Questions and Responses.doc

DOC document 28 KB Posted

Attached to
RECOVERY-- NZAS972009 - Maintain Erosion & Drainage, Missile Alert Fac
Solicitation number
FA4626-09-R-0013
Issued by

View the file

Other files

File Type Posted
Questions and responses 2.docx DOCX document
Pre-Proposal Site Visit Minutes.doc DOC document
New Site Pictures.pptx PPTX presentation
CEM Missile Mileage Chart.xls XLS spreadsheet
Amendment 0004.doc DOC document
Amendment 0003.doc DOC document
Amendment 0002.doc DOC document
Recovery - 09-R-0013, Amend 0001.doc DOC document
Solicitation Document.doc DOC document
Attachment 4 Drawings PDFS.zip ZIP file
Attachment 3 Schedule of Drawings.docx DOCX document
Attachment 6 Past Performance Survey.docx DOCX document
Attachment 5 Wage Determination.docx DOCX document
Attachement 2 Submittal Schedule.xlsx XLSX spreadsheet
Attachement 1 Specs.zip ZIP file
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q - Are there hazmat materials on the MAF sites that we are going to need to remove? I didn't see anything on the plans, but in the specs they are mentioned quite a lot.

A - There are no hazmat materials on the sites that will need to be removed in this project. The environmental specification section is a standard specification that is included in all projects and not all sections apply.

Q - According to the plans only 6 out of 15 culverts need screens. Is this correct or do we need to install screens on every culvert?

A - Only install screens on the culverts noted on the plans.

Q - We need sizes of all culverts at MAF sites.

A - Alpha-01: 18"

Delta -01: Cleaning Only - 10", 18" and 24", With Screens - 18"

Foxtrot-01: Cleaning Only - 18", With Screens - 18" and 18"

Golf-01: 18"

Juliet-01: 15" and 18"

Hotel-01: 18"

Kilo-01: Cleaning Only - 18", With Screens - 18"

Lima-01: 18"

Q - For MAF D-1 what type of barbed wire do we need to use?

A - Zinc or aluminum-coated, double strand, 12-1/2 gauge, twisted, 2-point barbed wire.

Q - Are lagoons filled with sewage?

A - Yes

Q - Do we need to remove any sewage?

A - No

Q - Will locates of utilities be performed by the gov prior to excavations?

A - Locates inside the fence or of government utilities will be completed by the government prior to excavations. Non-government locates will still have to be performed by calling 811 locate service.

Q - How is payment handled?

A - Payment is handled electronically, through wide area workflow (Clause 252.232-7003, page 10 of the solicitation)

Q - Do we get paid for each site separately as we complete them?

A - You will submit invoices into Wide Area Workflow for payment monthly.

Q - What do you need from us before we submit the bid?

A - Please read sections K, L and M of the solicitation, L-501 and L-505 outline submission requirements

Q - Do you need a separate price for each MAF site or a lump sum for all MAF sites?

A - Please fill in the bid schedule, section B of the solicitation, pages 3 through 6