Attach 2 Submittal Schedule.xls
XLS spreadsheet 25 KB Posted
- Solicitation number
- FA4626-09-R-0009
About this file
Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question response | — | |
| Drawings Bldg Height PDF.zip | ZIP file | |
| Question response.doc | DOC document | |
| Drawings PDF.zip | ZIP file | |
| Amendment 3.doc | DOC document | |
| Recovery - 09-R-0009, Amend 2.doc | DOC document | |
| Recovery - 09-R-0009, Amend 0001.doc | DOC document | |
| Attach 4 Drawings.zip | ZIP file | |
| Attach 5 Wage Determination.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| Attach 6 Past Performance.docx | DOCX document | |
| Attach 1 Specs.zip | ZIP file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | |||||||||||||||||
| NZAS 99-1030 | Repair Exterior Walls WSA | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | |||||||||||||||||||
| Number of Copies Required | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| DIVISION 1 - GENERAL | ||||||||||||||||||||
| 1 | 01000 3.5.2, As-Built Field Data | 2 | 3 D PFI | |||||||||||||||||
| 2 | 01000 3.5.3.1, Names of Drafters | 1 | 3 D PWS | |||||||||||||||||
| 3 | 01000 3.5.4, Final As-Built Drawings | 2 | 30 D AFI | |||||||||||||||||
| 4 | 01000 3.7/3.10 Shop Drawings / Submittals | 4 | 15 D PBC | |||||||||||||||||
| 5 | 01000 3.12.2 Contractors Quality Control Plan | 4 | 15 D PBC | |||||||||||||||||
| 6 | 01001 3.1.3.5 Personnel List | 1 | 7 D PBC | |||||||||||||||||
| 7 | 01360 10.1.3 HAZMAT | 1 | 4D BD | |||||||||||||||||
| 8 | 01360 11.5.6 Solid Waste | 1 | 10 PFT | |||||||||||||||||
| 9 | 01360 7.1.2 MSDS/3952 | 1 | 1 PBC | |||||||||||||||||
| 10 | 01360 7.1.6 HAZMART | 1 | 1 PPC | |||||||||||||||||
| 11 | 01360 12.3 Material & Product | 1 | 1 PPC | |||||||||||||||||
| DIVISION 4 - MASONRY | ||||||||||||||||||||
| 12 | 04200 3.2 Block Filler | 4 | 10 D PBC | |||||||||||||||||
| 13 | 4200 3.3 Paintable Silicone | 4 | 10 D PBC | |||||||||||||||||
| 14 | 04200 3.4 Mortar | 4 | 10 D PBC | |||||||||||||||||
| 15 | 04200 3.4.1 Portland Cement | 4 | 10 D PBC | |||||||||||||||||
| 16 | 04200 3.4.2 Hydrated Lime | 4 | 10 D PBC | |||||||||||||||||
| 17 | 04200 3.4.3 Quicklime | 4 | 10 D PBC | |||||||||||||||||
| 18 | 04200 3.4.4 Masonry Cement | 4 | 10 D PBC | |||||||||||||||||
| 19 | 04200 3.4.5 Sand | 4 | 10 D PBC | |||||||||||||||||
| DIVISION 9 - FINISHES | ||||||||||||||||||||
| 20 | 09913 3.1 Primer | 4 | 10 D PBC | |||||||||||||||||
| 21 | 09913 3.1 Paint | 4 | 10 D PBC | |||||||||||||||||
| 22 | 09913 3.2 Masonry Sealant | 4 | 10 D PBC | |||||||||||||||||
| D - Days | PSW - Prior to Start Work | PFI - Prior to Final Inspection | ||||||||||||||||||
| AFI - After Final Inspection | BBCW - Before Beginning Concrete Work | PPC - Prior to Project Completion | ||||||||||||||||||
| ANP - After Notice to Proceed | BD - Before Delivery | PT - Prior to Testing | ||||||||||||||||||
| ATT - After Test is Taken | PBC - Prior to Beginning Construction |
&L&"Times New Roman,Regular"&12 Attachment 2&R&"Times New Roman,Regular"&12FA4626-09-R-0009 &L&"Times New Roman,Regular"AF Form 66
02: 000510_AC01_00_90-
&F-&D&C&"Times New Roman,Regular"&12SS-&P of &N
File details come from the government source that posted it. Updated .