcceptancePTCW=Prior to Completing Work
AFA= After Final AcceptanceBMF=Before Material DeliveryAFI=After Final Inspection
PTO= Prior to OutageSN=Advance NotificationPT=Prior To
PTNT= Prior to Notice to ProceedSRO=After Each OccurrencePSSPer Submittal Schedule
ANTP= After Notice to ProceedPTFI=Prior to Final Inspection

Page &P&R&F &L&"Times New Roman,Regular"&12AF Form 66 02:

&F-&D&C&"Times New Roman,Regular"&12 SS-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .