| File | Type | Posted |
|---|---|---|
| Question.docx | DOCX document | |
| Answers to Questions 3080 1.docx | DOCX document | |
| Pre-Proposal Site Visit Minutes.doc | DOC document | |
| 5.pdf | ||
| Attachment 5 Wage Determination.docx | DOCX document | |
| Specifications.zip | ZIP file | |
| Building 6-26.docx | DOCX document | |
| Attachment 4 Drawings.zip | ZIP file | |
| Attachment 6 Past and Present Performance Questionnaire.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| 3080drawingindex.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 04-1051 | Renovate Exterior Building 3080 | FA4624-09-R-0038 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST REPORTS | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | AS-BUILT FIELD DATA 01000-3.4.2 | 4 | 3 PTFI | ||||||||||||||||||
| 2 | OPERATION AND MAINTENANCE MANUAL 01000-3.6 | 4 | 10 PTFA | ||||||||||||||||||
| 3 | EQUIPMENT LIST 01000-3.7.1 | 4 | 10 PTFA | ||||||||||||||||||
| 4 | GUARANTEES 01000-3.7.2 | 4 | 10 PTFA | ||||||||||||||||||
| 5 | QUALITY CONTROL PLAN 01000-3.17.4 | 4 | 14 PTSA | ||||||||||||||||||
| 6 | 1354 PROPERTY INVENTORY CHECKLIST 01000-3.18 | 4 | 15 ANT | ||||||||||||||||||
| 7 | HAZARDOUS MATERIAL LIST 01000-3.22.3.1 | 4 | 10 PTFA | ||||||||||||||||||
| 8 | QUALITY CONTROL REPORT 01000 ATTACHMENT 1 | 4 | 15 ANT | ||||||||||||||||||
| 9 | RECYCLED MATERIAL USE REPORT 01000-Attachment 2 | 4 | 10 PTFA | ||||||||||||||||||
| 10 | WASTE MANAGEMENT PLAN 01360 | 4 | 10 PTFA | ||||||||||||||||||
| 11 | SOLID WASTE DISPOSAL RECORDS 01360-1.5.A | 4 | 20 ANTP | ||||||||||||||||||
| 12 | IMPLEMENTATION & TERMINATION SCHEDULE 01500-3.5.D | 4 | |||||||||||||||||||
| 13 | SCHEDULE OF SELECTIVE DEMOLITION 02070-1.4.C | 4 | |||||||||||||||||||
| 13 | PRODUCT DATA 02370 - PART 8 &9 INSTALLATION RECORDS & TESTING | 4 | |||||||||||||||||||
| 14 | PRODUCT DATA 02741 - 1.4 | 4 | |||||||||||||||||||
| 15 | PRODUCT DATA 2840 - | 4 | |||||||||||||||||||
| 16 | PRODUCT DATA LITERATURE 03300-1.3.C | 4 | |||||||||||||||||||
| 17 | PRODUCT TEST REPORTS 03300-1.3.F | 4 | |||||||||||||||||||
| 18 | QUALITY CONTROLS REPORT 03300-1.3.G | 4 | |||||||||||||||||||
| 19 | PLANT CAST ARCHITECTURAL CONCRETE 03450-1.4 | 4 | |||||||||||||||||||
| 20 | PRODUCT DATA LITERATURE 04200-1.3.B | 4 | |||||||||||||||||||
| 21 | PRODUCT CERTIFICATE 04200-1.3.D | 4 | |||||||||||||||||||
| 22 | PRODUCT TEST REPORTS 04200-2.14.A | 4 | |||||||||||||||||||
| 23 | QUALIFICATION DATA LITERATURE 04200-3.11.A | 4 | |||||||||||||||||||
| 24 | PRODUCT DATA 05120-1.2.D | 4 | |||||||||||||||||||
| 25 | PRODUCT DATA 05310-1.3 | 4 | |||||||||||||||||||
| 26 | PRODUCT DATA LITERATURE 05500-1.3.B | 4 | |||||||||||||||||||
| 27 | SHOP DRAWINGS 05500-1.3.C | 4 | |||||||||||||||||||
| 28 | PRODUCT DATA LITERATURE 06100-1.3.B | 4 | |||||||||||||||||||
| 29 | PRODUCT DATA LITERATURE 07241-1.5.B | 4 | |||||||||||||||||||
| 30 | SHOP DRAWINGS 07241-1.5.C | 4 | |||||||||||||||||||
| 31 | INITIAL SELECTION SAMPLES 07241-1.5.D | 4 | |||||||||||||||||||
| 32 | PRODUCT TEST REPORTS 07241-1.5.H | 4 | |||||||||||||||||||
| 32 | QUALIFICATIONS FOR AWARD OF CONTRACT LITERATURE 07241-1.5.G | 4 | |||||||||||||||||||
| 33 | INSULATED PREFINISHED METAL PANELS SUBMITALS 1.5 | 4 | 4 | 4 | |||||||||||||||||
| 34 | QUALIFICATION DATA LITERATURE FOR EPDM ROOF SYSTEM 07550 | 4 | 4 | ||||||||||||||||||
| 35 | REISSUED WARRANTY 07550 | 4 | |||||||||||||||||||
| 36 | PRODUCT DATA LITERATURE 07620-1.4.B | 4 | |||||||||||||||||||
| 37 | SHOP DRAWINGS 07620-1.4.C | 4 | |||||||||||||||||||
| 38 | PRODUCT SAMPLES 07620-1.4.D | 4 | |||||||||||||||||||
| 39 | PRODUCT DATA LITERATURE 07920 | 4 | |||||||||||||||||||
| 40 | PRODUCT TEST REPORTS 07920 | 4 | |||||||||||||||||||
| 41 | SUBMITTALS FOR STEEL DOORS AND FRAMES 08110 - 1.2 | 4 | 4 | ||||||||||||||||||
| 42 | SHOP DRAWINGS 08411-1.4C | 4 | |||||||||||||||||||
| 43 | HARDWARE SCHEDULE 08411-1.4D | 4 | |||||||||||||||||||
| 44 | TECHNICAL PRODUCT DATA - MANUFACTURER LITERATURE 08520-1.4.A | 4 | |||||||||||||||||||
| 45 | SHOP DRAWINGS 08520-1.4.B | 4 | |||||||||||||||||||
| 46 | MANUFACTURER PRODUCT SAMPLES 08520-1.4.C | 4 | |||||||||||||||||||
| 47 | MANUFACTURER PRODUCT DATA LITERATURE 08711-1.2.B | 4 | |||||||||||||||||||
| 48 | FINAL HARDWARE SCHEDULE 08711-1.2.F | 4 | |||||||||||||||||||
| 49 | PRODUCT DATA SAMPLES 08711-1.2.E | 4 | |||||||||||||||||||
| 50 | PRODUCT DATA LITERATURE 08800-1.4.B | 4 | |||||||||||||||||||
| 51 | MANUFACTURER WARRANTY 08800-1.8.B | 4 | |||||||||||||||||||
| 52 | PRODUCT DATA LITERATURE 09255-1.4.C | 4 | |||||||||||||||||||
| 53 | SHOP DRAWINGS 09255-1.4.D | 4 | |||||||||||||||||||
| 54 | PRODUCT CERTIFICATE 09255-1.4.E | 4 | |||||||||||||||||||
| 55 | MATERIAL LIST LITERATURE 09900-1.3.B.1 | 4 | |||||||||||||||||||
| 56 | PRODUCT DATA MANUFACTURERS LITERATURE 09900-1.3.B | 4 | |||||||||||||||||||
| 57 | QUALIFICATION DATA LITERATURE 09900-1.3.D | 4 | |||||||||||||||||||
| 58 | PRODUCT DATA 15820-1.2.B | 4 | |||||||||||||||||||
| 59 | PRODUCT DATA LITERATURE 16130-1.4.A&B | 4 | |||||||||||||||||||
| 60 | SHOP DRAWINGS 16130-1.4.C | 4 | |||||||||||||||||||
| 61 | COORDINATION DRAWINGS 16130-1.4.D | 4 | |||||||||||||||||||
| 62 | TEST REPORTS 16130-1.4.E | 4 | |||||||||||||||||||
| 63 | PRODUCT DATA LITERATURE 16140-1.4.A&B | 4 | |||||||||||||||||||
| 64 | SHOP DRAWINGS 16140-1.4.C | 4 | |||||||||||||||||||
| 65 | MAINTENANCE DATA 16140-1.4.D | 4 | |||||||||||||||||||
| 66 | PRODUCT DATA LITERATURE 16410-1.3.A&B | 4 | |||||||||||||||||||
| 67 | SHOP DRAWINGS 16410-1.3.C | 4 | |||||||||||||||||||
| 68 | MAINTENANCE DATA 16410-1.3.D | 4 | |||||||||||||||||||
| 69 | PRODUCT DATA LITERATURE 16420-1.3.A&B | 4 | |||||||||||||||||||
| 70 | SHOP DRAWINGS 16420-1.3.C | 4 | |||||||||||||||||||
| 71 | QUALIFICATION DATA 16420-1.3.D | 4 | |||||||||||||||||||
| 72 | FIELD TEST REPORTS 16420-1.3.E | 4 | |||||||||||||||||||
| 73 | OPERATION & MAINTENANCE DATA 16420-1.3.F | 4 | |||||||||||||||||||
| 74 | LOAD-CURRENT AND OVERLOAD RELAY HEATER LIST 16420-1.3.G | 4 | |||||||||||||||||||
| 75 | PRODUCT DATA LITERATURE 16442-1.3.A | 4 | |||||||||||||||||||
| 76 | SHOP DRAWINGS 16442-1.3.B | 4 | |||||||||||||||||||
| 77 | PANELBOARD SCHEDULES 16442-1.3.C | 4 | |||||||||||||||||||
| 78 | MAINTENANCE DATA LITERATURE 16442-1.3.D | 4 | |||||||||||||||||||
| 79 | PRODUCT DATA LITERATURE 16460-1.3.A | 4 | |||||||||||||||||||
| 80 | OPERATION & MAINTENANCE DATA 16460-1.3.B | 4 | |||||||||||||||||||
| 81 | OIL ANALYSIS REPORT 16460-1.3.C | 4 | |||||||||||||||||||
| 82 | PENTAHEAD SOCKETS 16460-1.3.D | 4 | |||||||||||||||||||
| 83 | LABELED IMPEDANCE VALUE 16460-1.4.E | 4 | |||||||||||||||||||
| 84 | PRODUCT DATA LITERATURE 16491-1.2.A&C | 4 | |||||||||||||||||||
| 85 | PRODUCT DATA LITERATURE 16511-1.3.A&B | 4 | |||||||||||||||||||
| 86 | SHOP DRAWINGS 16511-1.3.C | 4 | |||||||||||||||||||
| 87 | PRODUCT CERTIFICATES 16511-1.3.D | 4 | |||||||||||||||||||
| 88 | MAINTENANCE DATA LITERATURE 16511-1.3.E | 4 | |||||||||||||||||||
| 89 | PRODUCT DATA LITERATURE 16721-1.4.A&B | 4 | |||||||||||||||||||
| 90 | SHOP DRAWINGS 16721-1.4.C | 4 | |||||||||||||||||||
| 91 | PRODUCT CERTIFICATES 16721-1.4.D | 4 | |||||||||||||||||||
| 92 | INSTALLER CERTIFICATES 16721-1.4.E | 4 | |||||||||||||||||||
| FIELD TEST REPORTS 16721-1.4.F | 4 | ||||||||||||||||||||
| CERTIFICATE OF COMPLETION 16721-1.4.G | 4 | ||||||||||||||||||||
| Schedule of Abbreviations | |||||||||||||||||||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | SN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PT | = | Prior To | |||||||||||||||||
| ACA | = After Contract Award |
&L&"Times New Roman,Regular"&12AF Form 66
02: 000510_AC01_00_90-
&F-&D&C&"Times New Roman,Regular"&12SS-&P&RR:\specs\malm2005\B1156\&F
File details come from the government source that posted it. Updated .