Contractor Questions Answers Dated 14 Sep 15
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Initial_Site_Visit_Minutes_(FBO_Post)_-_Areas_1 2 3 4.pdf | ||
| SOW_-__Areas_1 2 4_-_31_Aug_2015.pdf | ||
| SOW_-_Area_3_-_31_Aug_2015.pdf | ||
| SOW_-_Area_3.pdf | ||
| Land_Prep_Areas_1 2 3 4_Combo.pdf | ||
| SOW_-__Areas_1 2 4.pdf | ||
| Tobacco_Use_Policy_and_Map.pdf | ||
| Foreign_National_Access.pdf | ||
| Generic_RFQ_Form_Land_Prep_Area_3_ _Areas_1 2 4.pdf | ||
| Cell_Phone_Use_-_Union_Exemption_Version.pdf | ||
| Map_-_Area_3_ _Areas_1 2 4.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers, 14 Sep 15
1: Please provide an approximate length of silt fence that will be needed.
Answer: As outlined in the SOW, the waterways are not to be disturbed except for mowing.
If silt fence is required, the quantity is the responsibility of the Contractor. No land disturbance permit is required.
2: Are you expecting a Stormwater Pollution Prevention Plan (SWPP) for this work?
Answer: As outlined in the SOW, the waterways are not to be disturbed except for mowing.
SWPP is not required. No land disturbance permit is required.
3: Please describe in greater detail the method of seeding. It appears it is your intention to broadcast the seed.
Answer: It will be broadcasted per the SOW.
4: Do you expect any lime or fertilizer to be added to the land?
Answer: SOW does not require any additives to the soil.
5: There are a couple areas of mature trees running through Area 4. Do you want these trees removed?
Answer: Trees over 8" in diameter will be left in place. Contractor shall work around them.
6: Will we be allowed to burn on site?
Answer: Yes.
7: There is at least one small structure on Sector 3 of Area 3. What do we do with it?
Answer: The small structure is not a part of this requirement. Any structures shall not be disturbed.
8: There are chat driveways all along Area 3. Do you want the chat left in place and disked in or do you want it dug up and removed from the site?
Answer: Do not disturb the chat driveways.
9: There is a row of trees along D Highway in Area 1. Do they remain?
Answer: The trees are not to be removed and are not part of this requirement.
////LAST ITEM////