Attach 2 Submittal Schedule.xls

XLS spreadsheet 25 KB Posted

Attached to
RECOVERY-- NZAS991030 - Repair Weapons Storage Area Exterior Walls
Solicitation number
FA4626-09-R-0009
Issued by

About this file

Submittal Schedule

View the file

Other files

File Type Posted
Question response —
Drawings Bldg Height PDF.zip ZIP file
Question response.doc DOC document
Drawings PDF.zip ZIP file
Amendment 3.doc DOC document
Recovery - 09-R-0009, Amend 2.doc DOC document
Recovery - 09-R-0009, Amend 0001.doc DOC document
Attach 4 Drawings.zip ZIP file
Attach 5 Wage Determination.docx DOCX document
Solicitation.doc DOC document
Attach 6 Past Performance.docx DOCX document
Attach 1 Specs.zip ZIP file
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 99-1030Repair Exterior Walls WSA
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 1 - GENERAL
101000 3.5.2, As-Built Field Data23 D PFI
201000 3.5.3.1, Names of Drafters13 D PWS
301000 3.5.4, Final As-Built Drawings230 D AFI
401000 3.7/3.10 Shop Drawings / Submittals415 D PBC
501000 3.12.2 Contractors Quality Control Plan415 D PBC
601001 3.1.3.5 Personnel List17 D PBC
701360 10.1.3 HAZMAT14D BD
801360 11.5.6 Solid Waste110 PFT
901360 7.1.2 MSDS/395211 PBC
1001360 7.1.6 HAZMART11 PPC
1101360 12.3 Material & Product11 PPC
DIVISION 4 - MASONRY
1204200 3.2 Block Filler410 D PBC
134200 3.3 Paintable Silicone410 D PBC
1404200 3.4 Mortar410 D PBC
1504200 3.4.1 Portland Cement410 D PBC
1604200 3.4.2 Hydrated Lime410 D PBC
1704200 3.4.3 Quicklime410 D PBC
1804200 3.4.4 Masonry Cement410 D PBC
1904200 3.4.5 Sand410 D PBC
DIVISION 9 - FINISHES
2009913 3.1 Primer410 D PBC
2109913 3.1 Paint410 D PBC
2209913 3.2 Masonry Sealant410 D PBC
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning Construction

&L&"Times New Roman,Regular"&12 Attachment 2&R&"Times New Roman,Regular"&12FA4626-09-R-0009 &L&"Times New Roman,Regular"AF Form 66

02: 000510_AC01_00_90-

&F-&D&C&"Times New Roman,Regular"&12SS-&P of &N

File details come from the government source that posted it. Updated .