Question.docx
DOCX document 10 KB Posted
- Solicitation number
- FA4626-09-R-0038
About this file
Response to question regarding proposal requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answers to Questions 3080 1.docx | DOCX document | |
| Pre-Proposal Site Visit Minutes.doc | DOC document | |
| 5.pdf | ||
| Attachment 5 Wage Determination.docx | DOCX document | |
| Specifications.zip | ZIP file | |
| Building 6-26.docx | DOCX document | |
| Attachment 4 Drawings.zip | ZIP file | |
| Attachment 6 Past and Present Performance Questionnaire.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| 3080drawingindex.pdf | ||
| Subschedule-B3080.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question: Specification section 07550; 1.2 Submittals; B.1 and B.2: Submittal information requires the roof submittals to be submitted with the Bid Proposal. Please confirm that this information does in fact need to be submitted with the Bid Proposal. Submittal information requires knowledge of the existing EPDM System. This information is not provided in the bid documents. Please clarify.
Answer: This information will not be required at the time of proposal closing. The government will provide the information after this project is awarded, and this information will be submitted and approved prior to the commencement of construction.