This document is Amendment 2 (Q&A) to a solicitation for the purchase and delivery of 1 Walk-In Freezer. The solicitation was issued by the Department of the Air Force Global Strike Command. The key details are:
The government will be responsible for removing the old walk-in unit. The new unit will connect to 600V power and a drain located in front of the unit. There will not be a site visit, and no ramp is needed. The freezer will store rolls of chemicals with an estimated total weight between 725-900 lbs. The distance from the dock to the final location is approximately 100-120 ft. The government will handle any required hot work permits. The ceiling height is 15 ft with hanging lights at 12 ft, and the installation location has a 10 ft garage door with no other access restrictions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Freezer Drawing.pptx | PPTX presentation | |
| LO Freezer QA.pdf | ||
| Synopsis and Solicitation - LO Freezer - FA462524Q1120 - Signed.pdf | ||
| Clauses and Provisions FULL LIST - FA462524Q1120.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 2 (Q&A)
1. Is there an existing walk-in that needs to be removed?
0. No, the government will be responsible for removing the old unit.
1. What are the utilities onsite that we will be connecting to?
1. 600 volts, drain located in front of unit
1. Will there be a site visit?
2. There will not be a site visit.
1. Will a ramp be needed?
3. No ramp is needed
1. What will be stored inside the walk-in?
4. Rolls of chemicals, estimated total weight would be between 725 and 900 lbs.
1. How far is the dock from the final location?
5. Roughly 100-120 ft
1. Who is responsible for hot work permits if required?
6. The government will handle hot work permits if required
1. How tall is the room that this will be installed in?
7. The ceiling is 15 ft tall, with hanging lights at roughly 12 feet off the ground
1. What are the doorway measurements?
8. There is a 10 ft garage door at the installation location, no constrictions.