Questions and Responses.doc
DOC document 28 KB Posted
- Solicitation number
- FA4626-09-R-0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and responses 2.docx | DOCX document | |
| Pre-Proposal Site Visit Minutes.doc | DOC document | |
| New Site Pictures.pptx | PPTX presentation | |
| CEM Missile Mileage Chart.xls | XLS spreadsheet | |
| Amendment 0004.doc | DOC document | |
| Amendment 0003.doc | DOC document | |
| Amendment 0002.doc | DOC document | |
| Recovery - 09-R-0013, Amend 0001.doc | DOC document | |
| Solicitation Document.doc | DOC document | |
| Attachment 4 Drawings PDFS.zip | ZIP file | |
| Attachment 3 Schedule of Drawings.docx | DOCX document | |
| Attachment 6 Past Performance Survey.docx | DOCX document | |
| Attachment 5 Wage Determination.docx | DOCX document | |
| Attachement 2 Submittal Schedule.xlsx | XLSX spreadsheet | |
| Attachement 1 Specs.zip | ZIP file |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q - Are there hazmat materials on the MAF sites that we are going to need to remove? I didn't see anything on the plans, but in the specs they are mentioned quite a lot.
A - There are no hazmat materials on the sites that will need to be removed in this project. The environmental specification section is a standard specification that is included in all projects and not all sections apply.
Q - According to the plans only 6 out of 15 culverts need screens. Is this correct or do we need to install screens on every culvert?
A - Only install screens on the culverts noted on the plans.
Q - We need sizes of all culverts at MAF sites.
A - Alpha-01: 18"
Delta -01: Cleaning Only - 10", 18" and 24", With Screens - 18"
Foxtrot-01: Cleaning Only - 18", With Screens - 18" and 18"
Golf-01: 18"
Juliet-01: 15" and 18"
Hotel-01: 18"
Kilo-01: Cleaning Only - 18", With Screens - 18"
Lima-01: 18"
Q - For MAF D-1 what type of barbed wire do we need to use?
A - Zinc or aluminum-coated, double strand, 12-1/2 gauge, twisted, 2-point barbed wire.
Q - Are lagoons filled with sewage?
A - Yes
Q - Do we need to remove any sewage?
A - No
Q - Will locates of utilities be performed by the gov prior to excavations?
A - Locates inside the fence or of government utilities will be completed by the government prior to excavations. Non-government locates will still have to be performed by calling 811 locate service.
Q - How is payment handled?
A - Payment is handled electronically, through wide area workflow (Clause 252.232-7003, page 10 of the solicitation)
Q - Do we get paid for each site separately as we complete them?
A - You will submit invoices into Wide Area Workflow for payment monthly.
Q - What do you need from us before we submit the bid?
A - Please read sections K, L and M of the solicitation, L-501 and L-505 outline submission requirements
Q - Do you need a separate price for each MAF site or a lump sum for all MAF sites?
A - Please fill in the bid schedule, section B of the solicitation, pages 3 through 6