Attachment_1_-_Statement_of_Work_(Revised).docx
DOCX document 12 KB Posted
- Attached to
- Replace Rubber Fall Zone Federal contract opportunity
- Solicitation number
- Fa4625-16-R-0018
About this file
Attachment 1 (Statement of Work) Revision
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_SOW_Repair_Rubber_Play_Surface_and_Equipment_(14_Sep_16).pdf | ||
| SOW_Revised_Repair_Rubber_Play_Surface_and_Equipment_(13_Sep_16).docx | DOCX document | |
| FA4625-16-R-0018 _Replace_Rubber_Fall_Zone-Equipment_(Questions).pdf | ||
| Revised_SOW_Repair_Rubber_Play_Surface_and_Equipment_(1_Sep_16).pdf | ||
| FA4625-16-R-0018 _Replace_Rubber_Fall_Zone_(Solicitation_with_Attachments).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FY16 Repair/Replace Child Fitness Equipment – Demo and Apply Rubber Fall Surface Building 3211 TLF Children’s Fitness Area Whiteman Air Force Base, Missouri 65305 25 August 2016
F4E3ZA5167AW01
Purpose: Statement of work is to accomplish repair/replacement of child’s fitness equipment. Also work is required to remove and dispose of existing rubber fall zone and install new 3.5” thick fall zone for 8’ Child Fall Height (CFH). Contractor shall provide disposal of all removed equipment, existing fall zone materials, and all refuse created from new installations.
1. Contractor shall provide all materials, equipment, labor, disposal, and installation of newly provided equipment.
2. Contractor shall provide the flowing child fitness equipment and installation after removal of equipment that is currently installed. Contractor shall match existing equipment or equal.
a. Game Time or equal – Remove Mini Bike Install G2 P/N 6231 Feature - 1 EA.
b. Game Time or equal – Remove Coil Spring Whale feature and Install Log Roll P/N 81704 1 EA.
c. Game Time or equal – Remove Volcano Climb Structure Install Rock Scape Triad Climber P/N 7101 1 EA.
Contractor shall provide all necessary hardware for installation, digging, quick-set concrete installation.
3. Contractor shall remove existing rubber play surface 2673 S.F. and provide disposal of existing rubber play surface material.
Contractor shall install new Poured in place safety surfacing - @ 3.5” thick for 8’ CFH. Mix of safety surface shall be of 50% black and 50% blue rubber aggregate. Total area to be covered is 2673 S.F.
4. Contractor shall provide all barriers to keep area safe and to insure surfaces are not disturbed while curing.
5. Contractor shall provide final cleanup of the affected areas.