Attachement 2 Submittal Schedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
RECOVERY-- NZAS972009 - Maintain Erosion & Drainage, Missile Alert Fac
Solicitation number
FA4626-09-R-0013
Issued by

About this file

Submittal Schedule

View the file

Other files

File Type Posted
Questions and responses 2.docx DOCX document
Pre-Proposal Site Visit Minutes.doc DOC document
New Site Pictures.pptx PPTX presentation
CEM Missile Mileage Chart.xls XLS spreadsheet
Amendment 0004.doc DOC document
Questions and Responses.doc DOC document
Amendment 0003.doc DOC document
Amendment 0002.doc DOC document
Recovery - 09-R-0013, Amend 0001.doc DOC document
Solicitation Document.doc DOC document
Attachment 4 Drawings PDFS.zip ZIP file
Attachment 3 Schedule of Drawings.docx DOCX document
Attachment 6 Past Performance Survey.docx DOCX document
Attachment 5 Wage Determination.docx DOCX document
Attachement 1 Specs.zip ZIP file
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject Number: NZAS 97-2009Project Title: Repair Erosion and Drainage, MAFsSolicitation/Contract No. FA4626-09-R-0013
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNumber of Copies RequiredREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
CERTIFICATON OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHER
APPROVEDDIS- APPROVED
1Work Schedule 01000 3.4A10 D ANP
2Start of Work Notification 01000 3.616 D PSW
3Utility Outage Notices 01000 3.9110 D PSW
4Quality Control Plan 01000 3.11B110 D ANP
5As-Built Field Drawings 01000 3.14D110 D AFI
6As-Built Contract Drawings 01000 3.14E145 D AFI
7Nuclear Densometer Permit 01000 3.22410 D PSW
8Notice of Final Inspection and Acceptance 01000 3.2443 D PFI
10EAL Data List and Letters 01001 3.1415 D PSW
18Geotextile Sample 02110 1.3110 D BD
19Geotextile Certificate of Compliance 02110 1.3110 D BD
21Native Soils Moisture Density Test Results (Proctor) 02230 1.415 D PT
22Field Density Test Results 02230 1.415 D PSW
23Certified Gravel Gradation Test Results 02235 1.3115 D PSW
24Gravel Moisture Density Test (Proctor) 02235 1.315 D PT
25Gravel Compaction Test Results 02235 1.315 D PT
26Seed Purity Analysis, Germination Test Results and Seed Mixture Certification 02910 1.2115 D ANP
27Erosion Blanket Materials and Certificate of Compliance 02915 1.2110 D BD
28Reinforcing Steel Shop Details 03210 1.3115 D ANP
29Concrete Data, Mix Design 03310 1.615 D ANP
30Concrete Test Results 03310 1.613 D ATT
Schedule of Abbreviations:
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning Construction

Attachment 2 FA4626-09-R-0013

&9This list is not all inclusive. If needed, additional items may be added. SS-&P