Bldg_500_Questions_-_7-25-14.doc
DOC document 26 KB Posted
- Attached to
- Repair Entrance Bldg 500, Wing HQ
- Solicitation number
- FA4626-14-R-0027
About this file
Responses to Questions 25 Jul 14
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C9.pdf | ||
| Bldg_500_Questions_-_7-22-14.doc | DOC document | |
| B1.pdf | ||
| Site_Visit_Minutes.pdf | ||
| Attch_6_Base_Entry_Policy_Letter.pdf | ||
| Attach_1_Specifications.zip | ZIP file | |
| Repair_Entrance_Bldg_500_Submittal_Schedule.xls | XLS spreadsheet | |
| FA4626-14-R-0027.doc | DOC document | |
| Attach_5_Wage_Determinations.pdf | ||
| Attach_3_SCHEDULE_OF_DRAWINGS.doc | DOC document | |
| Attach_4_Drawings.zip | ZIP file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR ENTRANCE, BLDG 500, WING HQ
FA4626-14-R-0027
QUESTIONS & ANSWERS
25 JUL 14
Q1. Is electronic submission via your email address sufficient for the Proposal?
A1: No, please reference L-2-LPTA Section C.
Q2. Please provide additional clarification on the performance bond? Is it needed? For what amount?
A2: Yes, in the amount of the project (refer to FAR 52.228-15).
Q3. Does labor need to be open or closed shop?
A3: We do not dictate labor practices.
Q4. Are pictures of the existing conditions available?
A4: No pictures are available.
Q5. Did all bidding contractors need to be present at the walkthrough?
A5: No, site visit was not mandatory.
File details come from the government source that posted it. Updated .