Submittal Schedule

View the file

Other files

File Type Posted
2 QUESTION RESPONSE.docx DOCX document
Amendment 2.doc DOC document
Wage Det 8 May.docx DOCX document
Amendment 1.doc DOC document
1 QUESTION RESPONSE.docx DOCX document
Attach 4 Drawings.zip ZIP file
Attach 6 Past Performance.docx DOCX document
Attach 5 Wage Determination.docx DOCX document
Attach 3 Schedule of Drawings.docx DOCX document
Solicitation.doc DOC document
Attach 1 Specifications.zip ZIP file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2F24604 09 R-0008
SUBMITTAL SCHEDULE
New Generators Wing I MAFS
CDR = Calendar Days after ReceiptPSW = Prior to Start of WorkATOS = After Taking SamplePFA = Prior to Final Acceptance
ANTP = After Notice to ProceedPTS = Prior To ShipmentPTI = Prior To Installation

PSW = Prior to Start of Work PTI = Prior To Installation Sample

PTS = Prior To Shipment PFA = Prior to Final Acceptance ATOS = After Taking Sample

SCHEDULED DATES

1
2
3
4
5
6
7
8
9
10
11
Sub.
Spec. Sec.-
Type
No. of
Date
Date
Date
To Contr.
Resubmittal
ID
Page No. &
of
Description of Material
Sub
Rec. Fr.
to
Ret Fr
Approved/
Due From
Remarks
No.
Para. No.
Submittal
Days
Contr.
CEL
CEL
Disapproved
Contracting
1
1000-9
Letter
Qual. Cont Plan
10 WD after NTP

Para 3.14-B

1000-12 Para 3.17-D

1000-15 Para 3.22-A Drawings & elec media

Work Clear.

Request AS-Built Drawings

AF Form 103 – with signatures 10 WD after Final Inspection

5 WD before work needing done is started

1001-1 Paragraph 3.1

Letter or Form

Entry authorization list

20 WD prior to starting site work

1002-1 Para 1.1.A

Letter of qualification

Certification of Start-up Technician

10 WD before acceptance testing of installed Generator

6
1002-1

Para 1.1.B

Data
Documentation of joint inspection
10 PTS of unit to installation location
7
1003-1

Para. 1.1.A&B

Letter and Shop Dwgs/manu. lit
Back up power plan/ secondary

Containment product 10 WD after NTP

8
1360-6

Para 7.1.6

Data
Hazardous Materials
10 PSW and for final quantities 10 PFA

1360-9 Para 11.5.6

1732-2 Para 1.5.A

1732-2 Para 1.5B Disposal Documents

Manuf. Lit

Letter Solid Waste Disposal Documents and Weight Tickets

Secondary Containment System

Demolition Plan

10 PFA

10 PSW

10 WD after NTP

12
2085-8 Para 1.12A
Letter
Asbestos removal work plan
10 PSW on any asbestos removal
13
2085-8
Letter
Glove Bag Certification of workers
10 PSW

Para 1.12.A.1

14
2085-8
Letter
Glove Bag Emergency Plan
10 PSW

Para 1.12.A.2

15
2085-8

Para 1.12.A.3

Letter
Respirator Program
10 PSW
16
2085-8
Letter
Air Monitoring Plan
10 PSW

Para 1.12.A.4

17
2085-8
Letter
Testing Lab Information
10 PSW

Para 1.12.B

18
2085-9, Para 1.12.C
Test Results
Air Monitoring Results
3 WD after sample taken

SUBMITTAL SCHEDULE

New Generators Wing I MAFS

SCHEDULED DATES

1
2
3
4
5
6
7
8
9
10
11
Sub.
Spec. Sec.-
Type
No. of
Date
Date
Date
To Contr.
Resubmittal
ID
Page No. &
of
Description of Material
Sub
Rec. Fr.
to
Ret Fr
Approved/
Due From
Remarks
No.
Para. No.
Submittal
Days
Contr.
CEL
CEL
Disapproved
Contracting
19
2085-9

Para 1.12.E

Data
Landfill documentation
10 WD PFA
20
3300-1

Para 1.3.A-F

Data
Mix design, test results
10 WD PSW for test results 10 PFA
21
99000-1

Para 1.1.1

Data
Manufacturer Lit.
10 WD PSW
22
15040-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
23
15055-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
24
15060-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
25
15080-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
26
15090-1

Para 1.4.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
27
15090-1 Para 1.4.B
Shop Dwg
Seismic Bracing For Pipe
10 WD PSW
28
15100-2 Para 1.4.A & B
Data and Install. Instr.
Cat Cuts/ Manu Lit.
10 WD PSW
29
16110-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
30
16120-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
31
16125-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
32
16130-1

Para 1.3.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
33
16130-1

Para 1.3.B

Data
Cat Cuts/ Manu Lit.
10 WD PSW
34
16400-1

Para 1.2.A

Data
Cat Cuts/ Manu Lit.
10 WD PSW
CDR = Calendar Days after ReceiptPSW = Prior to Start of WorkATOS = After Taking Sample PFA= Prior to final acceptance
ANTP = After Notice to ProceedPTS = Prior To ShipmentPTI = Prior To Installation

Submittal Schedule -

File details come from the government source that posted it. Updated .