Questions and Answers UPDATED.pdf
PDF 72 KB Posted
- Attached to
- Whiteman AFB - Kitchen Equipment Federal contract opportunity
- Solicitation number
- FA462524Q1087
About this file
This document contains Questions and Answers related to a federal contract opportunity for the purchase and delivery of Kitchen Equipment for Whiteman AFB.
The key details are: There are no model numbers or drawings available, as this is not a brand name requirement. The contractor will be responsible for unloading via delivery truck liftgate, but a forklift will not be provided. The bid schedule does not delineate which equipment is going to the Ozark Dining Facility and which is going to the In-Flight Kitchen, so refer to the attachment for updates. There are no specific power or size requirements, and no particular brand is required. The kitchen items will need to be uncrated and moved to a storeroom, but the installation will be managed in-house. For the twin twist ice cream machine, a counter top, water-cooled model with 208-230 volts, 60 hz, and single phase is required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers UPDATED 3.pdf | ||
| Questions and Answers UPDATED 2.pdf | ||
| Questions and Answers.pdf | ||
| Bid Schedule DFAC EQUIPMENT UPDATED.pdf | ||
| Bid Schedule DFAC EQUIPMENT.pdf | ||
| Kitchen Equip Prov.pdf | ||
| Kitchen Equip SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
a. Do you have model #’s for the items listed on the attached?
• No, we do not have model numbers as this is not a brand name requirement.
b. What are the power requirements for the equipment that does not specify power requirements?
• There aren’t any specific power requirements.
c. Are there drawings we could use to verify the required size of equipment?
• No, there are no drawings.
d. Who is responsible for unloading and will a forklift be provided?
• The contractor will be responsible for unloading via delivery truck liftgate.
We do not have a forklift that can provided.
e. The Bid Schedule DFAC EQUIPMENT does not delineate what equipment is going to the Ozark Dinning Facility and In-Flight Kitchen. Which equipment is going to which locations?
• Refer to attachment for updates
f. Some of the equipment on the schedule lists sizing. Is the size of equipment inconsequential if no size is listed? If it is consequential, what sizes are required?
• Refer to attachment for updates
g. Do you require any particular brand for any of the equipment?
• No
h. Concerning delivery of equipment to each kitchen, do you require the equipment to be uncrated and set in place?
• Items will need to be uncrated and will need to be moved to storeroom.
i. What hinge placement do you require on the reach-in equipment. Left, or right?
• To the right for all the equipment that have one door, and if the equipment has two doors have them open from the center out.
j. Will the kitchen items require installation, or will that be managed by another party?
• Install will be managed in-house
k. If the kitchen items do need to be installed, is there a floor plan available, or will it be provided after an offer letter is issued?
• Install will be provided in-house
l. Is there a specific identification reader used by the staff on base?
• No
m. in reference to the twin twist ice cream machine, full standing or counter top?
Single phase or three phase? Air cooled or water cooled? How much capacity?
• We need a counter top model, wheels not required, water cooled. 208-230 volts 60 hz and PH 1.
File details come from the government source that posted it. Updated .