Attachment 2 Material Submittal

View the file

Other files for this federal contract opportunity

Other files attached to Repair Launch Facility Fuel Tank Venting, newest first.
File Type Posted
NZAS_97-2007_slideshow.pptx PPTX presentation
Site_Visit.pdf PDF
Attch_5-3_Wage_Determination.docx DOCX document
Attch_5-2_Wage_Determination.docx DOCX document
Attch_5-1_Wage_Determination.docx DOCX document
Attch_1_Specifications.zip ZIP file
Solicitation.doc DOC document
Attch_3_Schedule_of_Drawings.pdf PDF
Attch_6_Base_Entry_Policy_Letter.pdf PDF
Attch_4_Drawings.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 97-2007BRepair LF Fuel Tank VentingFA4626 14 R 0009
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE TO MISSILE ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1GENERAL REQUIREMENTS 01 00 00 - 1.8.A and 3.13.B Quality Control Plan410d ANTP
2GENERAL REQUIREMENTS 01 00 00 - 1.8.A Contractor Design Drawings110d ANTP
3GENERAL REQUIREMENTS 01 00 00 - 1.8.A MDEQ Permits445d AFIFor each LF site
4GENERAL REQUIREMENTS 01 00 00 - 1.8.A and 3.16.A As-Built Drawings445d AFI
5GENERAL REQUIREMENTS 01 00 00 - 1.8.A and 3.27 O&M Manuals (AF Form 3000)445d AFI
6GENERAL REQUIREMENTS 01 00 00 - 1.8.A and 3.21.A Work Clearance Request (AF Form 103)43d PTOFor each LF site
7GENERAL REQUIREMENTS 01 00 00 - 1.8.A and 3.11.A Utility Outages410d PTO
8GENERAL REQUIREMENTS 01 00 00 - 1.8.A Transfer & Acceptance of Military Real Property Form (DD 1354)430d PTFPFor each LF site
9GENERAL REQUIREMENTS 01 00 00 - 3.6 Construction Work Schedule4*5d PNTP* Tentative Work Schedule at Pre-Performance Meeting
10GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of Work Notification46d PTSW
11ENVIRONMENTAL PROTECTION 01 36 00 - 2.2 Environmental Permit Deliverables45d SRO
12ENVIRONMENTAL PROTECTION 01 36 00 - 4.3.A Stormwater Discharge Permit Compliance410d PTSW
13ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.A Hazardous Materials List Attachment 5430d PTSW
14ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.B Authorization Request Worksheets, AF Form 3952410d SRO
15ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.D Hazmat Final Report4PTFA
16ENVIRONMENTAL PROTECTION 01 36 00 - 10.4 Non-Hazardous Solid Waste Diversion Report410d ANTP
17ENVIRONMENTAL PROTECTION 01 36 00 - 11.1 Recycled Material Use Report Attachment 3410d SRO
18SELECTIVE DEMOLITION 017320 - 1.5.B. Schedule of Selective Demolition Activities.410d PTSW
19ROUND CONCRETE COLUMN FORMS 03 10 50 - 1.4.B. Manufacturer's product data.415d ANTP
20CAST-IN-PLACE CONCRETE 03 30 00 - 1.4 .B. Manufacturer's product data.415d ANTP
21FUEL-OIL STORAGE TANK PIPING AND MONITORING/ LEAK DETECTION SYSTEM 23 11 13 - 1.4.A.2. Installer Credentials115d ACA
22FUEL-OIL STORAGE TANK PIPING AND MONITORING/ LEAK DETECTION SYSTEM 23 11 13 - 1.4.B. Product Data415d ANTP
23FUEL-OIL STORAGE TANK PIPING AND MONITORING/ LEAK DETECTION SYSTEM 23 11 13 - 1.5. Field Quality Reports & Warranty1145d AFI
24FUEL-OIL STORAGE TANK PIPING AND MONITORING/ LEAK DETECTION SYSTEM 23 11 13 - 1.6. Close-out Submittals (Emergency, O&M Manuals)4445d AFI
25PIPING SUMP MODIFICATION AND WATER-TIGHTNESS TESTING 23 11 15 - 1.4.B. Fiberglass Lay-up415d ANTP
26PIPING SUMP MODIFICATION AND WATER-TIGHTNESS TESTING 23 11 15 - 1.4.C. Installer Credentials115d ACA
27GENERAL PROVISIONS FOR ELECTRICAL WORK - 26 00 00 - 1.20 (As-Built Drawings)445d AFI
28GENERAL PROVISIONS FOR ELECTRICAL WORK - 26 00 00 - 2.1.B.2 Product Data445d AFI
29RACEWAYS AND FITTINGS 26 11 00 - 1.2 Product Data415d ANTP
30CONDUCTORS 26 12 00 - 1.2 Product Data415d ANTP
31SHIELDED SHRINK TUBING 26 12 50 - 1.2 Product Data415d ANTP
32BOXES 26 13 00 - 1.3 Product Data415d ANTP
33EARTHWORK 31 23 00 - 2.4, 3.4 Manufacturer's product data for Geotextile and Marking Tape415d ANTP
Schedule of Abbreviations:
AWC= After Work CompletedPTFA= Prior to Final AcceptancePTCW=Prior to Completing Work
PTSW= Prior to Starting WorkACA=After Contract AwardAFI=After Final Inspection
AFA= After Final AcceptanceBMF=Before Material DeliveryPT=Prior To
PTO= Prior to OutageSN=Advance NotificationPSS=Per Submittal Schedule
PTNP= Prior to Notice to ProceedSRO=After Each Occurrence
ANTP= After Notice to ProceedPTFI=Prior to Final Inspection
EWD= Each work day AF Form 3000 not requiredPTFP=Prior to Final Payment

&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12Repair LF Fuel Tank Venting &L&"Times New Roman,Regular"&12AF Form 66 02:

&F-&D&C&"Times New Roman,Regular"&12 SS-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .